info@kandbscreeding.co.uk

Floor Levelling · Surrey

Floor Levelling and Self Levelling Screed in Reigate

We level uneven floors in Reigate with self levelling compound, ready for LVT, vinyl, large tiles, carpet tiles or engineered wood. Two kinds of building drive the work. Reigate has been home to office occupiers such as Canon UK, Kimberly-Clark and esure, and refurbishments on that scale need preparation and levelling before new finishes or raised floors go in. In homes, knock-throughs on 1930s and 1950s houses often join floors that sit at different heights.

Office refurbishments in Reigate: levelling before new finishes

When an office is stripped back to the slab, the floor that emerges is rarely ready for a new finish. Old adhesive, patched screed, cable trenches and years of wear leave dips and ridges that show straight through thin flooring.

Flatness is judged against BS 8204, using a 2m straightedge. SR1 permits a gap of no more than 3mm, SR2 permits 5mm and SR3 permits 10mm. SR1 is the class many thin sheet finishes call for, and large format tiles need a similar standard, so a floor that carried carpet happily can fail the new specification.

Levelling compound closes that gap. Most of it goes down at 2mm to 10mm or so, and some products are made for more. The base is cleaned first and primed to suit what it is, whether concrete, sand and cement, calcium sulphate or residue from old flooring. Compound that lifts has often been laid over the wrong primer.

Where a raised access floor is being installed, the slab beneath still needs to be sound, clean and within the system's tolerance, and preparation comes first. If an office slab is badly worn, grinding the concrete comes before any compound. On a large floor, the work can be phased zone by zone, and fast drying compounds keep the fit-out moving, so the flooring contractor can usually follow within a day or so rather than waiting weeks as they would after a full new screed. Each zone must be empty and closed while it cures.

Evening out Woodhatch knock-throughs before new flooring

Knocking through at the back of a 1930s or 1950s house creates one large room from spaces that were floored at different times. The extension floor is new and flat; the old kitchen and dining room floors may have settled or were never quite level. Where they meet, a ridge or step appears, and LVT or engineered wood will show it.

A thin pour of compound blends the old and new floors and fills the shallow hollows, letting the new LVT or wood run straight across where the rear wall used to stand. It is a finishing layer, though, not a structural one. Pile it on thick to save a floor that is past saving and it will crack or come unstuck. So if the old kitchen floor rings hollow, is breaking up or is further out than compound can cope with, replace it with a new hand-laid screed in Reigate. Where the base is solid and only a thin build-up will fit, latex screed is worth considering.

The programme is short. A levelled floor is normally ready for the flooring fitter far sooner than a new screed would be.

How we price floor levelling in Reigate

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Reigate

Finished floor screed in a plain walled room
Finished floor screed in a plain walled room.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Reigate

As the crow flies, our yard in Slough is about 27.8 miles from Reigate, which lies to the south-east. Postcodes here include RH2, KT20 and RH1, and Redhill (1.5 miles), Horley (4.9 miles), Dorking (5.4 miles) and Caterham (6.3 miles) are close by.

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Reigate: your questions

Does a raised access floor need levelling underneath?

The pedestals of a raised floor can be adjusted, but the slab under them still has to be sound, clean and within the system maker's tolerance. Loose screed, dust and deep hollows are dealt with first, and where the slab is badly out it is levelled or ground before the floor installer starts. Each system's own data sheet sets the limits.

Can levelling compound go over old tiles in a Reigate kitchen?

Sometimes. Where the old kitchen tiles are stuck fast, clean and unpolished, certain compounds will take over them once the right primer is on. Any tile that is loose or sounds hollow has to be lifted beforehand. If the kitchen floor underneath has failed, compound on top only hides the problem for a while, and a new screed is the better route.

What does SR2 mean on a flooring specification?

SR2 is one of the surface regularity classes set by BS 8204. On an SR2 floor, no gap under a 2m straightedge should exceed 5mm. SR1 is stricter at 3mm, and SR3 allows 10mm. Thin finishes such as vinyl sheet often need SR1, while carpet tiles may accept SR2. Check the fitting instructions for your chosen flooring to see which class it needs.

Nearby

Floor Levelling near Reigate

Free, no-obligation quote

A fixed price for your Reigate floor