info@kandbscreeding.co.uk

Liquid Screed · Oxfordshire

Liquid Screed Contractors in Banbury

One visit with the pump is enough to take a Banbury extension or ground floor flat, and you can walk across it after 24 to 48 hours. Much of the town is very recent, with 15% of homes built in 2015 or later, and houses of that age are often drawn with a flowing screed over their insulation. It also suits the knock throughs common in the town's post-war housing.

Knock throughs and new builds: liquid screed in Banbury

Length and openness are what make the pump worthwhile. Knock a kitchen and dining room into one in a Ruscote house, or add a full-width extension, and the new floor may run from the front wall to the garden. Liquid screed flows out across that whole area in one visit and settles to SR1 or SR2 flatness, meaning no more than 3mm or 5mm under a 2m straightedge.

As it dries it hardly shrinks at all. That means far fewer joints than a hand-laid floor, which matters under tiles and rigid LVT.

On newer plots, the insulated ground floor is usually designed for a flowing screed from the outset, often with heating pipes already in place. Where pipes are present it must sit 25mm or more above them, so 45 to 50mm is normal overall. With no heating, a floating pour in a house can be about 35mm, roughly half what a hand-laid cement floor needs, and that saving helps when a Ruscote extension has to meet the floor of the original house.

Hillside homes add a twist. On stepped floors in Hardwick and Bretch Hill, a self-levelling screed will find its own level, so each step is poured as a separate bay with a stop end at the change in height.

The pump treats the calcium sulphate and cement versions alike. For the calcium sulphate material and its grades, see anhydrite screed in Banbury, and compare methods in liquid screed vs sand and cement.

Reaching Banbury flats and sloping plots with the pump

Flats are 20% of Banbury's homes, and they are where a pump makes the biggest difference. Sand and cement for an upper floor has to be carried up in bags; a hose simply runs up the stairwell to the room. Blocks usually need the managing agent told in advance and the shared stairs protected.

Houses on slopes need the lorry placed with care. A steep drive, front steps or a long path round to the back all add length to the hose run. Tell us about the approach when you ask for a price, and mention parking restrictions or narrow streets. The kit and its reach are described on our screed pumping page.

The room must be prepared before the pump starts. Fix edge strip around every wall, lay a membrane over the insulation with all joints taped, and dam each doorway. Our team goes over each item on pour day, and if you need the layers supplied, we can bring them.

For the first day or two after the pour, keep windows and doors shut so the surface does not dry too fast, then open up to ventilate. Walkable is not dry. Flooring waits until the screed passes a moisture test, which on a typical floor takes weeks rather than days, as the screed drying guide explains.

Liquid Screed prices in Banbury

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Banbury

Finished screed floor in a new build room
Finished screed floor in a new build room.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Banbury

On the map, Banbury sits north-west of Slough, about 47 miles from our base in a straight line (postcodes including OX16), next to Brackley (8.3 miles), Bicester (13.8 miles), Buckingham (15.4 miles) and Daventry (15.4 miles).

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Banbury: your questions

How thick does liquid screed need to be in a Banbury house?

Floating on insulation in a house, about 35mm is the minimum. Put it over heating pipes and they need 25mm or more on top, which tends to give 45 to 50mm in all, while commercial floors begin at about 40mm. On a sloping Banbury plot, the final depth is fixed after we have measured the finished level each room has to meet.

Will liquid screed leak through to the floor below?

Not if the build-up is sealed. The membrane over the insulation has its joints taped and is turned up at the walls behind the edge strip, and doorways are dammed. In a flat, gaps around pipes passing through the floor are sealed before the pour. We check all of this on the day before pumping starts.

Is liquid screed better than sand and cement for a kitchen knock through?

For a large open room it usually is: it is thinner, flatter, needs fewer joints and goes down in a day. Sand and cement costs less per m² and suits small rooms, wet areas and floors that need early load. The choice depends on the room size, heating and your programme.

Free, no-obligation quote

A fixed price for your Banbury floor