info@kandbscreeding.co.uk

Liquid Screed · Dorset

Liquid Screed Contractors in Verwood

Liquid screed is pumped into the room and levels itself, which makes it a strong fit for the extensions and open-plan kitchens being added to Verwood's detached houses. With 64% of the town's homes built between 1973 and 1999, extensions are among the most likely jobs on houses of that age. We pour liquid screed across Verwood to a flat SR1 or SR2 finish, walkable in 24 to 48 hours.

Pumped liquid screed for Verwood's detached house extensions

When a detached house from the 1970s, 1980s or 1990s is extended, the new floor is often large and open, joining a kitchen, dining area and family room. That is where liquid screed does its job well.

Because it flows, it fills the whole area in one pour with no compaction, and it settles to a surface regularity of SR1 or SR2 without hand finishing. There is so little shrinkage that even a long kitchen-diner gets by with very few movement joints. For a house floor floating on insulation boards, we would not go much under 35mm.

It also suits heated floors. Nothing is left hollow around the heating loops, which lets warmth travel up evenly and reach the room quicker. If the extension will have underfloor heating, our underfloor heating screed page for Verwood covers pipe cover and commissioning.

Pumped mixes for a Verwood extension are bound either with calcium sulphate or with cement. Which suits your Verwood extension depends on the room, whether it is heated and the floor you have chosen.

Then there is the meeting point with the original rooms. We take the finished floor level from the rooms you already have and work back to the screed depth, so the step between old and new is as small as possible. Before choosing, have a look at our side by side of liquid and sand and cement.

Setting up the pump on a Verwood driveway

On most detached houses the mixer and pump can stand on the drive. From there the hose runs through a garage, a side gate or the front door to the room, and the route is covered to protect floors and door frames. Where a drive is blocked by a skip or a builder's materials, we need to know in advance.

Purpose-built flats are 8% of Verwood's homes. For an upstairs flat, the hose climbs the stairwell or goes in through a first floor window.

Before the pour, insulation and edge strip should be in place and the room closed to draughts. The screed is poured and dappled in a single visit. Leave it closed up for the first day or two, then open the windows to let the moisture out. Because each millimetre of the first 40mm takes about a day to dry, hold off booking whoever lays your flooring until our date is set.

For larger pours, or where a builder has laid the build-up and just needs the screed pumped in, see our screed pumping service. The same liquid screed service runs in nearby Ringwood.

Liquid Screed prices in Verwood

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Verwood

Liquid screed being poured over foil insulation
Liquid screed being poured over foil insulation.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Verwood

Verwood is about 69.9 miles south-west of our Slough base as the crow flies, with postcodes including BH31 and BH21. The nearest towns to it are Ringwood (4.6 miles), Ferndown (5.6 miles), Wimborne Minster (7.4 miles) and Christchurch (10.8 miles).

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Verwood: your questions

How soon can we walk on liquid screed in a Verwood kitchen extension?

Give it 24 to 48 hours and you can usually cross the kitchen in socks. Being able to stand on it is a long way from being ready for tiles or wood, though. It still has to dry, at roughly a day per millimetre for the first 40mm, and the moisture level should be checked before any flooring goes down. Heavy loads and ladders should wait longer.

What is the minimum depth for liquid screed over insulation?

For a Verwood house floor sitting on insulation boards, about 35mm is the thinnest we pour. On a commercial floor it is about 40mm. Add heating pipes and we need 25mm or more sitting above them, so the whole layer usually ends up 45 to 50mm deep. We set the depth to suit the existing floor level in your Verwood house.

Can liquid screed be poured in winter?

Yes. The house just needs to be sealed against the weather, and the room kept frost free until the screed has set. Drying is slower in cold, damp weather, so allow more time before flooring. Where underfloor heating is fitted and the screed is calcium sulphate, gentle heating from about 7 days helps it dry.

Free, no-obligation quote

A fixed price for your Verwood floor