info@kandbscreeding.co.uk

Liquid Screed · Hampshire

Liquid Screed Contractors in Romsey

Our team pumps and finishes liquid screed all over Romsey, whether it is a rear extension, an open-plan ground floor, a new house or a flat. In Romsey, the house the new floor joins sets the job. Only 24% of Romsey's homes date from 2000 or later, so a liquid pour often has to meet an older concrete slab at exactly the right height. Get that join and the depth right, and the pumped floor settles flat and dense in a single visit.

Liquid screed for Cupernham and Halterworth extensions

The post-war and late twentieth century terraces and semis in areas such as Cupernham and Halterworth are typical candidates for a single storey rear extension. That kind of room is where liquid screed earns its place. It comes straight off the mixer, travels along a hose and spreads over the insulation, finding its own level. It hardly shrinks while setting, so a big kitchen-diner can be done in one day and needs far fewer joints than the same room screeded by hand.

Depth comes first. In a house, a floating liquid floor begins at about 35mm thick; on commercial jobs the starting point is about 40mm. Where the new floor meets the old slab, we set the levels so the finished surface runs through the opening without a step, allowing for the thickness of the floor covering on each side.

Builders also pick it for how flat it finishes. It will readily reach SR1 or SR2 for surface regularity, which helps when large format tiles or LVT are going on top, with little extra work. Usually it can be walked on 24 to 48 hours later, which means the rest of the build loses very little time.

Drying still takes a while. Think of a day for each mm through the first 40mm, with the rate slowing on deeper floors. Anyone lining up a Romsey kitchen fitter behind the pour can check our screed drying times explained for ways to shorten the gap. We use calcium sulphate or cement based liquid screed, picking between them for the room and its finish.

Getting the pump to a Romsey room

The first job for any liquid pour is finding a spot to park the mixer and pump. They need to be within a hose run of the room, and the hose then travels through the house or along the side of it. Where the house has its own drive, that part is straightforward. In a terrace, the hose may need to pass through the front room, so we protect floors and doorways on the way.

Flats of all kinds make up 17% of Romsey's homes. Upstairs flats are pumped via the stairwell or a window, with the hose route and parking usually agreed with the building manager well before the day.

Near the Market Place, which has been pedestrianised since 2019, vehicle access is the first thing to settle. Tell us about restrictions and loading when you ask for a price.

Our pumps and machines are not for hire, but the screed pumping page shows how the kit is set up on site. Planning a heated room? The Romsey heated floor screed page sets out how much cover the pipes need.

Liquid Screed prices in Romsey

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Romsey

Finished screed with the edge membrane trimmed ready for flooring
Finished screed with the edge membrane trimmed ready for flooring.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Romsey

Romsey is about 52.7 miles south-west of our Slough base as the crow flies, with postcodes including SO51 and SO16. The nearest towns to it are Totton (4.9 miles), Eastleigh (6.5 miles), Southampton (7.2 miles) and Winchester (9.6 miles).

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Romsey: your questions

How thick does liquid screed need to be in a Romsey extension?

In a Romsey house, liquid screed laid floating over insulation begins at about 35mm. Over heating pipes it needs a minimum 25mm on top, taking the total to around 45 to 50mm. We confirm the depth from your drawings and from the level of the existing floor, so the new extension meets the old house without a step.

When can the kitchen fitter start on a new liquid screed floor?

Light foot traffic can usually cross it a day or two later (24 to 48 hours), letting trades get on early. Heavy units and floor coverings need to wait until the screed is dry enough, which depends on depth, ventilation and heating. A moisture test settles it, and the flooring manufacturer sets the limit, so plan the fitter's date around the test.

Is liquid screed dearer than sand and cement for a Romsey house?

Measured by the square metre, usually yes. Against £18 to £25 for sand and cement, liquid comes to £24 to £31 a square metre, going by figures published for the UK in 2026. On a large open extension the gap narrows because liquid is laid faster and thinner, and it is often flat enough to skip extra levelling. Totton, about 4.9 miles away, is covered too: see liquid floors in Totton.

Free, no-obligation quote

A fixed price for your Romsey floor