Liquid screed for flats and new homes in Wimborne Minster
A purpose-built flat usually has a large, open floor with few changes of level, often over insulation and sometimes over heating. Liquid screed suits that well. It flows across the whole area, levels itself and settles to a surface regularity of SR1 or SR2, so the flooring fitter starts with a flat base.
The same qualities help on the new homes at Leigh Road, Wimborne Chase and Rivers Edge, where underfloor heating screeds are most common. Because the mix closes round every pipe with no hollow spots, a Rivers Edge or Wimborne Chase ground floor warms up quicker. For pipe cover and commissioning, see our underfloor heating screed page for Wimborne Minster.
Floated on insulation, we pour from roughly 35mm in a flat or house, and from 40mm in shops and offices. Shrinkage is slight, so even a long open-plan flat gets by with only a few joints.
There are two broad families. Calcium sulphate liquid screeds are widely used in dry rooms over heating, and cement based liquid screeds are used where a cement substrate is needed. We recommend one for the room and floor finish rather than pushing a single product.
Some Wimborne rooms still suit the old way. A wet room with falls or a small cupboard of a space is usually better in sand and cement. Our liquid or sand and cement explainer helps you choose.
Pump positions for Colehill and Leigh Park extensions
An extension on a post-war family home in Colehill or around Leigh Park can open the back of the house into one large kitchen and family room. A single pour covers that floor in a day, and the room can take foot traffic within 24 to 48 hours.
Round Colehill and Leigh Park the pump normally waits on the drive or by the kerb, and the hose goes in by a side gate or straight through the hall. For one of the town's flats, we run the hose up the shared stairwell, or feed it through an upper window. In the older town centre, space outside may be tighter, so tell us about parking and access when you send the details.
Before we arrive, the insulation and edge strip should be down and the room closed to draughts. Once it is down, leave the doors and windows closed for a day or two before airing the room. Plan on around 40 days of drying for a 40mm floor in a Colehill extension.
Where a builder has laid the build-up and only needs the screed pumped in, our screed pumping service covers that. Liquid screed is also laid in nearby Ferndown.
Liquid Screed prices in Wimborne Minster
Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.
Who lays your liquid screed in Wimborne Minster

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.
See what customers say in our Google reviews and on our testimonials page.
Liquid Screed from Slough to Wimborne Minster
On the map, Wimborne Minster sits south-west of Slough, about 77.2 miles from our base in a straight line (postcodes including BH21), next to Ferndown (4.3 miles), Bournemouth (7.3 miles), Verwood (7.4 miles) and Ringwood (9.2 miles).
More on liquid screed, part of our screeding services.