info@kandbscreeding.co.uk

Floor Levelling · London

Floor Levelling and Self Levelling Screed in Hackney

We level floors across Hackney with self levelling compound, ready for LVT, vinyl, large tiles and engineered wood. Period terraces here that have been split into flats often have uneven old floors, and conversions in Shoreditch, Hoxton and Hackney Wick bring existing concrete that needs flattening before a new finish. A compound pour of about 2mm to around 10mm, over the right primer, is usually the quickest way to a flat base.

Levelling old floors in Hackney's converted terraces

Old floors are rarely flat. In period terraces in De Beauvoir, South Hackney and Clapton that have been split into flats, uneven old floors are common, and a modern thin finish will show every step and dip.

The standard is BS 8204. Under a 2m straightedge, SR1 permits a gap of no more than 3mm, SR2 5mm and SR3 10mm. SR1 is the class many thin sheet finishes demand, and the flooring maker's instructions set the class for anything else.

Self levelling compound brings a sound floor to that class. It is usually laid from about 2mm to around 10mm, with some products made for more, and fast drying versions keep a refurbishment moving. The base is cleaned, old adhesive removed and the right primer applied first: a sand and cement screed, bare concrete, a calcium sulphate screed with its laitance sanded off, and old tiles each call for a different one.

In a flat, the edges matter too. The compound must not bridge an acoustic layer or edge strip, or it can carry sound into the walls.

Compound is not a cure for a failing floor. If the floor is loose, cracked through or out by far more than the compound's range, a deep pour can crack and debond. The answer then is screed repairs or a new sand and cement floor in Hackney, and we would say so at the quote.

Concrete floors in Shoreditch, Hoxton and Hackney Wick

Warehouse conversions in Shoreditch and Hoxton suit ground concrete or thin levelling screeds over the existing slab. The concrete may need repair or grinding before anything will bond to it. Concrete floor grinding opens the surface and removes old coatings, and the floor can then be primed and levelled. We do not lay polished concrete or resin, but we can prepare and level a slab for other finishes.

Conversions in Hackney Wick, light industry around the River Lea, and shops and workspace in new schemes share the same need: a level floor, often over existing concrete. In a fit-out, the floor usually has to be ready by a fixed date, so we plan the preparation, primer and compound around the opening day and use fast drying products where the programme is tight.

Where a slab is badly broken, concrete floor repair comes before any levelling, because compound is only as sound as the base beneath it.

To price a job, send the area, the new finish, photos of the current floor, and any access limits such as working hours or goods lifts. We reply with a written, fixed price within 24 hours.

How we price floor levelling in Hackney

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Hackney

Bright finished floor screed in a domestic room ready for flooring
Bright finished floor screed in a domestic room ready for flooring.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Hackney

Hackney is about 25.1 miles east of our Slough base as the crow flies, with postcodes including N4, E5, N16 and E8. The nearest towns to it are Islington (2.1 miles), Tower Hamlets (2.5 miles), Haringey (3.5 miles) and Camden (3.8 miles).

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Hackney: your questions

Can you level a floor in an occupied Hackney flat?

Usually, room by room. Compound needs the room cleared, the floor cleaned and primed, and time to set before anyone walks on it, so we plan the order with you. Fast drying products shorten the time each room is out of use. Shared entrances and stairs are protected while materials come in.

How much levelling compound does an uneven floor need?

Most floors need somewhere between about 2mm and 10mm, depending on how far out they are under a 2m straightedge. We measure high and low points before quoting. If some areas need far more depth than a compound is made for, it is usually better to repair or rescreed those areas first and then level the whole floor.

Will levelling compound work over old floor tiles?

Often it will, if the tiles are firmly bonded, clean and primed with a product made for that surface. Loose or hollow tiles have to come up first, because the compound is only as good as what is under it. In older Hackney buildings we check the floor before pricing so there are no surprises when the old flooring is lifted.

Nearby

Floor Levelling near Hackney

Free, no-obligation quote

A fixed price for your Hackney floor