Floor Levelling · London

Self Levelling Screed and Floor Levelling in Sutton

When a Sutton floor is too uneven for engineered wood, LVT, vinyl or large tiles, we flatten it with self levelling compound. Two kinds of floor usually need it: the joins where a new extension meets an older house, and shop, office and industrial units being refitted between tenants. Sutton has both, with inter-war housing across the borough and commercial floors from the St Nicholas centre to Beddington Lane. A thin compound fixes a sound floor that is simply not flat enough.

Levelling where Sutton extensions meet older floors

The test for flatness is a 2m straightedge, and BS 8204 divides floors into three classes by the gap under it: 3mm for SR1, 5mm for SR2, 10mm for SR3. Thin sheet finishes often insist on SR1, and LVT or big tiles show hollows that a carpet would have hidden.

Older floors often fall outside that. Sutton has 14% of its homes from 1945 to 1972 and 18% from 1973 to 1999, and a floor of that age can be solid and dry yet uneven after decades of wear and earlier flooring. The line where an extension joins the old house often has a small lip or slope as well. Compound, normally poured between about 2mm and around 10mm thick, evens that out so the new flooring carries on without a break.

Preparation decides whether it lasts. We clean the floor, fix any loose or hollow-sounding patches, then prime it with a product chosen for what the base is: concrete, sand and cement, calcium sulphate, or an old floor that is still sound.

Compound is not a repair for a failing floor. Pour it deep to make up for a floor that really wants a screed, and it may crack and come away. If the screed below is breaking up, screed repairs or a new sand and cement screed in Sutton come first, and levelling follows.

Shop, office and unit floors from Times Square to Kimpton

When a shop or office unit in Sutton town centre, around the St Nicholas centre and Times Square, is stripped and refitted, the new fit out needs a clean, flat base for its carpet tiles, vinyl or LVT, and the programme is usually tight. Fast drying levelling compounds help here, taking foot traffic quickly and letting the flooring contractor follow on soon after.

Old adhesive, paint and tile residue have to come off before priming. Concrete floor grinding is the usual way back to a clean, sound surface that compound will bond to.

The Beddington industrial area along Beddington Lane, one of the borough's three Strategic Industrial Locations alongside Kimpton and Imperial Way, is a different case. Heavy duty warehouse floors take forklift traffic and racking loads, and a thin levelling compound is not a wearing surface for that. A unit there may need a higher strength screed or repair of the slab instead. We say so plainly when compound is the wrong answer, and price the right method for the floor.

How we price floor levelling in Sutton

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Sutton

Floor preparation with boards and screed hose before a pour
Floor preparation with boards and screed hose before a pour.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Sutton

As the crow flies, our yard in Slough is about 23.6 miles from Sutton, which lies to the east-south-east. Postcodes here include SM6, CR0, CR4 and SM2, and Ewell (3.6 miles), Croydon (3.7 miles), Merton (3.7 miles) and Epsom (4.7 miles) are close by.

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Sutton: your questions

What flatness does LVT need in a Sutton home?

LVT makers generally want SR1, which allows a 3mm gap at most under a 2m straightedge. Many older Sutton floors are closer to SR2 or SR3, and the dips show through a thin plank or tile. Priming the base and pouring a thin compound over it gets the floor within that limit. The flooring maker's instructions have the final say.

Can a warehouse floor on Beddington Lane be levelled with compound?

Only for light use, such as an office or showroom area within the unit. Floors that carry forklifts, pallet trucks or racking need a screed or slab built for that load, not a few millimetres of compound that can crack and debond. We look at the use of the floor before recommending levelling, repair or a new screed.

How long before flooring can go on levelling compound?

That comes down to which product is used and how thick it goes. A fast drying compound can often be walked on within hours and floored not long after, handy when a St Nicholas centre shop has an opening date to hit. Thicker applications and cooler rooms take longer. The product sheet sets the minimum, and we check the surface before the flooring fitter starts.