Liquid Screed · London

Liquid Screed Contractors in Hackney

Liquid screed in Hackney is often a question of getting a hose to an upper floor. We pump self-levelling screed into new flats, extensions and open-plan rooms across the borough, where it settles flat and dense and can usually be walked on within 24 to 48 hours. With 60% of Hackney's homes in purpose-built blocks, the pump route through a building matters as much as the mix.

Pumping liquid screed into Hackney flats and blocks

A liquid screed pour starts at the lorry. The mixer feeds the pump, and the hose is run from the street to the room, whether that is a ground floor extension or a flat several storeys up. Stairwells, windows and corridors can all serve as routes, but each needs protecting and keeping clear on the day.

Blocks bring extra steps. Many managing agents set working hours, want common parts protected and ask for notice to residents. Loading on busy streets may need a bay suspension or a permit. Sending photos of the entrance and the route when you ask for a price lets us plan it properly rather than on arrival.

Once the hose is in place, speed is the advantage. A pumped screed can cover a whole flat, or several, in a day. It flows round underfloor heating pipes without voids and reaches SR1 or SR2 flatness without hand finishing, and it shrinks far less than sand and cement, so joints are fewer.

At Woodberry Down, where more than 5,500 new homes are replacing about 2,000 older ones, the new blocks use pumped liquid screed with underfloor heating. For the heating side of that build-up, including pipe cover and first warm-up, see underfloor heating screed in Hackney.

We do not hire out pumps or machines. Where a contractor needs the placing done by a screeding team, see our screed pumping service.

Depth, flatness and drying in Hackney homes

In a home, a floating liquid screed over insulation usually starts from about 35mm, and commercial floors from about 40mm. Over heating pipes, the screed needs at least 25mm above them, for a total of about 45 to 50mm. In a converted flat, where the floor has to finish level with the front door and meet the building's sound requirements, those depths are worked out before anything is ordered.

Both calcium sulphate and cement based liquid screeds are available. The specification, the room and the finish decide which, and a calcium sulphate screed specification brings its own sanding and testing steps.

Walkable is not the same as ready for flooring. Drying runs at about a day per millimetre for the first 40mm and more slowly after that, and good ventilation helps. The screed thickness guide explains how depth and drying time relate.

Liquid screed is less suited to tiny, broken-up rooms and floors that will get wet. There, a sand and cement screed in Hackney is usually the better fit, and the two can be combined in one flat.

Liquid Screed prices in Hackney

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Hackney

Finished floor screed across an open roof terrace
Finished floor screed across an open roof terrace.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Hackney

Hackney is about 25.1 miles east of our Slough base as the crow flies, with postcodes including N4, E5, N16 and E8. The nearest towns to it are Islington (2.1 miles), Tower Hamlets (2.5 miles), Haringey (3.5 miles) and Camden (3.8 miles).

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Hackney: your questions

Is liquid screed a good idea in a Hackney warehouse conversion?

Often not as the first choice. Warehouse conversions in Shoreditch and Hoxton tend to suit ground concrete or thin levelling screeds over the existing slab, because the structure is already there and height is precious. A liquid screed makes sense where new insulation or heating pipes are being added on top. We look at the slab before advising.

How soon can I walk on liquid screed?

People can usually tread on it carefully once it has had 24 to 48 hours. Heavier loads, trades wheeling equipment and floor coverings all need longer. In a flat where other trades need to cross the floor, we agree a walking route and timing with you so the new surface is not marked while it is still young.

Can liquid screed go over an existing concrete floor?

Yes. Usually it floats on insulation or an acoustic layer laid over the old slab, with a membrane between. In a Hackney flat that layer also helps with sound between floors. The existing floor must be sound and clean, and any cracks or loose areas are dealt with first so the build-up sits evenly.