Latex screed for kitchen and bathroom refits in Wokingham
Latex screed is a two part levelling compound. The powder is cement based, and instead of water it is mixed with a latex liquid, which makes the cured coat slightly flexible and gives it a firmer grip on smooth or awkward surfaces. It goes on thin, usually a few millimetres, and its job is to give a new floor covering something smooth and even to sit on.
A refit in a house from the 1960s, 1970s or early 1990s tends to uncover one of three bases. The first is ceramic or quarry tiles from an earlier makeover. If they are still firmly bonded, they can be degreased, primed and covered with latex, rather than broken out with all the dust, noise and height problems that brings. Loose or hollow tiles are lifted and the gaps filled first.
The second is timber. Upstairs bathrooms in two-storey houses usually sit on boarded floors. Latex is never laid straight on floorboards; they are overboarded with flooring grade plywood, fixed down firmly, and the ply is primed before any latex is mixed.
The third is a concrete or screed floor that has been patched, chased for pipes or left rough. Small hollows, ridges and old adhesive marks that would show through new sheet vinyl or LVT can be smoothed in one thin pass.
Homes from between the wars are only 4% of Wokingham's housing, so in this town the awkward base is more likely to be a later tiled or boarded floor than an original period one.
Safety flooring, lino and LVT in Wokingham buildings
The finishes that most need latex are the thin, flexible ones. Sheet vinyl, LVT, lino, rubber and safety flooring are all stuck down with adhesive and follow every pit and ridge beneath them. Flats make up 16% of Wokingham's homes, and their kitchens and bathrooms commonly take sheet vinyl or LVT over a base that has to be smooth.
Before laying anything, we check three things. Is the base sound and firmly fixed, with no springy boards or loose tiles? Is it dry? Latex will not stop damp coming up through an old floor, so a damp reading means a membrane or a new screed rather than a thin coat. And is it close to level? Latex smooths a floor that is rough over short distances; a floor that falls badly across the room needs a repair or new screed laid by hand first.
Priming depends on the base. Plywood, tiles, concrete and cement screed each take a suitable primer, and a calcium sulphate screed must have its laitance sanded off before it is primed. Our page on anhydrite flow screed in Wokingham explains that material, and if you are weighing latex against general self levelling compound, the Wokingham floor levelling page sets out the flatness classes. For homes about 4.4 miles away, see latex screed in Woodley.
Carpet to LVT in Montague Park and South Wokingham homes
The volume of new building at Montague Park, part of the South Wokingham development, means a lot of fairly young floors in the town, and a few years on, owners start changing their floor finishes. One change that needs care is carpet out and LVT or sheet vinyl in. The screed underneath is usually sound, but it may not have been finished with a thin glued covering in mind.
Lifting carpet leaves its own marks. Gripper rods are nailed or glued round the edges, and taking them out leaves holes and chipped patches along the walls. The floor may also have trowel marks, small ridges at bay joints or splashes of plaster from the build. LVT is thin and sits directly on whatever is below, so each of those shows once the light falls across the room. A latex skim a few millimetres thick fills the holes, covers the marks and leaves one smooth surface.
If the base is a calcium sulphate flowing screed, the priming rules above apply to it in full, even though it has sat under carpet for years. Where the floor is heated, the heating is turned down while the latex cures and brought back up gradually.
The skim adds only a few millimetres, but LVT can still meet a carpeted room or a door threshold at a different height, so the joins with the next room are checked before the latex goes down.
How we price latex screed in Wokingham
A fixed written price within 24 hours, once we know the area and the base. See our floor levelling cost guide.
Who lays your latex screed in Wokingham

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.
See what customers say in our Google reviews and on our testimonials page.
Latex screed from Slough to Wokingham
Wokingham is about 11.7 miles south-west of our Slough base as the crow flies, with postcodes including RG40 and RG41. The nearest towns to it are Crowthorne (3.3 miles), Bracknell (3.5 miles), Woodley (4.4 miles) and Sandhurst (4.6 miles).
More on latex screed, part of our screeding services. For every screed we lay locally, see floor screeding in Wokingham.
Further reading: latex, self levelling compound or screed.