info@kandbscreeding.co.uk

Floor Levelling · Oxfordshire

Self Levelling Screed and Floor Levelling in Banbury

Across Banbury we pour self levelling compound over uneven screeds and slabs, so LVT, vinyl, large format tiles or engineered boards have a smooth, flat surface to go onto. Housing age shapes the job in Banbury: 32% of homes were built between 1973 and 1999, and floors that old have usually seen several coverings come and go, leaving dips, adhesive and patches behind.

Levelling knock throughs and extensions in Banbury homes

Knock throughs are a staple of the town's post-war and mid-century housing, and they leave a telltale problem. Where a wall comes out, the two rooms either side rarely finish at exactly the same level, and there is often a strip of rough floor where the wall stood. A rigid floor laid over that will rock or crack.

A poured compound takes that ridge and the step out. We normally lay it between about 2mm and around 10mm (a few products go deeper), and it runs out smooth on its own. Flatness is judged with a 2m straightedge: SR1 means a gap of 3mm at most, SR2 means 5mm, and thin sheet floors often ask for SR1.

The same approach joins a new extension to the old house. Once the extension screed is dry, compound can be feathered across the join so one floor runs through.

Before any compound goes down, the floor is primed. Bare concrete, an old cement screed and an anhydrite floor each need their own primer.

Compound is not always the answer. A floor that dips well beyond 10mm, or a screed that is crumbling, will tend to crack and debond under a deep pour. Then a new screed is the right fix, such as hand-laid sand and cement in Banbury, or a thin latex screed where only a few millimetres are needed.

Banbury shop and unit refits, Castle Quay to Thorpe Way

Commercial refits need flat floors on short programmes. In the centre, the Castle Quay Shopping Centre sits beside the Oxford Canal, and when a shop there is refitted, its floor has to be ready for new vinyl, LVT or tiles. Out of the centre, when a unit on the Wildmere or Thorpe Way industrial estates is refitted as an office or showroom, its floor needs the same preparation.

A typical refit starts with lifting old carpet tiles or vinyl and removing adhesive. High spots and contamination come off next, with concrete floor grinding where needed. The floor is primed for its base, then a fast drying compound is poured to SR1 or SR2 so the new finish can follow quickly.

Work can be phased so part of a unit is handed back while the next area is prepared. Tell us the finish, the opening date and any hours we must work around.

Factory floors on those estates are a different job. Where a floor carries forklifts, racking or production equipment, damaged areas need repairing and a heavy duty screed may be needed before any finish. Resin and polished concrete are outside what we do.

How we price floor levelling in Banbury

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Banbury

Large finished ground floor screed with garden doors
Large finished ground floor screed with garden doors.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Banbury

On the map, Banbury sits north-west of Slough, about 47 miles from our base in a straight line (postcodes including OX16), next to Brackley (8.3 miles), Bicester (13.8 miles), Buckingham (15.4 miles) and Daventry (15.4 miles).

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Banbury: your questions

Do I need floor levelling before laying LVT in a Banbury house?

Usually, if the floor has dips, ridges or old adhesive. LVT and click flooring show every hollow, and most makers ask for SR1 or SR2 under a 2m straightedge. A primed base and a thin compound get the floor there without raising it much.

When does a floor need a new screed instead of levelling compound?

Once the dips run well past about 10mm, or the screed underneath is cracked, loose or sounds hollow. Pour a thick layer of compound over a base like that and it can crack and part company with it. We look at the floor first and give you a straight answer on which fix it needs.

Can a shop floor be levelled overnight so trading is not disrupted?

Often, with a fast drying compound and a phased plan. Each product has its own drying time on its data sheet, so we choose one to match your hours and the finish going down. Tell us the opening times and the floor area when you ask for a price.

Free, no-obligation quote

A fixed price for your Banbury floor