info@kandbscreeding.co.uk

Latex Screed · Hampshire

Latex Screed in Alton

For an Alton refit, latex screed is the thin, two part compound we lay over a sound but awkward base so that sheet vinyl, LVT, lino or carpet sits smooth. It goes a few millimetres deep over flooring grade plywood, firmly fixed old tiles and patchy slabs. Homes built between 1973 and 1999 make up 27% of Alton's stock, and refitting a kitchen or bathroom of that age usually means lifting an old covering and dealing with whatever lies beneath.

Latex screed for kitchen and bathroom refits in Alton

A refit rarely starts with a clean slab. In a kitchen or bathroom from the 1970s, 1980s or 1990s, pulling up the old vinyl or tiles tends to reveal a patchwork: a strip of screed where a wall came out, timber boards in an upstairs bathroom, ceramic tiles someone left in place last time, and glue across the lot.

Latex screed is designed for that. The cement powder is stirred into a latex liquid rather than water, and the latex gives the set layer a little flexibility and a strong grip. Spread just millimetres deep, it closes up grout lines, board joints and small hollows so the new finish has nothing to telegraph.

Each base is treated in its own way. Timber floors get a layer of flooring grade plywood screwed down firmly over them, and the latex goes on the ply; it never goes on bare boards. Glazed or quarry tiles can stay if every one is solidly bonded, with the surface cleaned and primed. Sound concrete takes latex once dust and loose patches are removed, and some old adhesive can stay if it is thin and firmly stuck. A screed that turns out to be calcium sulphate has its laitance taken off and is primed before anything else.

The finishes that need this smoothness are the thin, flexible ones: sheet vinyl, LVT, lino, rubber and safety flooring, plus carpet where a smooth base stops wear lines. On a project that also takes in a ground floor extension, the Alton floor levelling page covers bringing the wider floor into line.

Damp, bounce and slopes in older Alton cottages

Latex makes a good floor better. It does not rescue a poor one, and three faults rule it out until they are fixed.

Moisture comes first. Old solid floors, like the uneven ones in Alton's older cottages and terraces, are worth testing for damp before anything goes on them. Latex is not a membrane, so if a test shows moisture coming through, the floor needs dealing with properly, often by digging out and relaying with insulation and a membrane under a new sand and cement floor.

Movement is next. A timber floor that bounces will crack any thin cement layer laid on it, latex included. The joiner refixes the boards and overboards with ply before we return.

Level is the last. A cottage floor that has sunk a long way at one side needs a screed to fill it, not a deep pour of compound. Broken or hollow patches can be cut out first under our screed repairs service.

In the brewery redevelopment, the care home and extra care building are the kind of setting where safety flooring and sheet vinyl are common, and the same rule applies there: a sound, dry, primed base first, latex second. Counting conversions as well as blocks, flats make up 25% of Alton's homes, and an upstairs flat can mean timber, concrete or an old screed under the covering, each with its own primer.

How we price latex screed in Alton

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who lays your latex screed in Alton

Finished floor screed in a large glazed room
Finished floor screed in a large glazed room.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Latex Screed from Slough to Alton

Alton is about 30.1 miles south-south-west of our Slough base as the crow flies, with postcodes including GU34. The nearest towns to it are Farnham (8.9 miles), Basingstoke (9.6 miles), Petersfield (10.1 miles) and Fleet (10.8 miles).

More on latex screed, part of our screeding services.

FAQs

Latex Screed in Alton: your questions

Can latex screed go over old quarry tiles?

Yes, if every tile is firmly bonded and the floor is dry. We clean off grease and polish, check for hollow or loose tiles, replace or fill any that move, then prime before the latex goes on. If a lot of the tiles ring hollow, they come up instead, because latex only holds as well as the tiles underneath it.

Is latex screed waterproof for an Alton bathroom?

No. It copes with a bathroom once the vinyl or tiles are sealed over it, but it is not a damp proof layer or a tanking system. Water from a shower should be stopped by the finish and any tanking above, and moisture from below needs a membrane in the floor. We test old solid floors for damp before laying.

Do I need a primer before latex screed?

Always. The primer controls how fast the base draws water from the latex and helps it bond. Concrete, plywood, old tiles and adhesive residue each take a different primer, and a calcium sulphate screed needs its laitance removed and a compatible primer. Skip it and the latex can crack, pinhole or come away. For neighbouring towns see latex screed in Farnham.

Nearby

Latex Screed near Alton

Free, no-obligation quote

A fixed price for your Alton floor