info@kandbscreeding.co.uk

Liquid Screed · Hampshire

Liquid Screed Contractors in New Milton

A mixer outside feeds the screed by hose straight into the room, and two kinds of New Milton floor suit it particularly. First, the opened-up ground floor of a post-war detached house, where a big new area must meet an old slab. Second, the upstairs flat: with 27% of local homes in purpose-built blocks, running a hose up the stairs is far easier than carrying material up. Either way, you can walk across it gently a day or two later, 24 to 48 hours at most.

Open plan remodels in New Milton's detached houses

Turning kitchen, dining room and new extension into one room leaves a large area to cover and normally two old floor heights to reconcile, a common puzzle in the town's post-war detached houses. In New Milton's detached houses of the 1950s to the 1990s, the screed gets matched to the existing concrete slab, so every level is measured back from that line.

Three things make a pumped screed easier here. One: it goes in to a set datum and spreads itself flat, comfortably meeting SR1 or SR2, so a two metre straightedge will show a gap of 3mm or 5mm at worst. Two: it is slim. Floating in a house it can start at roughly 35mm, where sand and cement needs some 65mm, leaving space for insulation without lifting the new floor above the old. Three: shrinkage is minimal, so even a wide open floor needs few joints.

That flatness shows its worth when the floor covering goes on. Open rooms usually get one material throughout, tile, LVT or engineered wood, and a flat base with few joints lets no ridges telegraph through.

Pumped screed is made with one of two binders, gypsum-based calcium sulphate or cement. Pumping is identical; drying, surface preparation and where each may be used differ, and the calcium sulphate side is on our New Milton anhydrite page. For the two methods compared directly, see pumped versus hand-laid screed.

Pumping into New Milton flats and back extensions

The pump stands on the road or the drive while the hose takes screed into the room. In a block of flats it goes through the front entrance and up the stairs, so nothing gets carried and communal areas are protected along the way. Let us know which floor the flat is on and whether the block restricts access or working hours.

With a house, it comes down to where the pump can go and how the hose reaches the back. A side path, a garage or a hall all work if kept clear. Flag any parking restrictions in your enquiry.

On a New Milton pour day the room should already have foam strip skirting each wall, polythene across the insulation boards taped at every seam, and a barrier at each door opening. We walk the room and check it all before the hose goes in; the kit itself is described under screed pumping.

Light footsteps at 48 hours tell you nothing about moisture, though. Flooring goes on only when a test reading falls within the maker's limit, and that takes roughly one day per millimetre up to 40mm, then more. We pump screed in nearby Christchurch as well.

Liquid Screed prices in New Milton

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in New Milton

Floor screed with movement joints cut between bays
Floor screed with movement joints cut between bays.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to New Milton

On the map, New Milton sits south-west of Slough, about 69.5 miles from our base in a straight line (postcodes including BH25), next to Lymington (5 miles), Christchurch (5.6 miles), Ringwood (8.8 miles) and Bournemouth (10 miles).

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in New Milton: your questions

Can liquid screed be laid in a first floor flat in New Milton?

Yes. The hose goes from the pump outside, up through the building and into the flat, so no screed is carried by hand. The floor beneath has to be suitable and the build-up, acoustic layer included, agreed beforehand. Before pricing we will ask about the route in, which floor it is and where the pump can park.

How flat is liquid screed once it has set?

Under BS 8204 a pumped screed comfortably reaches SR1 or SR2, which means no more than a 3mm or 5mm gap below a two metre straightedge. That is fine for most tiles, LVT and engineered wood in an opened-up New Milton ground floor. A few thin sheet finishes still want a skim of compound over it, which is quick on a base already this flat.

Does liquid screed crack like old sand and cement floors?

It shrinks far less, so on a properly prepared floor cracking is much less likely and fewer joints are needed. When trouble does happen, it is usually down to preparation: insulation boards not fully supported, a gap in the membrane or edge strip left out. Cracked, hollow screeds in older New Milton houses are a reason to relay them, not a forecast for a new pumped floor.

Free, no-obligation quote

A fixed price for your New Milton floor