Latex over boards and tiles in Walthamstow refits
Latex screed comes as a pair: a bag of cement based powder and a drum of latex liquid, which goes into the mix where water would normally be used. Stirred together they form a thin compound that holds onto bases an ordinary water-mixed product may not suit, and that is why floor layers turn to it in older houses.
In Walthamstow and Leyton, Edwardian terraced houses are being extended at the back and side, with the ground floor often refitted at the same time. Wherever a refit meets timber, latex never goes straight onto bare floorboards. The boards are screwed down tight, then covered with flooring grade plywood fixed closely enough that nothing moves, and the latex is spread across the ply. Board edges and screw heads vanish under a few millimetres, so a sheet finish lies without ridges.
Old quarry and ceramic tiles are the second case. When every tile is firmly bonded, lifting them can do more damage than leaving them in place, and latex can go over once the glaze is cleaned and primed. Any tile that sounds hollow when tapped comes up first.
The third case is old adhesive. Where carpet or vinyl has been pulled up and the residue underneath is hard and sound, some latex products will cover it after priming. Soft or powdery glue is scraped or ground away before anything goes on.
Each base takes its own primer: concrete, sand and cement, plywood and tile all differ, and a calcium sulphate screed always has its laitance taken off and a matching primer applied. When the floor needs proper work before any of this, our floor preparation service covers it.
When latex is not enough in Waltham Forest homes
Latex is a finishing layer. It cannot stiffen a floor, stop damp or rebuild a slab, and part of the job is saying so before anyone orders a roll of vinyl.
Springy boards are the first warning sign. If a timber floor bounces underfoot, that movement will crack a thin compound, so loose boards are fixed and the floor overboarded before latex is considered. Damp is the second. Plenty of older ground floors in this borough were laid with no damp course, and a few millimetres of latex will not hold back moisture rising from beneath. The floor is tested, and sometimes it has to be dug out and rebuilt as a sand and cement floor with a membrane.
Level is the third. Latex smooths a surface; it is not made to fill a hollow or correct a slope. Across a sagging old slab, the right first step may be a levelling coat for uneven floors or a fresh screed, with latex kept for the final skim.
The finish also decides whether latex is needed at all. Sheet vinyl, lino, rubber and safety flooring show every flaw beneath them, and LVT and carpet look better on a smooth face too. Tiles laid on a solid adhesive bed often manage without it. If the property is over the boundary, see latex screed in Hackney.
Side infills around Markhouse Road and St James Street
The Warner homes around Markhouse Road and St James Street, like other Edwardian terraces in Walthamstow and Leyton, mean kitchen extensions, side infills and ground floor refits. A side infill creates a particular latex job: one new kitchen floor running across three or four different bases.
Typically there is a new screed in the infill itself, a strip of old concrete where the back wall of the house stood, the original kitchen floor and perhaps a timber floor in the room next door. The owner wants one continuous sheet of vinyl or LVT across all of it.
Preparation is done base by base. The new screed must be dry before anything goes on it, and is prepared and primed to suit its material. The old concrete is cleaned of adhesive and primed to control suction. Any timber section is screwed down and overboarded with flooring grade plywood. Where the levels of the old and new parts differ by more than a thin coat can take, the low side is built up first.
Only then is the latex mixed and spread a few millimetres thick across the whole floor. A break in the structure, such as the joint between the infill slab and the old house, may need to be carried through the finish rather than covered over. The infill floor itself is often a pumped liquid screed.
How we price latex screed in Waltham Forest
A fixed written price within 24 hours, once we know the area and the base. See our floor levelling cost guide.
Who lays your latex screed in Waltham Forest

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.
See what customers say in our Google reviews and on our testimonials page.
Latex screed from Slough to Waltham Forest
As the crow flies, our base in Slough is about 27.9 miles from Waltham Forest, which lies to the east. Postcodes here include E4, IG8, E17 and E10, and Redbridge (3.2 miles), Chigwell (3.9 miles), Hackney (4 miles) and Haringey (4.8 miles) are close by.
More on latex screed, part of our screeding services. For every screed we lay locally, see floor screeding in Waltham Forest.
Further reading: latex, self levelling compound or screed.