Latex Screed Contractors in Polegate

K & B lays latex screed in Polegate: a two part levelling compound, spread a few millimetres thick, that gives sheet vinyl, LVT, lino or carpet a smooth face over awkward surfaces. Semi-detached houses make up 49% of the town's homes, and a kitchen or bathroom refit in one of them can uncover old tiles, overboarded timber or patched concrete. Latex copes with those bases, provided each one is sound, dry and primed first.

Latex over old tiles and boards in Polegate homes

Latex screed is the trade name for a levelling compound supplied in two parts. Its powder is cement based, and the liquid it is mixed with is latex rather than plain water, which leaves the cured layer with a little flexibility and a firm grip on the surface below. It goes down thin, usually a few millimetres, because its job is to give the finish a smooth face rather than to build up height.

Polegate's older houses around the High Street and Church Road and the later homes spreading towards Willingdon can both reveal a base that is hard to cover once a refit starts. Three kinds of awkward base are worth knowing about.

Old quarry or ceramic tiles that are still firmly stuck down can stay where they are, once cleaned, degreased and primed. Breaking them out can damage the floor underneath, so keeping sound tiles can save both work and waste.

Suspended timber floors are the second. Latex never goes straight onto bare floorboards, because they flex and move with the seasons. The boards are overboarded with flooring grade plywood, fixed down firmly, and the latex is laid over the plywood.

The third is older concrete that has been patched, chased for pipes or left with glue after carpet or vinyl came up. Firm, thin residue can often be primed and covered. Soft or thick glue comes off first, as our Polegate concrete floor grinding page explains.

Damp, bouncy boards and slopes in Polegate floors

A thin layer of latex smooths a surface. It cannot cure damp, stiffen a springy floor or correct a room that is badly out of level, and laying it over any of those problems only hides them for a while.

Damp is checked first. A cold, solid floor in an older Polegate house with no membrane can draw moisture up, and latex over it can lift, blister or mark the new vinyl. If readings are high, the floor needs a membrane or a rebuild, and the sand and cement relaying service covers that route.

Boards that bounce underfoot need fixing or replacing before any overboarding, because movement will crack a thin layer however carefully it is mixed.

A floor that falls away by more than a few millimetres across a room needs something deeper. That may be a general levelling compound or a new screed, and the floor levelling page for Polegate sets out how to tell which.

Primer matters on every base. Tiles, plywood and concrete each take their own, and on a calcium sulphate screed the laitance is sanded off before its primer goes down.

Latex in Polegate flats and upstairs rooms

Flats make up 15% of Polegate's homes, and latex screed is one of the few floor products that is just as easy to lay on an upper floor as at ground level. There is no pump, lorry or hose to plan around. The powder and the latex liquid arrive in bags and containers, are carried up the stairs and are mixed in the room, so a first floor bathroom or a flat kitchen is no harder to reach than a downstairs hall.

Upstairs floors are often timber. Joists and boards are checked first, loose boards are screwed down, and the floor is overboarded with flooring grade plywood before any latex goes on. In a purpose-built block the base is more likely to be concrete or an older screed, which is cleaned, checked for hollow spots and primed to suit.

The short working life of a latex mix means rooms are done one at a time. The compound is poured, spread to the planned depth and spiked to let trapped air out, then left alone to set.

That is where latex earns its place in a home that is still being lived in. Because it goes down only a few millimetres thick, it is ready for flooring far sooner than a screed, which dries at about a day per millimetre. The exact times for walking on it and laying the covering come from the product's data sheet.

How we price latex screed in Polegate

A fixed written price within 24 hours, once we know the area and the base. See our floor levelling cost guide.

Who lays your latex screed in Polegate

Bright smooth liquid screed across a large room
Bright smooth liquid screed across a large room.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Latex screed from Slough to Polegate

On the map, Polegate sits south-east of Slough, about 62.5 miles from our base in a straight line (postcodes including BN26), next to Hailsham (3 miles), Eastbourne (4.1 miles), Seaford (7.2 miles) and Newhaven (8.9 miles).

More on latex screed, part of our screeding services. For every screed we lay locally, see floor screeding in Polegate.

FAQs

Latex screed in Polegate: your questions

Can latex screed go over floorboards in a Polegate house?

Not directly. Bare floorboards move, and that movement cracks a thin latex layer. The boards are checked and loose ones fixed, then the floor is overboarded with flooring grade plywood and the latex goes over that. If the joists are springy or the boards are rotten, those need sorting first, and on some ground floors a solid, insulated screed in place of the timber is the longer-lasting fix.

How thick is latex screed?

Usually only a few millimetres. Latex is made to smooth a surface that is already close to level, giving thin finishes such as sheet vinyl, lino or rubber a clean face to stick to. Where a Polegate floor needs more than that to come flat, a deeper compound or a new screed is the right material, and we say which before pricing.

What flooring needs a latex screed underneath?

Thin, flexible finishes show every bump in the base, so sheet vinyl, LVT, lino, rubber and safety flooring all benefit from one, and carpet tiles sit better on it too. Kitchens and bathrooms are the typical rooms, because their floors often hide old tiles or plywood. Three miles away, there is a Hailsham latex screed page too.

How long after latex screed can I lay vinyl or LVT?

It depends on the product, the depth and how warm the room is, and the manufacturer's data sheet gives the figure. Because latex goes down only a few millimetres thick, the wait is far shorter than for a new screed, which needs about a day per millimetre for its first 40mm. A cold Polegate bathroom or a thicker layer takes longer. We tell your fitter the time for the product we have used.