info@kandbscreeding.co.uk

Underfloor Heating Screed · Hampshire

Underfloor Heating Screed in Eastleigh

Over wet underfloor heating in Eastleigh, we lay either a hand-laid cement screed or a pumped liquid one, whichever fits the system and the room. The pipes are laid by your heating engineer, not by K & B; our job is to cover them fully, at the right depth, and hand over a safe heat-up plan. Here that usually means heated extensions on post-war houses, and older terraces where a timber floor is coming out and heating is going in.

Heated extensions and retrofits across Eastleigh

Underfloor heating works through the screed. The pipes warm the screed, and the screed warms the room. If there are air gaps round the pipes, or too little cover over them, the floor heats unevenly and can crack along the pipe lines.

On a post-war semi or detached house in areas such as Bishopstoke, Boyatt Wood and Fair Oak, a new rear extension is the obvious place for heating. The screed has to cover the pipes and still finish at exactly the level of the existing kitchen or living room. In an older terrace near the town centre, the chance comes when the suspended timber or early concrete floor is taken out: that creates the depth for insulation, pipes and screed together.

Here is how the height budget works out. Liquid screed has to cover the pipes by no less than 25mm, which comes to about 45 to 50mm overall, while a hand-laid cement screed needs around 45mm over them. The liquid option flows fully round the pipes with no voids and warms up faster, and our page on pumped liquid screed in Eastleigh explains how it is laid.

Before we pour, we check that the insulation boards are tight, the edge strip is fixed round every wall and the membrane is sealed. Detached houses make up 21% of Eastleigh's homes, and their larger ground floors often run heating across several rooms, so zone joints are agreed with the heating engineer beforehand.

First heat-up and repairs in Eastleigh's newer homes

The first time the heating is used, it needs to be gentle. Calcium sulphate is usually ready for low heat at around 7 days; cement screed has to be left for at least 21. From there the temperature goes up in small steps over several days, is held, and then comes down again. We hand over written guidance for the screed side, to sit alongside the engineer's commissioning schedule.

Newer homes bring a different kind of job. Of Eastleigh's homes, 15% were built between 2000 and 2014, and many of those have heating already in the floor. When a section of screed there cracks, lifts or has to be opened up to reach a pipe, the repair has to protect the pipes and match the level around it. Our screed repairs service handles that.

For drying times over heating, and how the heating helps, see how long screed takes to dry. Heated liquid floors are listed at £20 to £35 a square metre in the published 2026 UK prices. For homes towards the north, see underfloor heating screed in Winchester.

Underfloor Heating Screed prices in Eastleigh

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our floor screeding cost guide or screed calculator.

Who lays your underfloor heating screed in Eastleigh

Underfloor heating pipe loops fixed over insulation in a long extension
Underfloor heating pipe loops fixed over insulation in a long extension.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor Heating Screed from Slough to Eastleigh

As the crow flies, our yard in Slough is about 49.6 miles from Eastleigh, which lies to the south-west. Postcodes here include SO50 and SO53, and Hedge End (4.4 miles), Southampton (5 miles), Romsey (6.5 miles) and Winchester (6.6 miles) are close by.

More on underfloor heating screed, part of our screeding services.

FAQs

Underfloor Heating Screed in Eastleigh: your questions

How much screed goes over underfloor heating pipes?

Liquid screed goes at least 25mm over the pipework, making the floor about 45 to 50mm deep in all. Cement laid by hand needs about 45mm above the pipes, so it builds up deeper. In an Eastleigh extension, the choice often comes down to how much height is available to meet the existing floor.

Can underfloor heating be added when an old timber floor comes out?

Yes, and it is one of the better times to do it. With the suspended timber floor removed, there is room for insulation, a membrane, the heating pipes and a screed. Your heating engineer lays the pipes and we screed over them, finishing level with the rooms next to it.

Can a cracked screed over underfloor heating be repaired?

Usually. The damaged area is cut out carefully so the pipes are not harmed, the pipes are checked, and new screed is laid to match the surrounding level. The cause matters too: a floor heated too fast when it was new, or with too little pipe cover, may crack again unless that is understood.

Nearby

Underfloor Heating Screed near Eastleigh

Free, no-obligation quote

A fixed price for your Eastleigh floor