info@kandbscreeding.co.uk

Sand and Cement Screed · Berkshire

Sand and Cement Screeding in Wokingham

In Wokingham our sand and cement is batched at the job, then laid by hand and compacted until the floor is dense and level. Wokingham's older and post-war houses reach the point where tired solid floors are dug out and relaid, and where garages become rooms, and those are the jobs where a site-mixed screed fits better than a pumped one.

Digging out tired floors in older Wokingham homes

Of Wokingham's homes, 26% went up in the years 1945 to 1972 and a further 6% predate 1919. A solid ground floor from those years may have cracked, settled or lost whatever damp protection it had. When it has, patching rarely lasts. A longer-lasting answer is to take it out and build it again from the ground up.

That rebuild follows a set order. The old floor comes up and the ground is taken down to the depth needed. First comes a damp proof membrane, then the insulation, then edge strip around the room, and the screed goes on last. Laid floating over insulation in a home, sand and cement is 65mm deep. It is compacted and finished by hand or with a power float to take tiles, wood or carpet.

Sand and cement suits renovation work for several reasons. It is mixed on site to the quantity each room needs, so there is no minimum load and no pump to park. Being laid by hand, it gets into small rooms, round chimney breasts and through awkward doorways. And it can take load early, so the rest of the renovation carries on.

The mix can be adapted. Fibres, adding around £1 to £3 per m², help control cracking over insulation; see fibre reinforced screed. If the room is needed soon, a quick drying screed with additives cuts the wait, at £20 to £28 a square metre on 2026 published figures.

Wet rooms, garages and falls in Wokingham houses

Garage conversions are a common way to add a room to a family house. A garage slab is usually lower than the house floor and uninsulated, so it gets a membrane, insulation and screed on top until it is level with the hall. Our guide to garage floor screeds covers the build-up in order.

A wet room needs its floor angled so that water heads for the drain. Laid by hand, the cement mix can be trowelled precisely to that slope, and it copes with water that would weaken calcium sulphate. The screed is tanked before tiling.

If the concrete base is sound and there is little height to play with, 25 to 40mm of bonded screed can be stuck straight onto the prepared slab. On 2026 published figures, bonded screed costs between £12 and £18 a square metre.

Its weak point is how long it takes to dry. Expect about one day per millimetre up to 40mm and slower beyond, which puts a 65mm floor several weeks away from tiles or wood, and longer in a cold spell. Allow for that in the programme from day one. For Crowthorne, about 3.3 miles away, see hand-laid screed in Crowthorne.

Sand and Cement Screed prices in Wokingham

Sand and cement screed: £18 to £25 per m² supplied and laid (MyJobQuote, August 2026), so £450 to £630 for 25 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your sand and cement screed in Wokingham

Wide view of a finished screed hallway in a timber framed build
Wide view of a finished screed hallway in a timber framed build.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Sand and Cement Screed from Slough to Wokingham

Wokingham is about 11.7 miles south-west of our Slough base as the crow flies, with postcodes including RG40 and RG41. The nearest towns to it are Crowthorne (3.3 miles), Bracknell (3.5 miles), Woodley (4.4 miles) and Sandhurst (4.6 miles).

More on sand & cement screed, part of our screeding services.

FAQs

Sand and Cement Screed in Wokingham: your questions

Is sand and cement screed as strong as concrete?

It does a different job. Screed is the levelling layer laid on top of the slab or the insulation to carry the floor finish; it is not the structural slab. Properly compacted, sand and cement makes a dense, tough floor for homes and the majority of commercial buildings. If more strength is called for, a stronger mix can be specified. A structural concrete slab is outside our scope.

Can I lay sand and cement screed myself?

Small patches, possibly. A full room is tougher than it seems: the mix must be right, the screed compacted through its full depth and finished flat wall to wall, and poor compaction can let it break up under tiles. The cost of relaying a failed floor usually outweighs the saving, so most people leave larger floors to a screeder.

Why does sand and cement take longer to dry than liquid screed?

Mainly because it is laid deeper. A floating sand and cement floor is 65mm in a home against about 35mm for liquid, and drying slows past the first 40mm. The water in the mix has to leave through the surface, so thickness, room temperature and ventilation all affect it. We test before flooring goes down.

Nearby

Sand and Cement Screed near Wokingham

Free, no-obligation quote

A fixed price for your Wokingham floor