Underfloor Heating Screed · Surrey

Underfloor Heating Screed in Egham

We lay screed over wet underfloor heating in Egham, in new build homes, heated extensions and garden rooms. A lot of Egham is new: 23% of its homes were built since 2000, and new build homes suit underfloor heating screeds. What we do is the screed itself, poured to the correct depth with the pipes fully buried. The pipework is fitted and pressure tested by your heating engineer before we turn up.

Pipe cover and depth in Egham's newer homes

A heated screed does two jobs. It has to move warmth out from the pipes to every part of the room, and hold up the tiles or boards without cracking. Both depend on getting the cover over the pipes right.

A liquid pour has to bury the pipes by 25mm or more, giving a screed of usually 45 to 50mm. As it flows it fills every gap round the pipes, so no air is trapped and the room heats up sooner and more evenly. A hand-laid sand and cement floor needs about 45mm over the pipes, which adds depth and weight. Our screed depth guide shows how these figures sit on top of the insulation.

Before any pour, the build-up is checked: insulation laid tight, an edge strip round every wall, a membrane where the specification calls for one, and the pipes fixed and tested. We can provide insulation boards, edge strip and membrane; the heating pipes themselves never do, as K & B does not fit them.

Egham's newer housing suits this kind of floor from the design stage. On an extension to a post-war or 1970s to 1990s semi, the heated floor is being added to an older house instead, and the new floor has to finish level with the existing rooms. A step at the join between old and new can be dealt with by levelling the floor before flooring.

Commissioning heated floors in Egham homes and garden rooms

Rushing the first heat-up is how a lot of heated floors get damaged. Calcium sulphate can normally have the heating brought on from around day 7. Sand and cement has to wait at least until day 21. In both cases the system starts at a low flow temperature and is raised a little at a time. You get the warm-up plan on paper, so you and your heating engineer are working from one schedule.

Garden rooms add their own checks. The base should be a sound slab, the building weathertight and the insulation continuous under the whole floor, otherwise heat is lost into the ground.

Retrofitting heating into the Victorian and Edwardian houses of Englefield Green and older Egham is a bigger job. Their ground floors often have to come up anyway during renovation, which creates the depth for insulation, pipes and screed. Where the floor cannot be dug out far, a liquid screed at minimum cover keeps the height down.

In published 2026 figures, pouring liquid screed over heating pipes is priced from £20 to £35 per square metre. For the pour itself, see liquid screed in Egham, or the same service in Windsor.

Underfloor Heating Screed prices in Egham

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our floor screeding cost guide or screed calculator.

Who lays your underfloor heating screed in Egham

Underfloor heating pipework running between two rooms before screeding
Underfloor heating pipework running between two rooms before screeding.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor Heating Screed from Slough to Egham

Egham is about 8.1 miles south-south-east of our Slough base as the crow flies, with postcodes including TW20, TW18 and GU25. The nearest towns to it are Staines-upon-Thames (1.6 miles), Chertsey (3.4 miles), Ashford (3.8 miles) and Windsor (4.3 miles).

More on underfloor heating screed, part of our screeding services.

FAQs

Underfloor Heating Screed in Egham: your questions

Can underfloor heating go in when an Egham ground floor is rebuilt?

Yes, and that is the easiest time to add it. Digging out the old floor opens up enough depth for the insulation, then the pipes, then the screed, each at its proper thickness. Your heating engineer puts the pipes in and tests them, and our pour follows. Setting the finished level at the start avoids a step between the heated floor and the hall.

Why does underfloor heating need to be warmed up slowly?

A new screed still holds moisture, and heating it hard and fast makes it dry unevenly, which can cause cracking. Starting at a low flow temperature and raising it gradually over days lets the screed dry evenly. On calcium sulphate the first gentle heat can go on at about 7 days; on sand and cement, not before 21 days.

What floor finishes can go on a heated screed?

Tiles, LVT and engineered wood all work on a heated screed, as long as the floor is flat and dry enough for the product. Each flooring maker sets its own moisture limit. Once the screed passes a moisture test, and any laitance has been sanded off a calcium sulphate floor, the finish can go down.