info@kandbscreeding.co.uk

Floor Levelling · Rutland

Floor Levelling and Self Levelling Screed in Oakham

Uneven Oakham floors are brought flat with self levelling compound so that engineered wood, LVT, vinyl or big tiles go down on a true base. The work ranges from joins between an older house and its extension to office and shop refits, such as units in the serviced King Centre at Barleythorpe. Compound normally sits anywhere from about 2mm to about 10mm deep. Where a floor is further out than that, we tell you and quote for a new screed.

Levelling Oakham floors before new flooring

Any hollow under a thin covering will show through it. Sheet vinyl and LVT in particular need a flat, smooth base, and SR1 is the class many thin sheet finishes demand, meaning no more than 3mm deviation under a 2m straightedge. The looser classes are SR2 at 5mm and SR3 at 10mm.

Homes from the years 1945 to 1972 account for 25% of Oakham's stock. Floors of that age have often been patched, had walls removed or pipes run through them, and the surface can be uneven even though the slab underneath is sound. A self levelling compound flows across the room and gives a smooth base in a single day.

Trouble often shows at the step between the original house and its extension. The two floors are rarely exactly the same height, and a feathered compound across the join, with the right primer on each side, gives one continuous level surface.

Preparation decides the result. Old adhesive, paint and loose screed have to be removed first, sometimes by grinding. That stripping work is part of our floor preparation. A primer suited to the base goes on next, whether that base is concrete, calcium sulphate or sand and cement, and only then the compound.

Sanding timber floorboards is not something we offer. Levelling here means compound over solid bases, and on some boarded floors where the product allows it.

Shop and office refits at The King Centre

Commercial refits run to tight dates. When a tenant moves out of an office or shop, the new occupier wants carpet tiles or vinyl down quickly, and fast drying products keep the programme moving, with timings set by each product's data sheet.

The King Centre in Barleythorpe, opened in 2017 in a former EEF training building, holds around 30 small firms. A change of tenant in a unit like these can reveal a floor with old adhesive, uneven joins or damaged patches. The parish also has shops, including an Aldi supermarket, and small workshop units, which need level floors ready for their finish without long delays.

Compound has limits. Thick compound laid where a new screed was really needed can crack and come away. If a floor dips by much more than around 10mm, or the screed underneath is loose or hollow, screed repairs or a new screed are the honest answer.

Before pricing, we check the base for hollow spots and loose patches, because compound only performs on a sound, primed surface.

How we price floor levelling in Oakham

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Oakham

Floor preparation with boards and screed hose before a pour
Floor preparation with boards and screed hose before a pour.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Oakham

As the crow flies, our yard in Slough is about 78.7 miles from Oakham, which lies to the north. Postcodes here include LE15, and Stamford (10.5 miles), Corby (12.6 miles), Market Harborough (15.5 miles) and Desborough (16.2 miles) are close by.

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Oakham: your questions

How thick can self levelling compound be laid?

Most products are designed for roughly 2mm to 10mm, though a few can be laid thicker. Beyond that, using compound in place of a proper screed risks cracking and debonding. Where an Oakham floor dips more than the product allows, we recommend a new screed or a repair before levelling.

Do I need to level my floor before fitting LVT?

Usually, yes. LVT and sheet vinyl are thin and flexible, so any dip, ridge or crack in the base shows through and can wear the covering. Lots of manufacturers want SR1, so no point more than 3mm below a 2m straightedge. A thin layer of compound normally gets it there.

Can uneven floors in an older Oakham house be levelled without digging up?

Provided the base is dry and sound, the right primer and a levelling compound can flatten it with no digging. If the old floor is damp, loose or cracked through, compound will not fix it, and a rebuilt floor using liquid screed or sand and cement is the better route.

Nearby

Floor Levelling near Oakham

Free, no-obligation quote

A fixed price for your Oakham floor