info@kandbscreeding.co.uk

Floor Levelling · Kent

Floor Levelling and Self Levelling Screed in Herne Bay

In Herne Bay we level uneven floors with a poured compound that settles flat, ready for LVT, vinyl, big tiles or engineered wood boards. House ages here are spread widely: 23% of homes were built between 1945 and 1972 and 16% between 1973 and 1999, on top of the older stock. Floors from each era arrive with their own dips, humps, patches and old adhesive, and levelling is how they become a sound base for a new finish.

Flattening older floors near the Herne Bay seafront

The older houses near the seafront often have floors that need levelling before new finishes, and sometimes replacing altogether. Telling the two apart is the first job.

First we lay a 2m straightedge across the floor and compare the gaps with the BS 8204 flatness classes, which are 3mm for SR1, 5mm for SR2 and 10mm for SR3. SR1 is the class many thin sheet finishes such as vinyl demand, and an old floor rarely meets it on its own.

Uneven but solid? Compound will deal with that. Most of it is laid somewhere from about 2mm to 10mm thick, a few products deeper, and it spreads into a smooth, flat face that is quick to dry. The base is primed first with the right primer for what is there: concrete, screed, calcium sulphate or an existing floor.

Extensions built onto older Herne Bay houses often leave an awkward line where the floors meet. Old and new are seldom at quite the same level or equally flat, and compound feathered over that line lets the flooring carry straight through with no ridge.

A floor that is cracked, sounds hollow or sits well out of level needs more than compound. Poured thick to rescue it, compound tends to crack and come away from the base. We will tell you straight and quote for a replacement sand and cement screed, plus whatever preparation of the slab it calls for.

Shop and unit refits around Eddington Business Park

Commercial floors in Herne Bay change with every new tenant. Eddington Business Park, on the western edge of Eddington, has a range of units, and the industrial estates on the outskirts house firms making kitchen furniture and factory machinery. When a unit is refitted as an office, a showroom or a shop, the old floor usually has to be brought flat before carpet tiles, vinyl or LVT go down.

That work is mostly about keeping the programme moving. Fast drying compounds let flooring follow within a short time, so a refit is not held up waiting for a screed to dry. Old adhesive and loose coatings are taken off first, cracks and holes are repaired, and the right primer goes on before the compound.

The commercial and community buildings planned at Strode Farm will raise the same question later: whether a new floor is flat enough for its finish. If a unit floor is damaged beyond a skim, our screed repair service deals with broken and hollow areas before levelling. Where a refit floor is bare concrete that needs opening up first, our concrete floor grinding comes before the compound.

How we price floor levelling in Herne Bay

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Herne Bay

Room prepared with blue edge strip and membrane ready for screed
Room prepared with blue edge strip and membrane ready for screed.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Herne Bay

As the crow flies, our yard in Slough is about 77.3 miles from Herne Bay, which lies to the east. Postcodes here include CT6, and Whitstable (4.5 miles), Canterbury (6.7 miles), Faversham (10.9 miles) and Sittingbourne (17 miles) are close by.

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Herne Bay: your questions

How flat does a floor need to be for LVT?

SR1 is the flatness many LVT and vinyl brands specify, with no gap over 3mm showing under a 2m straightedge. Older Herne Bay floors rarely meet that without work. A thin coat of levelling compound, laid after the right primer, usually brings a sound floor up to the standard the flooring needs.

When does a Herne Bay floor need a new screed instead of levelling?

When the problem is more than surface unevenness. A cracked, hollow or crumbling floor, or one that needs more than about 10mm to bring it flat, is better replaced. Thick compound on a base that is breaking up may crack and lose its bond. We say which applies after seeing the floor or photos.

Can levelling compound go over an old quarry tile floor?

In many cases yes, provided the old tiles are stuck fast and the floor beneath is solid. They are cleaned, any loose tiles are fixed, and a primer suited to the surface goes on before the compound. If the tiles are loose or the floor below is failing, lifting them and relaying is the safer route.

Free, no-obligation quote

A fixed price for your Herne Bay floor