info@kandbscreeding.co.uk

Floor Levelling · London

Floor Levelling and Self Levelling Screed in Croydon

Self levelling compound is how we take the dips and humps out of Croydon floors so that LVT, vinyl, big tiles or engineered wood sit true. New Addington's semis need extension slabs and levelling, and 20% of Croydon's homes were built between 1945 and 1972. Where a floor is sound but uneven, compound fixes it; where it has failed, we will tell you a new screed is needed instead.

Flat floors for New Addington semis and extensions

New Addington began in 1935 as a garden village on Fisher's Farm, and post war prefabs and semis were added later. Those semis need extension slabs and levelling, and the two jobs are linked. When a new extension floor meets the original house, the levels rarely match exactly, and a floor covering laid across both will show the join. A thin compound layer bridges it and gives one continuous surface, so LVT or large tiles run from the old kitchen into the new room without a visible step.

Under BS 8204, the test is a 2m straightedge and a feeler: SR1 means 3mm at most beneath it, SR2 5mm, SR3 10mm. Many thin sheet finishes need SR1, which an older floor seldom meets on its own.

A typical pour is somewhere between 2mm and 10mm deep, and a few products are made to go thicker. Before it, we clean the floor, scrape off anything loose and prime for the base underneath, whether that is concrete, sand and cement, calcium sulphate or the remains of old adhesive. Mismatch the primer and the compound can peel up later. Where the base itself needs work, floor preparation comes first.

Levelling compound will not rescue a floor that has given up. Poured too deep over a hollow or crumbling base, it can crack and debond. Floors like that need a new screed; see Croydon sand and cement screed.

Shop and unit refits on Purley Way

Purley Way is Croydon's main commercial corridor, with retail parks including Valley Park. In the town centre, the Whitgift Centre and Centrale anchor the shopping. When a unit in either place is refitted, the new floor finish may need a flatter base than the old one had.

A shop floor is usually levelled after the old finish comes up. Carpet tile adhesive, old vinyl and patch repairs all have to be dealt with before compound goes down, and concrete floor grinding removes coatings and high spots. Then the floor is primed and a fast drying compound is poured, so the fitters can follow quickly and the unit opens on time.

The Purley Way masterplan proposes more than 100,000 square metres of industrial floorspace alongside new homes, and new units will need level floors for their tenants' finishes too. For larger commercial screeds rather than a skim, see commercial screeding in the borough.

We do not sand wooden floors, lay resin or polish concrete. Our part is the flat, sound base those finishes need.

How we price floor levelling in Croydon

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Croydon

Finished floor screed seen from the stairs
Finished floor screed seen from the stairs.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Croydon

As the crow flies, our yard in Slough is about 26.8 miles from Croydon, which lies to the east-south-east. Postcodes here include CR0, CR5, CR8 and CR7, and Sutton (3.7 miles), Caterham (5.7 miles), Bromley (5.8 miles) and Merton (6.3 miles) are close by.

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Croydon: your questions

How flat does a floor need to be for LVT in Croydon?

Usually SR1. Lay a 2m straightedge anywhere on it and the gap underneath must never exceed 3mm. Anything rougher shows through the finish. Older Croydon floors, especially where an extension meets the original house, often need a skim of compound to get there, laid over the primer the base calls for.

Can you level a Croydon shop floor over a weekend?

Sometimes, depending on the floor area and what the base is like. Fast drying compounds keep the programme moving, so a sound floor can often be levelled and handed to the fitters quickly. The old finish and adhesive need removing first, which can take longer than the pour itself, so we look at the floor before fixing a date.

When does a floor need a new screed instead of levelling compound?

Once the screed is breaking up, drummy, loose or further out than a compound can safely make up. Most compounds are laid up to around 10mm, and pouring much deeper to disguise a failed floor risks cracking and debonding. In an older Croydon house, a floor with no damp proof membrane is another reason to replace rather than level, since compound will not stop damp.

Free, no-obligation quote

A fixed price for your Croydon floor