info@kandbscreeding.co.uk

Sand and Cement Screed · London

Sand and Cement Screeding in Sutton

In Sutton houses, our sand and cement screed is mixed at the door and tamped down by hand until it is dense and level. It suits the borough's period renovations: 13% of Sutton's homes were built before 1919. Two conservation areas, Landseer Road with its Edwardian villas and Sutton Garden Suburb with its Arts and Crafts houses, bring careful renovation screeds, where each room is mixed and laid to its own depth rather than filled by a pump.

Renovation screeds around Landseer Road and Sutton Garden Suburb

Period houses rarely have a floor that behaves the same from room to room. A hallway, a small back kitchen and a converted scullery may each need a different depth, and doorways, thresholds and old walls leave little room for a pump hose and a wide pour. Hand-laid screed is mixed to suit each area and compacted and finished by hand, which is why it fits renovation work in period houses like those around Landseer Road and in Sutton Garden Suburb. Each room can be finished and left to dry while the next is prepared.

A failed old solid floor comes out completely and is rebuilt in layers: membrane, insulation, then fresh screed. On insulation as a floating layer it should be 65mm thick for a home and 75mm for commercial premises. If the concrete below is still good, a bonded screed between 25 and 40mm can be put directly on it after preparation. Our screed thickness guide explains when each applies, and the insulation and membranes service covers what goes below.

Hand-laid screed is slow to dry next to liquid; every millimetre takes around a day until the 40mm mark, and the rate drops after that. In a renovation that is often no hardship, because joinery, plastering and decoration carry on while the floor dries. Plan the flooring for after a moisture test rather than a fixed date.

Garages, wet rooms and small floors in Sutton

A few rooms call for cement whether the house is Edwardian or brand new. Wet rooms and level-access showers need the screed graded down towards the drain, and calcium sulphate is off the table anywhere water will reach the floor. Sand and cement works there and takes tiles directly once dry.

Terraced houses make up 24% of Sutton's homes, and small jobs in them, such as a utility room, a downstairs toilet or a garage turned into a study, are exactly where hand-laid screed is cost effective. There is no pump to set up, so a floor of a few square metres is still sensible to screed. Our garage floor screed guide covers raising and insulating a garage floor to meet the house.

We can tweak the mix too. Adding fibres improves crack resistance at £1 to £3 extra per m², explained under fibre reinforced screeds. And if the floor has to carry weight early on, cement is the base to use. For similar work just over the border, see sand and cement screed in Croydon.

Sand and Cement Screed prices in Sutton

Sand and cement screed: £18 to £25 per m² supplied and laid (MyJobQuote, August 2026), so £450 to £630 for 25 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your sand and cement screed in Sutton

Finished floor screed in a bright domestic room
Finished floor screed in a bright domestic room.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Sand and Cement Screed from Slough to Sutton

As the crow flies, our yard in Slough is about 23.6 miles from Sutton, which lies to the east-south-east. Postcodes here include SM6, CR0, CR4 and SM2, and Ewell (3.6 miles), Croydon (3.7 miles), Merton (3.7 miles) and Epsom (4.7 miles) are close by.

More on sand & cement screed, part of our screeding services.

FAQs

Sand and Cement Screed in Sutton: your questions

How thick should a sand and cement screed be in a Sutton renovation?

Floating over insulation, the house figure is 65mm, and commercial floors go up to 75mm. Bonded onto good concrete, 25 to 40mm is enough. The right figure depends on what is under the floor, which is why we look at the base before pricing a renovation in a period Sutton house.

Can we stay living in the house while a floor is screeded?

Usually, yes. Hand-laid screed is done a room or area at a time, and once it has set enough to walk on, the rest of the house carries on around it. Keep the room closed and ventilated while it dries. We will explain which rooms are out of use and for how long before the work starts.

What does sand and cement screed cost per m²?

The 2026 published UK range is £18 to £25 a square metre, or £20 to £28 for fast drying mixes and £12 to £18 (trade2base, June 2026) for a bonded screed. A Sutton price also reflects area, depth, access and any dig-out. Send us the details and a fixed figure follows in writing inside a day.

Free, no-obligation quote

A fixed price for your Sutton floor