Getting the pump hose into a Rickmansworth home
The screed is mixed off site or at the kerb, then pumped down a hose onto the prepared floor. That means the pump and mixer need a place to stand, and the hose needs a clean route to the room with no kinks or tight bends. Ahead of the pour we want to know where the lorry can park, the distance to your door, whether the hose goes through the house or round the side, and what floor the room is on.
A semi with its own drive is normally straightforward. Terraces are 15% of Rickmansworth homes, and on those the hose usually has to come through the house, so we cover hall floors and door frames before it does. Flats are reachable too, because the pump can lift screed to upper storeys, but the run through a stairwell or shared lobby has to be cleared with the managing agent beforehand.
From Loudwater to Moneyhill to the town centre, tell us about yellow lines or permit bays when you ask for a quote. Getting a bay suspended, or starting early, can decide whether the pour goes smoothly or slips. How the kit is set up is explained on our screed pumping service page. Pump hire without our crew is not something we offer.
With the hose in place, a big open ground floor can be done in a morning, and that speed is why builders pick liquid screed for extensions.
Depth, flatness and drying in Croxley Green extensions
In a house, a floating liquid screed generally begins at around 35mm, sitting on insulation and a membrane. Because it finds its own level as it is poured, the cured floor is dense and flat, and hitting SR1 or SR2 regularity is realistic. Large tiles and LVT need exactly that, since they show any dip. Over heating pipes you need a minimum of 25mm on top, taking the whole build to about 45 to 50mm, and our underfloor heating screed page goes through it.
Your electrician and joiner can usually tread on it 24 to 48 hours later. Flooring, on the other hand, has to wait for a properly dry screed. A working rule is a day per millimetre for the first 40mm, slower after that, with a test before anything is laid. To weigh drying and cost against the traditional mix, read liquid versus sand and cement screed.
Two binder types are available for flowing floors: calcium sulphate, or cement. For a Croxley Green or Batchworth extension the right one depends on the rooms, any heating and the finish you want, and the quote spells that out. As a starting budget for a Croxley Green kitchen floor, MyJobQuote's August 2026 cost guide gives £24 to £31 per m². A few miles west, we also pour liquid screed in Chorleywood.
Liquid screed prices for Rickmansworth floors
Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, October 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our liquid screed cost per m² guide or screed calculator.
Who lays your liquid screed in Rickmansworth

K & B Screeding, led by director Donatas Bardisevicius. Founded 2019, company 12298780.
See what customers say in our Google reviews and on our testimonials page.
Liquid screed from Slough to Rickmansworth
On the map, Rickmansworth sits north-east of Slough, about 10.6 miles from our base in a straight line (postcodes including WD3), next to Chorleywood (2.5 miles), Watford (3.4 miles), Bushey (4.5 miles) and Harrow (6.3 miles).
If the truck mixer has to stand on the road in Rickmansworth, a suspension or dispensation can be requested from Three Rivers District Council (suspensions and dispensations); we will say on the quote if it is needed. An extension floor usually needs building regulations approval (Part L sets the insulation standard in England); the council building control service for Rickmansworth is Hertfordshire Building Control.
More on liquid screed, part of our floor screeding services. For every screed we lay locally, see floor screeding in Rickmansworth.
Further reading: screeding before LVT, tiles or carpet.