info@kandbscreeding.co.uk

Liquid Screed · Kent

Liquid Screed in Herne Bay

We pump and finish liquid screed across Herne Bay for extensions, open-plan kitchens, new homes and flats. The council's adopted plan includes about 1,300 homes at Hillborough and around 670 on the former Herne Bay Golf Course, so there is a lot of building still to come. Floors like those, laid room after room over heating pipes, are where a pumped, self-levelling screed earns its place, because a whole ground floor can be covered in a single day.

Where pumped screed makes sense in Herne Bay

With liquid screed, a hose carries the mix from the mixer into the room, where it finds its own level. On a large or open floor that is far quicker than barrowing and hand-compacting a semi-dry mix, and it leaves a dense surface with fewer joints and low shrinkage.

New construction is the obvious fit. The estates at Strode Farm, Greenhill, Hillborough and the old golf course will put heating pipes into plot after plot, and a flowing screed wraps round every pipe without leaving air pockets. Apartment blocks and retirement schemes want the same flat, quick drying base so the fit-out can follow on.

Existing houses suit it too. A rear extension opened into the kitchen, or three small rooms knocked into one, produces a wide floor that the pump covers in a morning. On a domestic floating floor over insulation, depth usually starts from about 35mm, and surface regularity to SR1 or SR2 is readily achievable, which helps if the finish is large-format tile or LVT.

There are calcium sulphate liquid screeds and cement based ones. The calcium sulphate kind has its own sanding and moisture rules, set out on our calcium sulphate screed page for Herne Bay. Where the room is small, broken up by doorways or needs falls to a drain, a traditional sand and cement floor is usually the better tool.

Pump, hose and drying on Herne Bay jobs

Our mixer and pump sit outside the house, and only the hose comes in, by a door or a window. What we need from you is a place to park close to the property and a clear route for the hose, which can run along a hallway or up a stairwell.

Flats take more planning. Herne Bay has both purpose-built blocks and converted houses, and an upper-floor pour means running the hose up the stairs or in through a window. Tell us the floor level, whether there is a communal hallway to protect, and any rules the managing agent sets on working hours. On a new build plot, the site manager normally agrees a standing area for the pump in advance, and on a street of older houses it helps to know about permits or narrow access.

You can normally stand on the new floor a day or two after the pour, 24 to 48 hours being typical. Getting it dry enough for flooring is a longer wait, at about one day for each mm up to 40mm, then a slower rate beyond. Our article on how long screed takes to dry shows how depth, airflow and heating change it. The pump and crew come as part of our price; for comparison, published figures put pump hire alone at £300 to £600 per day.

Liquid Screed prices in Herne Bay

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Herne Bay

Smooth self levelled liquid screed across an open plan room
Smooth self levelled liquid screed across an open plan room.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Herne Bay

As the crow flies, our yard in Slough is about 77.3 miles from Herne Bay, which lies to the east. Postcodes here include CT6, and Whitstable (4.5 miles), Canterbury (6.7 miles), Faversham (10.9 miles) and Sittingbourne (17 miles) are close by.

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Herne Bay: your questions

How thick should liquid screed be in a Herne Bay extension?

In a house, liquid screed floated over insulation is normally laid from about 35mm thick. Where heating pipes run underneath, there must be 25mm or more of screed over them, so the full depth usually comes to 45 to 50mm. The exact figure depends on the insulation, the pipe size and the finished floor height you need to meet in the existing house.

When can I walk on liquid screed?

Usually within 24 to 48 hours of the pour, which lets light trades carry on in a Herne Bay extension. Being able to stand on it does not mean it is ready for flooring, though. Tiles, LVT and wood need the screed to be dry, and that takes much longer, so keep heavy loads and floor coverings off until it has been tested.

Can liquid screed be pumped into an upper-floor flat in Herne Bay?

Yes, as long as the hose has a route. It can run up a communal stair or in through a window, and the pump stays on the street or in a car park. We need to know the floor level, the access and any building rules before pricing, so the pour can be done in one visit without surprises.

Free, no-obligation quote

A fixed price for your Herne Bay floor