Latex Screed · Hertfordshire

Latex Screed Contractors in Hemel Hempstead

K & B lays latex screed in Hemel Hempstead: a two part levelling compound, a few millimetres thick, that gives sheet vinyl, LVT, lino and carpet a smooth base over awkward floors. Here that usually means a kitchen or bathroom refit in a house from the new town years, where the old floor might be overboarded timber upstairs, firmly stuck quarry tiles or a worn concrete slab. Terraced houses are 34% of the town's homes, and refits in them are where latex earns its place.

Awkward bases in Highfield and Grovehill refits

Latex screed is less a separate kind of screed than a trade name for a two part compound. A cement based powder is mixed with a latex liquid in place of water, which gives the cured layer a little flexibility and a firm grip on bases that ordinary compound dislikes. It goes down thin, typically a few millimetres, and its job is to smooth a floor that is already sound, never to rebuild one.

The planned neighbourhoods went up in phases, Highfield in the mid 1950s and Grovehill from 1967 among them, so their houses are now decades old. Lift an old vinyl floor in a house of that age and the base underneath is rarely tidy. Typical finds are quarry or ceramic tiles still bonded hard to the slab, patches of old adhesive, a concrete floor worn uneven by decades of feet, or timber boards on an upper floor.

Each of those can take latex, with conditions. Tiles are tapped to find any loose ones, then cleaned of grease and polish. Old adhesive has to be firmly stuck and suited to the primer. Timber boards are never latexed directly: they are first overboarded with flooring grade plywood, screwed down at close centres, and the latex goes over the plywood. A cement screed is primed to control suction, and a calcium sulphate screed must have its laitance removed and always be primed before latex goes near it.

The finish decides whether it is worth doing. Sheet vinyl, LVT, safety flooring, lino and rubber all show every ridge and grain line beneath them, so they need it most. Carpet is more forgiving, though a latex skim still stops old tile joints showing through over time.

When latex is the wrong fix in Hemel Hempstead

Latex copies the floor it sits on. If that floor moves, is damp or is badly out of level, the problem comes straight back through the new finish, so part of the job is saying no.

Springy floorboards are the first case. A bounce underfoot cracks a thin compound however carefully it is mixed, so loose boards and tired joists need fixing, and the plywood overboarding has to be rigid, before any latex is mixed.

Damp is the second. A ground floor slab with no working membrane pushes moisture into the latex and lifts the vinyl above it. We test before we pour, and where damp shows, a membrane or a new floor comes first.

The third is a floor with a large dip or slope. A few millimetres of latex cannot correct a fall of several centimetres across a room. A fall that size needs a new screed, often a dug out floor and a fresh sand and cement bed, while smaller hollows can take deeper levelling compound. Small cracks and hollow patches in an old screed are cut out and filled first; our page on screed repairs explains how that is done.

Latex in Hemel Hempstead's purpose-built flats

Flats are 27% of the town's homes, and nearly all of them are in purpose-built blocks. When a kitchen or bathroom in one of these flats is refitted, lifting the old vinyl can reveal a floor that has been patched, glued and covered more than once. A thin new finish laid over that patchwork shows every ridge, so a skim of latex is often the step between stripping out and fitting.

Latex suits flat work for a practical reason. It comes as bagged powder and a latex liquid, mixed in buckets at the door of the room, so there is no pump, hose or lorry and nothing to run up a stairwell.

The base still decides whether latex is right. Old adhesive is scraped back, and anything soft or powdery is ground off; a thin, hard film can sometimes stay under a suitable primer. Firmly bonded ceramic tiles can be primed and covered. Where a previous owner laid a floating floor or loose boards, those come up first, because latex needs a fixed, solid base beneath it.

The target is a floor flat enough for the finish going on it. Many thin sheet finishes ask for SR1, which allows no more than a 3mm gap under a 2m straightedge, and a latex skim is how a sound but patchy flat floor gets there.

How we price latex screed in Hemel Hempstead

A fixed written price within 24 hours, once we know the area and the base. See our floor levelling cost guide.

Who lays your latex screed in Hemel Hempstead

Finished floor screed across an open roof terrace
Finished floor screed across an open roof terrace.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Latex screed from Slough to Hemel Hempstead

Hemel Hempstead is about 17 miles north-north-east of our Slough base as the crow flies, with postcodes including HP1, HP2 and HP3. The nearest towns to it are Berkhamsted (4.5 miles), St Albans (5.7 miles), Harpenden (6.6 miles) and Chesham (6.9 miles).

More on latex screed, part of our screeding services. For every screed we lay locally, see floor screeding in Hemel Hempstead.

FAQs

Latex screed in Hemel Hempstead: your questions

Can latex screed go straight over floorboards in a Hemel Hempstead house?

Not over bare boards. Timber moves with the seasons and under foot traffic, and a thin cement based layer cannot follow that movement, so it cracks. The boards are first fixed down firmly and overboarded with flooring grade plywood, screwed at close centres. Latex then goes over the plywood and gives sheet vinyl or LVT a smooth face.

How thick is a latex screed?

Typically a few millimetres. It is mixed to smooth out tile joints, old trowel marks and small hollows rather than to raise a floor. Where a Hemel Hempstead kitchen floor needs more than that to come flat, a deeper levelling compound or a new screed is the better choice, and we say which one when we price the job.

Will latex stick to old quarry tiles in a Hemel Hempstead kitchen?

It will if the tiles are firmly bonded. Each tile is tapped to find any that ring hollow, loose ones are lifted and the gaps filled, and the surface is degreased and primed with a product made for tile. The latex then fills the joints and leaves a flat face. We offer the same work as latex screed in Berkhamsted.

Will latex screed raise the floor at the front door of a Hemel Hempstead flat?

Only slightly. Latex goes down typically a few millimetres thick, so the change in height at the front door and at each threshold is roughly the latex plus the new finish. If the old floor needs much more than that to come flat, a deeper compound or a new screed is needed, and that raises the floor further, so door clearances are worth checking before work starts.

Free, no-obligation quote

A fixed price for your Hemel Hempstead floor