info@kandbscreeding.co.uk

Floor Levelling · Hertfordshire

Floor Levelling and Self Levelling Screed in Rickmansworth

Before LVT, vinyl, big format tiles or engineered boards go down in Rickmansworth, we flatten the base with self levelling compound. Here the work divides in two. At home it means old solid floors and the line where a house meets its extension. On Denham Way at Maple Cross, office refits in buildings such as The Rivers Office Park and Maple Cross House need a flat, primed base before the new finishes. Either way, we first check whether compound is enough or a new screed is needed.

Office and warehouse floors at Maple Cross

The area's designated business land is at Maple Cross, home to Skanska's UK headquarters, Maple Cross House and The Rivers Office Park. Strip an office floor back for a refit and the base is seldom as flat as new carpet tiles or LVT require. Old glue, patched trenches and uneven joints all telegraph through a thin finish.

On a sound base, levelling compound fixes this. Over a primed Maple Cross slab it runs out glassy and true, usually at a 2mm to 10mm depth, with a few products rated thicker. Each base gets its own primer, with concrete, sand and cement and calcium sulphate all treated differently. A weak or contaminated surface is ground back first, as described on our concrete floor grinding service page.

Warehouse floors at Trade City Maple Cross, approved for trade and warehouse units, are a different matter. Compound is not meant to be a wearing surface under forklifts or pallet trucks. A floor carrying that traffic is better served by a high strength screed.

Fit-out programmes at Maple Cross rarely have slack, because other trades are usually queued behind the floor. With fast drying compounds the flooring can follow quickly, sometimes the following day, depending on product and depth. Working hours and access are agreed with the building manager before we start, so our part slots in with the rest of the refit.

Rickmansworth homes: old floors and extension joins

At home, what people mostly need is a smooth base for a new floor finish. Some 19% of Rickmansworth homes went up between 1973 and 1999, and plenty of older ones have floors patched again and again over the years. LVT and sheet vinyl are thin enough to show every ridge and dip, and many of them require SR1, meaning no more than 3mm deviation under a 2m straightedge. SR2 permits 5mm and is fine for many tiled floors.

An extension brings its own snag. The new floor and the old one hardly ever end up at exactly the same height. Skimming compound over the join lets the flooring carry straight through without a lip.

We will be honest about where compound stops working. Ask it to fill a sunken or crumbling floor and a deep layer may crack and lift. Where the base is damp, loose or far off level, the real answer is a sand and cement screed for failed floors. For very thin smoothing work, there is our latex screed service.

How we price floor levelling in Rickmansworth

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Rickmansworth

Floor preparation with boards and screed hose before a pour
Floor preparation with boards and screed hose before a pour.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Rickmansworth

On the map, Rickmansworth sits north-east of Slough, about 10.6 miles from our base in a straight line (postcodes including WD3), next to Chorleywood (2.5 miles), Watford (3.4 miles), Bushey (4.5 miles) and Harrow (6.3 miles).

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Rickmansworth: your questions

How flat does a floor need to be for LVT?

LVT and sheet vinyl suppliers commonly insist on SR1: lay a 2m straightedge anywhere and the biggest gap underneath should be 3mm. A rougher floor can show through the finish or open up the joints. In a Rickmansworth house we run a straightedge over the floor first, and if the base is sound we bring it into line with compound.

Can you level an office floor at Maple Cross outside working hours?

Yes, hours can be agreed in advance with the building manager or fit-out contractor, and fast drying compounds keep the disruption brief. When you ask for a price, give us the floor area, what is down now and what flooring is going in, and the written quote will set out preparation, priming and drying time.

When does a floor need a new screed instead of levelling compound?

If the base is loose, cracked right through or damp, or so far out of level that compound would have to go well past about 10mm. Thick pours of compound over a failing floor tend to crack and lose their bond. A new screed is the fix that lasts in that situation, and we will say so if your floor needs one.

Free, no-obligation quote

A fixed price for your Rickmansworth floor