info@kandbscreeding.co.uk

Latex Screed · Cambridgeshire

Latex Screed Contractors in Chatteris

K & B lays latex screed in Chatteris, a two part compound spread a few millimetres thick to give sheet vinyl, LVT, lino, rubber and carpet a smooth base over plywood, old tiles or uneven concrete. In this town the damp check comes before anything else. Older Victorian houses near the centre may have floors with no damp proofing at all, and latex is a smoothing layer that cannot hold moisture back.

Latex for refits in Chatteris bungalows and houses

Late twentieth century detached homes and bungalows dominate the housing here. Detached homes alone make up 37% of Chatteris, and by the time a kitchen or bathroom in a house of that age is replaced, the floor underneath is often a mix: concrete with old patch repairs, a band of tile adhesive where units once stood, perhaps an area of ceramic tiles left in place from an earlier fit.

Latex screed is the trade's answer to that mixed surface. The powder is cement based, and a latex liquid takes the place of water when it is mixed. The result is a slightly flexible compound that bonds well to difficult bases and can be spread thin, typically a few millimetres, to give one smooth finish over the lot.

Preparation then differs from base to base. Firmly bonded quarry or ceramic tiles stay, after the surface is cleaned and primed for tiles. Thin, well stuck adhesive can sometimes be primed over, while loose or heavy residue is removed by diamond grinding of the slab. Uneven older concrete is swept, vacuumed and primed.

Timber floors follow a separate routine. Latex never goes over bare floorboards, because boards move. They are screwed down and covered with flooring grade plywood, and the latex follows on the primed plywood.

The finishes that gain from all this are the thin ones: sheet vinyl, LVT, lino, rubber and bathroom safety flooring, each of which would otherwise show every ridge beneath it.

Damp, movement and level in Chatteris floors

A latex layer smooths a sound floor. It cannot make an unsound one sound, and in Chatteris three problems need fixing first.

Damp is the one to watch. The ground around town is peaty fen, and an old solid floor without a membrane can draw moisture up into whatever is laid on it. A hygrometer test comes before priming. If the reading is high, the fix is a membrane and a new insulated floor, described on the Chatteris sand and cement screed page, rather than a thin compound.

Movement is next. Springy boards or a cracked, rocking slab will break the latex. Boards are fixed and overboarded, and failed concrete is cut out and replaced.

Level is the third. When a floor is badly out, a few millimetres of latex will not reach. A deeper levelling product or a new screed brings it up first.

Primers complete the preparation. Concrete, tiles, plywood and adhesive each need a compatible one. A newer home may have a calcium sulphate screed, and that has its laitance sanded off and is always primed before latex. Heavier cleaning is covered by our floor preparation work, and the neighbouring town is covered on our page for latex screed in March.

How we price latex screed in Chatteris

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who lays your latex screed in Chatteris

Wide view of a finished screed in a glazed extension
Wide view of a finished screed in a glazed extension.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Latex Screed from Slough to Chatteris

Chatteris is about 70.5 miles north-north-east of our Slough base as the crow flies, with postcodes including PE16. The nearest towns to it are March (6.5 miles), Ely (9.9 miles), Whittlesey (10.1 miles) and St Ives (10.6 miles).

More on latex screed, part of our screeding services.

FAQs

Latex Screed in Chatteris: your questions

Can latex go over old quarry tiles in a Chatteris kitchen?

Often, yes, provided the tiles are firmly bonded. We tap across the floor, lift any tile that sounds hollow and fill the gap. The glazed surface is cleaned and given a primer made for tiles, then latex is spread a few millimetres thick to hide the grout lines. In an older house near the centre we take a moisture reading first, because a floor with no damp proofing would lift the new finish.

Can latex go over old adhesive on a Chatteris bungalow floor?

Sometimes. Where the residue is thin, hard and well bonded, a primer and latex can go straight over it. Adhesive that is soft, thick, flaking or patchy has to come off first, usually by grinding, or the latex will only be as strong as the residue under it. We test the bungalow floor and tell you which applies before quoting.

Does safety flooring in a bathroom need a latex base?

Usually, yes. Safety flooring is thin, so any board joint, screw head or grout line beneath it will show through and wear faster. A latex layer over primed plywood or a sound concrete base gives it a smooth, even bed. In a Chatteris bathroom we also check the base for damp first, since latex will not stop moisture.

Free, no-obligation quote

A fixed price for your Chatteris floor