info@kandbscreeding.co.uk

Liquid Screed · Hampshire

Liquid Screed in Andover

We lay pumped liquid screed across Andover, from ground floors in newer houses to large extensions on detached homes, covering the whole area in a single visit, with the floor walkable within 24 to 48 hours. A lot of Andover is young: 32% of its homes were built since 2000, and newer estates such as Augusta Park and Picket Twenty are part of that growth.

Liquid screed for Andover's larger floors and newer estates

Large, open floors are where pumping pays off. It levels itself, flows into corners and leaves a dense surface with low shrinkage and far fewer joints than a hand-laid floor, so one crew can cover a whole ground floor in a day.

Andover has plenty of floors like that. Detached houses make up a large share of the town, and they tend to produce bigger extension and garage conversion projects with wide areas to cover. Homes built since 2015 make up 16% of the stock, and a new ground floor over insulation is a natural fit for a floating liquid screed.

On newer estates such as Augusta Park and Picket Twenty, there is another use. When floor finishes are being replaced, a thin liquid screed can go over a new heating layer without raising the floor too far. How much screed goes over the pipes, and how to bring the heating up, is on our Andover page for heated floor screeds.

Thickness is set by what lies beneath. A house floor floated on insulation starts from around 35mm, and a commercial one from 40mm. Heating pipes want 25mm or more above them, which brings the whole floor to 45 to 50mm. The surface comes up to SR1 or SR2 without a struggle, and either class is flat enough to take engineered wood, LVT or tiles.

The binder in the mix is either calcium sulphate or cement. For what a specified calcium sulphate grade means in practice, see anhydrite flow screed.

Access, drying and pricing for liquid screed in Andover

A liquid screed is mixed off site and pumped in through a hose, so what matters on the day is where the truck and pump can park. Detached houses with drives are usually simple. If you live on a terrace, or the hose has a long way to go to a rear extension, let us know about parking and the way through at the quote stage so the route is worked out in advance.

Before the pour, the room must be weathertight, with insulation and membrane laid, the edge strip fitted and any pipes tested. Within a couple of days people can walk across it, but drying takes something near a day a millimetre until the depth reaches 40mm, and slows once it is deeper. How to bring that forward is covered in our article on screed drying.

A pumped liquid floor costs £24 to £31 per square metre on published UK prices for 2026. Smaller areas cost more per metre because the pump carries a fixed cost: pump hire on its own runs at £300 to £600 per day. We do not hire out pumps; we supply, pump and finish the screed as one job, and our screeding cost guide sets out what else affects the price.

Liquid Screed prices in Andover

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Andover

Finished screed with pipe entry visible at the wall
Finished screed with pipe entry visible at the wall.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Andover

As the crow flies, our yard in Slough is about 42.5 miles from Andover, which lies to the west-south-west. Postcodes here include SP10 and SP11, and Tidworth (8.4 miles), Winchester (12.4 miles), Amesbury (13.3 miles) and Newbury (14.9 miles) are close by.

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Andover: your questions

How long before I can tile on liquid screed?

A floor you can stand on is not yet a floor you can tile, and the tiler should hold off until a moisture test confirms it is dry. Allow something like one day a millimetre up to 40mm, which means a 50mm floor in an Andover house waits weeks, not days. With a calcium sulphate mix, running the heating to force dry it from around day 7 can bring that forward.

Is liquid screed worth it for a small room?

Sometimes not. Pumping carries a fixed cost for the truck, pump and set-up, so for a single small room or a cloakroom, hand-laid sand and cement can work out cheaper. Liquid screed pays off on bigger areas, open-plan layouts and floors with underfloor heating. We will tell you which makes sense for your Andover floor.

Can liquid screed go on the first floor of an Andover house?

Yes, where the structure is suitable. Liquid screed can be pumped to upper floors, and it lays thinner than traditional screed, which helps with both weight and floor height. We check the structure, its movement and the layers beneath before pricing, and recommend another approach if that suits the building better.

Free, no-obligation quote

A fixed price for your Andover floor