info@kandbscreeding.co.uk

Free tool

Screed Calculator: How Much Screed Do I Need?

Enter your floor area and depth to estimate the volume of screed, the cement and sand for a traditional mix, the liquid screed to order, a typical drying time and a typical 2026 price range.

Screed volume
1.43 m³
Weight (approx.)
2.9 tonnes
Cement (25kg bags)
25 bags
Sharp sand
2.4 tonnes
Typical drying time
about 13 weeks
Typical 2026 price range
£360 to £500

Estimates only. Prices are typical UK supply and lay figures from published 2026 cost guides, not a quote from us.

How the calculator works

Volume is the floor area multiplied by the depth: area in m² × depth in mm ÷ 1,000 = m³. The waste allowance is then added.

Sand and cement: laid screed weighs roughly 2,100kg per m³. In a 1:4 mix by weight, about one fifth is cement and four fifths sharp sand, so each m³ needs about 420kg of cement (roughly 17 bags of 25kg) and 1.7 tonnes of sand.

Liquid screed is ordered by the cubic metre from the plant, so the calculator rounds the volume up to the nearest 0.5m³.

Drying time uses the common rule of thumb of one day per millimetre for the first 40mm and two days per millimetre beyond that, in good drying conditions. Liquid screed can often be force dried with underfloor heating, so it may be ready sooner. Read how long screed takes to dry before booking your flooring.

Prices use the 2026 supply and lay ranges published by MyJobQuote: about £18 to £25 per m² for sand and cement and £24 to £31 per m² for liquid screed. Our floor screeding cost guide explains what moves a price up or down.

Choosing the right depth

Floating sand and cement screed over insulation is typically at least 65mm in homes and 75mm in commercial buildings. Liquid screed can be from about 35mm, with at least 25mm of cover over underfloor heating pipes. Our screed thickness guide has the full figures.

Worked example: a 20m² extension at 65mm

20m² × 65mm ÷ 1,000 = 1.3m³. Add 10% for waste and you need about 1.43m³. In a 1:4 sand and cement mix that is roughly 600kg of cement (24 to 25 bags of 25kg) and 2.4 tonnes of sharp sand, about 3 tonnes laid. As liquid screed you would order 1.5m³.

How much screed per m²?

DepthVolume per m²Cement (1:4)Sharp sand
50mm0.05m³About 21kg (0.8 bag)About 85kg
65mm0.065m³About 27kg (1.1 bags)About 110kg
75mm0.075m³About 32kg (1.3 bags)About 126kg

Figures are per m² of laid sand and cement screed, before any waste allowance, using 2,100kg per m³ and 25kg bags of cement.

FAQs

Frequently asked questions

How do I calculate how much screed I need?

Multiply the floor area in square metres by the depth in metres. For example, 30m² at 65mm is 30 x 0.065 = 1.95m³ of screed. Add about 5 to 10% for waste and uneven bases.

How many bags of cement do I need for screed?

For a 1:4 cement to sand mix, allow roughly 17 bags of 25kg cement and about 1.7 tonnes of sharp sand for every cubic metre of laid screed. The calculator above works this out for your floor, including a waste allowance.

How many bags of cement do I need per m² of screed?

At 65mm in a 1:4 mix, about 1.1 bags of 25kg cement and 110kg of sharp sand per m², before waste. At 75mm it is about 1.3 bags. Use the calculator above for your own area and depth.

How much does a tonne of screed cover?

Laid screed weighs roughly 2 tonnes per cubic metre, so one tonne covers about 7.7m² at 65mm deep or about 10m² at 50mm deep.

How deep should my screed be?

It depends on how it is laid. Floating sand and cement screed over insulation is typically at least 65mm in homes and 75mm in commercial buildings; liquid screed can be from about 35mm. See our screed thickness guide for the full figures.

Is the calculator a quote?

No. It gives quantity and typical market price estimates only. Depth, access and preparation all change the real cost, so we give every customer a fixed quotation within 24 hours.

Free, no-obligation quote

Want an exact price?

Send us the area, the depth and your postcode. We call back the same day and your fixed quotation will be ready within 24 hours.