Underfloor Heating Screed · Kent

Underfloor Heating Screed in Herne Bay

We lay the screed over wet underfloor heating in Herne Bay homes, choosing liquid or sand and cement to suit the pipes, the floor height and the programme. The pipes go in with your heating engineer, and our job is the screed over them. Detached houses make up 40% of Herne Bay's homes, and they often have space for the larger heated extensions and garden rooms where the screed has to be right first time.

Getting pipe cover right in Herne Bay extensions

How well a heated floor performs depends a great deal on the screed wrapped round its pipes. The screed has to surround every pipe without voids, carry enough depth above them to spread heat and resist cracking, and sit on insulation with an edge strip so it can move.

With a flowing screed, the pipes need at least 25mm of cover, which puts the total at about 45 to 50mm. Sand and cement needs roughly 45mm over the pipes, making the whole build-up thicker. That difference matters when a heated extension has to meet the floor of the existing house without a step. On a large open room, liquid screed pumped over the pipes usually wins, because it fills round them completely and is flat enough for tiles, LVT and engineered wood.

Adding heating to an existing older house is trickier. In a pre-1919 house near the seafront, the floor height is fixed by doors, skirtings and the rooms next door, so every millimetre of insulation and screed has to be planned. Sometimes the only way to fit heating in is to dig out the old solid floor and rebuild it from below. Minimum depths for every screed type are listed in our guide to screed thickness.

On the day, we confirm the edge strip, membrane and insulation are down and that the pipework has passed its pressure test before any screed goes in. Any of those layers not yet in place, we can provide and lay ourselves.

Switching the heating on in new Herne Bay homes

The first warm-up is where heated screeds most often go wrong. Heat the floor too soon, or crank it up too quickly, and cracking or curling can follow.

With calcium sulphate, the heating can normally come on from about day 7. Sand and cement must sit for 21 days at the very least. Whichever you have, warm the system gradually, stage by stage; we hand over a clear heat-up schedule so you and your heating engineer are working from the same plan.

The newest homes in town already rely on this. Only 5% of Herne Bay's homes were built from 2015 onwards, but the estates planned at Hillborough, Strode Farm, Greenhill and the old golf course will add many more heated ground floors. Garden rooms and home offices built at the bottom of gardens raise the same questions on a smaller scale.

For liquid screed laid over heating pipes, published rates run from £20 to £35 per m². Where a heated floor also needs work to the slab first, our floor preparation service is priced in the same quote.

Underfloor Heating Screed prices in Herne Bay

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our floor screeding cost guide or screed calculator.

Who lays your underfloor heating screed in Herne Bay

Underfloor heating loops marked out in red before floor screeding
Underfloor heating loops marked out in red before floor screeding.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor Heating Screed from Slough to Herne Bay

As the crow flies, our yard in Slough is about 77.3 miles from Herne Bay, which lies to the east. Postcodes here include CT6, and Whitstable (4.5 miles), Canterbury (6.7 miles), Faversham (10.9 miles) and Sittingbourne (17 miles) are close by.

More on underfloor heating screed, part of our screeding services.

FAQs

Underfloor Heating Screed in Herne Bay: your questions

Can screed go straight over underfloor heating pipes?

Yes. Screeding over the pipes is the standard way a wet system goes together. The pipes are clipped to insulation, an edge strip goes round the room, and the screed is poured or laid over the top with the right cover. In a Herne Bay extension we check those layers first, because a missing edge strip or untested pipe is hard to fix later.

When can I turn the underfloor heating on after screeding?

Calcium sulphate can take heat from roughly day 7; with sand and cement, hold off for 21 days or more. Either way, bring the temperature up slowly in stages rather than switching straight to full heat. We leave written guidance with the job so the first heat-up is done properly.

Do you fit the underfloor heating pipes as well?

No. Fitting the pipework is not something K & B does. That falls to your heating engineer, who also pressure tests the circuit, and we follow on with the screed. We can supply the insulation, membrane and edge strip, and we will talk to your engineer about pipe cover and floor height so the two jobs fit together.

Free, no-obligation quote

A fixed price for your Herne Bay floor