info@kandbscreeding.co.uk

Liquid Screed · Wiltshire

Liquid Screed in Tidworth

We pump liquid screed in Tidworth for extensions, open-plan rooms, new houses and flats. The fact that shapes it locally is how recent much of the housing is: 25% of Tidworth's homes were built from 2015 onwards, and modern floor build-ups with insulation and heating suit a self-levelling screed. For the post-war semis and terraces that owners extend, liquid screed lays a large, flat floor in one visit.

Where pumped liquid screed fits Tidworth homes

A hose runs from the mixer outside to the room, and the screed is pumped along it. It settles to its own level, so a large floor goes down in one continuous pour rather than in hand-laid bays. That makes it a sensible choice for an extension that opens a kitchen, dining and family space across the back of a post-war semi or terrace, the homes owners in Tidworth tend to extend.

It also gives a very flat result. Reaching SR1 or SR2 is straightforward with it, so under a 2m straightedge the gap stays within 3mm or 5mm. A floor like that gives engineered boards, LVT and big tiles a true base. Low shrinkage means few joints, even across a long room.

How deep it goes is set by what lies beneath. On insulation in a house, the minimum is about 35mm. Pipes for underfloor heating need 25mm or more of screed on top, taking the overall depth to around 45 to 50mm. Liquid screeds come as calcium sulphate or cement based mixes, and the deciding question is usually whether that floor could ever get wet.

It works for flats too. Flats make up 20% of Tidworth's homes, and an apartment floor is usually a single open area where a pumped screed can be laid quickly. To weigh the two materials against each other, read liquid or sand and cement: which to pick.

Pump access and drying on Tidworth streets

On the day, our mixer and pump set up on the road or your drive, with the hose taking the screed indoors. A drive or space right outside makes the setup simple. If the house sits on a shared drive or a narrow road where parking is limited, tell us when you ask for a price so we can plan where the pump stands and how far the hose has to run.

Upper floors and flats can be reached as long as there is a clear route for the hose up a stairwell or through a window. There is more on how that is arranged on our screed pumping page.

Light foot traffic is normally fine 24 to 48 hours after pouring. Getting dry enough for flooring is a much longer wait. Allow around one day for every millimetre up to 40mm, then more for each millimetre after, and expect ventilation and warmth to change the pace a lot. Our drying times guide covers how to plan around it. For the same service a short way east, see liquid screed in Andover.

Liquid Screed prices in Tidworth

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Tidworth

Finished floor screed in a large glazed room
Finished floor screed in a large glazed room.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Tidworth

As the crow flies, our yard in Slough is about 48.4 miles from Tidworth, which lies to the west-south-west. Postcodes here include SP9 and SP11, and Amesbury (7 miles), Andover (8.4 miles), Salisbury (13.1 miles) and Devizes (16.2 miles) are close by.

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Tidworth: your questions

How soon can I walk on liquid screed in a Tidworth extension?

Normally after 24 to 48 hours, though the exact product and how warm the room is both play a part. Being able to stand on it does not mean it is ready for flooring. Tiles, LVT and wood need the screed to be dry enough to pass a moisture test, which takes considerably longer and depends on depth and ventilation.

Does liquid screed need a membrane underneath?

Yes. A liquid screed is poured over a membrane or a lined insulation layer so it cannot leak through joints and gaps, and an edge strip goes round the walls to allow for movement. Before pouring in a Tidworth extension, we look over the edge strip, membrane and insulation, and can bring any that have not been fitted.

Can liquid screed go into a small Tidworth hallway or cloakroom?

It can, but on a small, separate room it is often not the most economical choice, because the pump setup costs the same whatever the area. Where a hallway or cloakroom is being done on its own, hand-laid sand and cement may be better value. If it joins a larger pour, liquid screed can run through in one go.

Nearby

Liquid Screed near Tidworth

Free, no-obligation quote

A fixed price for your Tidworth floor