Liquid Screed · Wiltshire

Liquid Screed in Westbury

Pumped from a mixer parked outside, our liquid screed fills a Westbury extension or a whole ground floor in a day and takes foot traffic after 24 to 48 hours. It suits the town's newer housing well: 22% of homes were built between 2000 and 2014, and houses of that age usually already have insulated floors, so an added kitchen or garden room can match them with a thin, flat, self-levelling screed.

Why newer Westbury homes suit a pumped screed

A house built in the last twenty years has usually been designed with a modern floor build-up: insulation, a membrane and a relatively thin screed. Add a room onto a house like that and the extension floor must line up exactly with what is already there, a job pumped screed does neatly. Floated over insulation in a house, liquid screed can be as shallow as about 35mm, roughly half what a hand-laid floor would need. That saves height at door thresholds and keeps the step into the garden where the builder planned it.

Open-plan rooms are where it earns its place. The screed flows across the whole area, finds its own level and can reach SR1 or SR2 flatness readily, ready for tiles, LVT or engineered wood. It shrinks very little, so there are far fewer joints to plan around, and a large kitchen and dining space can be poured in one go.

Flats are 10% of Westbury's homes. Upstairs, a pumped screed is far simpler than carrying bags and mix up a staircase, because the hose does the work.

The pumped kind is made either with a calcium sulphate binder or with cement. Picking between them comes down to the room, what flooring goes on top and how likely the floor is to see water. If your drawings name a specific calcium sulphate grade, our anhydrite and flow screed page covers that specification in detail, and our screed thickness guide compares depths for each type.

Pump access on Westbury streets and driveways

Our pump and mixer are parked outdoors and the hose is fed in at the nearest door, or a window, to reach the room being screeded. On a modern estate with off-road parking, that usually means the drive. On streets without off-road parking, the pump may have to stand on the road for the few hours the pour takes, so it helps to know about parking restrictions or tight corners in advance.

A clear, protected route lets the hose snake along a hallway or up the stairs. Before we pour, the edge strip, membrane and taped joints are checked, and doorways are dammed so the screed stays in the right room.

People can normally walk on it 24 to 48 hours later. Floor coverings wait until the screed is dry to the covering maker's limit, which takes longer on a deeper floor. Our screed pumping service explains more about how the hose reaches difficult rooms. Our pump is never hired out on its own; it arrives with the K & B crew who run it. For work about 4 miles north, see liquid screed in Trowbridge.

Liquid Screed prices in Westbury

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Westbury

Large finished ground floor screed with garden doors
Large finished ground floor screed with garden doors.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Westbury

As the crow flies, our yard in Slough is about 69.1 miles from Westbury, which lies to the west-south-west. Postcodes here include BA13, and Warminster (3.9 miles), Trowbridge (4.2 miles), Frome (6.3 miles) and Melksham (8 miles) are close by.

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Westbury: your questions

Can liquid screed be laid on an upper floor in Westbury?

Yes, provided the floor structure was designed to carry it. We feed the hose up through the stairwell or in at a window and pour over the insulation or deck once it is prepared. Upper floors in flats and new houses often specify a liquid screed for this reason, because it avoids carrying heavy material by hand.

Does liquid screed crack?

Compared with a hand-laid mix it barely shrinks, which means fewer joints and less risk of shrinkage cracking. Cracks can still appear if the screed is laid too thin, dried too quickly with heat, or poured over a poorly prepared base. Correct depth, edge strip and a controlled drying period prevent most problems.

What depth of liquid screed does a Westbury extension need?

Floated on insulation in a house, about 35mm is the starting point. Where heating pipes run through it, keep a minimum of 25mm on top of them, which brings the screed to roughly 45 to 50mm overall. In a commercial building the minimum floating depth rises to about 40mm. Your plans tell us the exact figure for the Westbury job.