info@kandbscreeding.co.uk

Liquid Screed · London

Liquid Screed in Lewisham

Liquid screed reaches a Lewisham house by hose from a mixer outside, which means an entire ground floor or an open-plan kitchen extension goes down in one day and normally takes foot traffic 24 to 48 hours later. What counts most locally is new building: at Lewisham Gateway, Convoys Wharf and Catford, the latest flats and townhouses are designed with flowing screed over underfloor heating.

Why Catford and Convoys Wharf homes take pumped screed

Pumped screed earns its keep on big, open floors that can be filled in a single pour. That describes the new homes going up in Lewisham. Around Catford, Lewisham Gateway and Convoys Wharf in Deptford, new flats and townhouses are being built with underfloor heating and acoustic insulation between units, and a pumped screed suits that build-up well.

The share of new stock is not small: 18% of the borough's homes date from 2000 or later. Buildings of that age are generally designed with enough depth for insulation and a flowing screed, and the screed fills every gap around the heating pipes without leaving voids.

Thinner sections are part of the appeal. Floating over insulation in a home, a flowing screed can go down at about 35mm, where sand and cement would want around 65mm. Getting to SR1 or SR2 is straightforward with a flowing mix, and because it barely shrinks, the floor needs far fewer joints, leaving a sound base for tiles, LVT or engineered boards.

Older homes can benefit too. A rear extension on a Victorian terrace often ends in one wide kitchen and living space, and a pumped floor covers it quickly. You can have a liquid screed with either a calcium sulphate or a cement binder. For the first, anhydrite grades and testing has the detail, and if you are still deciding on a method, read which suits you, liquid or traditional.

Pump access from Lewisham terraces to upper flats

The pump and mixer never come indoors; screed travels to the room through a hose, along the hallway or up through the building. On a townhouse plot with a driveway that is simple. Between Brockley and Hither Green, where Victorian terraces line the streets, the mixer may have to sit in the road, so mention parking restrictions, bus routes or tight access when you ask us to price it.

Flats are a good match for a hose. With 56% of Lewisham's homes being flats, many floors sit well above the street, and carrying sand and cement up the stairs would be slow and heavy work. A hose climbs a stairwell with far less disruption, provided the route is agreed with the building manager and protected.

Inside, check the preparation before the day. Edge strip must run round every wall, the membrane over the insulation must be taped at the joins, and doorways need damming. Keep windows closed and the room draught free for the first two days. You can walk on it after 24 to 48 hours. Flooring is a different matter: it waits until the screed is dry, and you should budget roughly one day per millimetre of depth up to 40mm.

For the pump itself, see our screed pumping service, or compare liquid screed in Greenwich nearby.

Liquid Screed prices in Lewisham

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Lewisham

Long finished floor screed ready for floor coverings
Long finished floor screed ready for floor coverings.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Lewisham

As the crow flies, our yard in Slough is about 27.5 miles from Lewisham, which lies to the east. Postcodes here include SE26, SE6, SE3 and SE4, and Southwark (3.2 miles), Lambeth (4.2 miles), Greenwich (4.3 miles) and Tower Hamlets (4.9 miles) are close by.

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Lewisham: your questions

How thick is liquid screed in a new Lewisham townhouse?

Over plain insulation with no heating, about 35mm is the least that goes into a house. Add heating pipes and they want 25mm of screed on top as a minimum, so a townhouse floor of that kind usually totals about 45 to 50mm. The drawings for a new townhouse normally state the depth, and we pour to that.

Can I walk on liquid screed the next day?

Normally yes for light walking, once 24 to 48 hours have passed. Keep heavy loads, stacked materials and wheeled barrows off it for longer. A floor you can stand on is not yet a dry floor, though, and coverings stay off until a moisture reading says the screed is ready.

Is liquid screed worth it for a small room in a Lewisham flat?

For a single small room it can be, if the flat is high up and access is hard, because the hose saves carrying materials. For a small ground floor room with easy access, sand and cement is often more economical. We compare both when we price the job.

Free, no-obligation quote

A fixed price for your Lewisham floor