info@kandbscreeding.co.uk

Floor Levelling · London

Floor Levelling and Self Levelling Screed in Brent

Across Brent, self levelling compound is what gives plank vinyl, sheet vinyl, big tiles or engineered boards a flat surface to go onto. Conversion drives this work locally: 17% of Brent's homes are converted flats, and the split period houses of Kilburn and Brondesbury often need their floors brought level before new finishes. Offices and commercial units at Park Royal and Wembley Park need the same at refit time.

Flat floors for Kilburn and Brondesbury flats

Floors in a converted period house rarely agree with each other. An old solid floor carries patches where pipes went through, a new bathroom sits a little proud, and an extension meets the original house at another height. Thin finishes give away every step and hollow.

After priming, the compound is poured and flows out into a smooth surface, usually 2mm or so at the thinnest and about 10mm at the thickest, with some products able to go deeper. We work to whichever flatness class the flooring maker sets. BS 8204 permits 3mm of deviation beneath a 2m straightedge for SR1, while SR2 tolerates 5mm and SR3 10mm. Many thin sheet finishes need SR1, so LVT and vinyl usually do.

Concrete, calcium sulphate, sand and cement and older floors each take a primer of their own. Old adhesive, paint and weak surface material have to be removed first, as part of our floor preparation work.

Compound is a top layer, never a repair for a floor that has failed. Poured deep to disguise a base that has come loose, turned damp or slopes badly, it can crack and debond. When the base has got that bad, a new hand-laid screed for a Brent period floor is the better answer. Where the base is sound and only wants the thinnest skim, latex screed may be enough.

Office and unit refits at Park Royal

Park Royal is a large commercial estate that sits partly in Brent, and the former Guinness brewery site there is now home to Diageo's head office. At Wembley Park, Quintain continues to add commercial space. When offices and units like these are refitted, the floor under old carpet tiles or vinyl is often not ready for a new finish.

A refit floor usually needs old adhesive removed, holes and cracks filled, a primer suited to the base and a levelling coat to the flatness the new flooring calls for. Quick drying compounds mean the flooring contractor can follow on soon after, so the fit-out holds its dates.

Where a unit floor needs more than levelling, such as a new wearing screed, it moves over to our commercial screeding service. If you need resin, polished concrete or a structural power floated slab, that is another contractor's trade.

For a quote, send the floor area, the current finish, the flooring to follow and the date the fitter is booked. We give a written, fixed price within 24 hours, so the levelling can be slotted into the fit-out.

How we price floor levelling in Brent

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Brent

Fresh floor screed laid against a blue perimeter edge strip in a new build
Fresh floor screed laid against a blue perimeter edge strip in a new build.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Brent

On the map, Brent sits east of Slough, about 16.8 miles from our base in a straight line (postcodes including HA0, NW2, NW10 and NW6), next to Ealing (3.5 miles), Hammersmith and Fulham (4.3 miles), Kensington and Chelsea (4.5 miles) and Camden (4.5 miles).

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Brent: your questions

Can uneven floorboards in a Brent flat be levelled with compound?

Not usually on their own. Self levelling compound needs a rigid base, and loose or springy boards will crack it. Timber floors are normally overboarded with a suitable sheet first, then primed and levelled with a product made for that use. On a concrete or screed base, compound goes straight on after priming.

How long does floor levelling take before new flooring?

That comes down to the product and how thick it goes on. Quick drying compounds keep things moving, and the maker's sheet for each product gives the times for foot traffic and for flooring. Thicker layers need longer. On a Brent office refit, levelling normally fits into the gap between the strip-out and the flooring contractor.

Is floor levelling cheaper than a new screed?

In most cases it is, because the layer is only a few millimetres to around 10mm thick and needs less preparation. It works only on a sound base, though. Where a Kilburn period floor has cracked right through, gone damp or sits well off level, only a new screed will last, and we will tell you that.

Free, no-obligation quote

A fixed price for your Brent floor