info@kandbscreeding.co.uk

Latex Screed · Buckinghamshire

Latex Screed in Newport Pagnell

In Newport Pagnell we lay latex screed, a compound mixed from two parts and spread only a few millimetres thick, to give sheet vinyl, LVT, lino, rubber or carpet a smooth base over awkward floors. Semis make up 38% of homes in the town, many of them from the 1970s to 1990s, so kitchen and bathroom refits are the usual setting: old tiles left in place, plywood over boards, or concrete worn uneven where a kitchen run once stood.

Awkward bases in Newport Pagnell kitchens and bathrooms

Strip out a kitchen in a Newport Pagnell semi and the floor rarely matches from wall to wall. There may be quarry tiles under the old units, a strip of bare concrete where a wall was knocked through, and thin vinyl glued down by a previous owner. Laying a new floor straight over that mix gives bumps and edges that show through a thin finish within weeks.

Latex screed is made for mixed bases like these. The powder is cement based, but it is mixed with a liquid latex rather than plain water. That gives a compound with a little flexibility and a strong grip, which flows out into a smooth, thin coat over a sound floor.

Each base needs its own preparation. Old tiles must be stuck firmly: any that rattle or sound hollow are lifted and the gaps filled before priming. Sound old adhesive can sometimes stay if it is thin, hard and well bonded, while soft or flaking residue comes off. Worn concrete is cleaned and primed to stop it drawing water out of the mix. Where an extension floor is calcium sulphate, its laitance is sanded off and the surface primed without exception.

Upstairs bathrooms sit on timber. Latex is never poured directly onto floorboards, because they move. The boards are fixed down, flooring grade plywood goes over them, and the latex is laid on the ply. The work that comes before any thin coat is covered on our floor preparation page.

Damp floors near Newport Pagnell High Street

Some of the older houses near the High Street have solid floors that sit directly on earth with nothing beneath to stop moisture. A thin coat of latex over a floor like that will not last. Latex does not hold back moisture: damp rising through the slab works against the compound and the adhesive above it, and new vinyl or LVT can blister or lift. Before any compound goes down in an older house, the floor is checked for damp. If it fails, the lasting answer is to dig out and relay with a membrane and insulation, as our page on relaying an old solid floor explains.

Two other faults rule latex out. A floor that springs underfoot will crack a thin coat, so loose boards and weak joists are dealt with first. A floor that is badly out of level, falling away across a room, needs more depth than a few millimetres can give: either a deeper compound, which our Newport Pagnell floor levelling page describes, or a new screed.

When the base is sound, dry and close to flat, latex is a quick way to a surface ready for a thin finish. Drying times follow the product's data sheet, and we pass them on to your fitter.

Safety flooring in Tongwell and Interchange Park units

The units at Interchange Park and on the Tongwell employment area have the same kinds of rooms that every working building has: staff kitchens, toilets, welfare rooms and office space. Rooms like these are often finished in safety flooring or sheet vinyl, and both need a smooth base, because every lump, trowel mark or old joint below them shows and wears through. A thin latex screed is often the way to get there.

The floor that comes up in a refit is rarely clean. Lift old vinyl or carpet tiles in a unit and you may find patches of adhesive, filled holes where fixings came out, and joints or ridges in the concrete. Soft or flaking adhesive is removed, and high spots or ridges are ground down, before any compound goes on. Sound concrete is then cleaned and primed with a product suited to it.

Latex then goes down a few millimetres thick over that prepared base. Because it adds almost no height, door thresholds and the edges of existing floors in the rest of the unit stay where they are.

Two checks matter in a unit. The first is damp: a slab without a working membrane needs dealing with first, because latex does not stop moisture. The second is the finish: safety flooring makers set their own requirements for the base, and their data sheet is followed for primer, compound and drying.

How we price latex screed in Newport Pagnell

A fixed written price within 24 hours, once we know the area and the base. See our floor levelling cost guide.

Who lays your latex screed in Newport Pagnell

Wide view of a finished screed in a glazed extension
Wide view of a finished screed in a glazed extension.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Latex screed from Slough to Newport Pagnell

Newport Pagnell is about 38.5 miles north of our Slough base as the crow flies, with postcodes including MK16 and MK14. The nearest towns to it are Milton Keynes (3.3 miles), Bletchley (6.5 miles), Kempston (9.6 miles) and Flitwick (11.3 miles).

More on latex screed, part of our screeding services. For every screed we lay locally, see floor screeding in Newport Pagnell.

FAQs

Latex screed in Newport Pagnell: your questions

What is latex screed made of?

Two parts mixed on site: a cement based powder and a liquid latex used in place of water. The latex makes the cured compound slightly flexible and helps it bond to tiles, plywood and older concrete. It is laid only a few millimetres thick, so in a Newport Pagnell home it smooths a sound floor rather than building it up.

Can latex screed go over old quarry tiles?

Yes, if every tile is firmly bonded. We tap across the floor, lift any loose or hollow tiles and fill the holes, then clean off grease and prime with a product made for non porous surfaces. In an older kitchen near the High Street we check for damp at the same time, since some floors there sit straight on earth.

How soon can vinyl go down on latex screed?

The product and its depth set the figure, and the data sheet gives it. A coat of a few millimetres is a far shorter wait than a full depth screed, which is why latex suits a kitchen or bathroom refit on a tight timescale. Over a new extension screed, the screed itself must be dry first. For a job across the M1, see latex screed in Milton Keynes.

Can latex screed be laid in a first floor office at Interchange Park in Newport Pagnell?

Yes. Latex is mixed in buckets near the room, so it can be carried up to a two storey office without a pump or hose, and at a few millimetres thick it adds very little weight. The base still has to be sound. A concrete or screed floor is cleaned and primed, while a timber deck needs flooring grade plywood fixed over it before any latex goes on.

Free, no-obligation quote

A fixed price for your Newport Pagnell floor