info@kandbscreeding.co.uk

Latex Screed · Dorset

Latex Screed Contractors in Verwood

In Verwood we lay latex screed, a two part compound of cement based powder and latex liquid, a few millimetres thick over bases that need a smooth face before vinyl, LVT, lino or carpet. Much of the town's housing is detached homes from the 1970s to 1990s, and a kitchen or bathroom refit in a house of that age often uncovers chipboard decking, old ceramic tiles or worn sand and cement. Each of those bases needs its own preparation before latex goes on.

Latex over refit floors in Verwood houses

Take a bathroom refit in a 1980s house. Once the old suite and vinyl are out, the floor could be chipboard sheets, ceramic tiles from an earlier makeover, or a sand and cement base with adhesive still stuck to it. Latex screed can smooth all three, but each on its own terms.

Chipboard and floorboards are too lively for a thin cement based layer. We screw the deck down so nothing creaks, then lay flooring grade plywood over it, fixed at close spacing, and the latex fills the joints and screw heads between sheets. Spread straight onto bare timber, it would crack along the edges within weeks.

Old ceramic or quarry tiles can stay if they are firmly bonded. We check for hollow ones, replace or fill anything loose, clean off polish and grease, prime, and then lay the latex just thick enough to bury the grout lines. Old adhesive is treated the same way: thin, hard residue can remain under a suitable primer, while soft or thick glue is scraped or ground off.

The finished surface takes sheet vinyl, LVT, lino, rubber, carpet or safety flooring in a cloakroom or utility. Whether a floor needs a general levelling compound to reach a flatness class is a separate question, covered on our Verwood levelling page. Where the existing screed has broken up, it needs repairs to the screed before any compound goes down.

Damp and bounce checks before latex in Verwood

A thin coat of latex cannot fix a floor that is wet, moving or badly out of level, and laying it anyway only hides the fault for a short while.

Damp comes first. Only 11% of Verwood's homes were built between 1945 and 1972, and 3% before 1919, yet ground floors of that era may have a weak or missing membrane. We take hygrometer readings before pricing. A damp floor needs a membrane or a new insulated screed, not a smoothing coat.

Bounce is next. If boards or chipboard move underfoot, plywood screwed over them will move too, and the latex will crack. Loose decking is fixed or replaced before anything else.

Then level. A floor that drops noticeably from one wall to the other needs building up, and a fresh sand and cement floor for Verwood is often the honest answer, particularly for a failed old slab.

If a floor turns out to be calcium sulphate screed, it must have its laitance sanded off and be primed before latex. We cover homes across Crab Orchard, Dewlands Common, Romford, Woolsbridge and Three Legged Cross, and the same latex work is available over in Ringwood.

How we price latex screed in Verwood

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who lays your latex screed in Verwood

Freshly laid floor screed under site lighting
Freshly laid floor screed under site lighting.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Latex Screed from Slough to Verwood

Verwood is about 69.9 miles south-west of our Slough base as the crow flies, with postcodes including BH31 and BH21. The nearest towns to it are Ringwood (4.6 miles), Ferndown (5.6 miles), Wimborne Minster (7.4 miles) and Christchurch (10.8 miles).

More on latex screed, part of our screeding services.

FAQs

Latex Screed in Verwood: your questions

Can latex screed go over chipboard in a Verwood house?

Not directly. Chipboard flexes and swells if it gets wet, and a thin compound will crack over it. We fix the chipboard down firmly, cover it with flooring grade plywood screwed at close centres, and lay the latex over the plywood. If any chipboard sheets are soft or damaged, those are replaced before the overboarding starts.

How long after latex screed can vinyl be laid?

Latex is laid thin, so it usually dries far faster than a screed, but the exact time depends on the product, how deep it went and the temperature in the room. We give you the figure from the manufacturer's data sheet before we start, so your fitter can be booked for a Verwood kitchen or bathroom without guessing.

Is latex screed waterproof enough for a bathroom floor?

No. Latex smooths the base and bonds well, but it is not a waterproofing layer and it does not stop damp rising from below. In a Verwood bathroom it sits under sheet vinyl or LVT, which give the water resistance, and a wet room needs a proper tanking system as well. A damp floor has to be dealt with before any latex goes down.

Free, no-obligation quote

A fixed price for your Verwood floor