info@kandbscreeding.co.uk

Underfloor Heating Screed · London

Underfloor Heating Screed in Hounslow

When wet underfloor heating goes into a Hounslow floor, we bury the pipes completely in pumped or site-mixed screed and leave a written plan for warming it up. Hounslow's buildings range widely: newer apartment schemes in Brentford call for thin screeds over acoustic layers and heating, while in an older house a retrofitted heated floor must finish below the thresholds already there, where height is tight. Fitting the pipes is not our part: they should be down and through a pressure test by your heating engineer before we turn up.

Heated extensions in Hounslow semis

Semi-detached homes make up 29% of Hounslow's housing, and a heated rear extension or open-plan kitchen is a typical upgrade for houses like these. The pipes go down on insulation, clipped in place, and the screed buries them. Its job is to spread heat evenly, so it must surround every pipe with no air pockets and cover them deeply enough to carry the floor without cracking.

The cover depth depends on the screed. A pumped floor wants 25mm or more sitting above the pipes, which usually adds up to 45 to 50mm. With a hand-laid mix, around 45mm has to go over them, so the whole floor builds up thicker.

In an older house, that depth matters. Some 28% of Hounslow's housing went up between the wars, and retrofitting heating into one of those ground floors means digging out the old concrete. The new floor has to meet the door thresholds, stair and hallway, and liquid screed often fits the height available where sand and cement would not.

The insulation and edge strip underneath are part of the job. Gaps there show up later as cracks or cold spots, and our insulation and membranes service covers checking or supplying them. For access and pump set-up, see the Hounslow liquid screed page. Garden rooms and heated outbuildings follow the same rules on a smaller scale, and their floors are priced the same way.

Commissioning heated floors in Brentford apartments

In a flat, the heated screed sits on an acoustic layer as well as insulation, which adds to the build-up and to the need for tight edge strips. A thin, level liquid screed suits this, and the full depth has to be agreed against the building's finished floor level.

Once poured, the heating becomes part of drying. With calcium sulphate, low heat can normally start around day 7; a sand and cement floor has to sit for three weeks, 21 days, at the very least. After that the water temperature edges up a bit at a time, stays at working level for a while, then drops back before any covering goes down. Going too fast risks cracks.

Joints matter on larger floors. Where heating zones meet or across doorways, a joint lets each zone expand without cracking the next. We fix those positions with the heating engineer ahead of the pour.

Whoever runs the heating in your Brentford flat gets that warm-up programme from us on paper. For the drying picture in full, read how long screed takes to dry. Further east, see our Hammersmith and Fulham page for heated floors.

Underfloor Heating Screed prices in Hounslow

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our floor screeding cost guide or screed calculator.

Who lays your underfloor heating screed in Hounslow

Underfloor heating loops laid in a glazed room before the screed
Underfloor heating loops laid in a glazed room before the screed.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor Heating Screed from Slough to Hounslow

Hounslow is about 13.3 miles east-south-east of our Slough base as the crow flies, with postcodes including TW8, W4, TW14 and TW13. The nearest towns to it are Richmond upon Thames (2.5 miles), Ealing (3.5 miles), Sunbury-on-Thames (4.7 miles) and Ashford (5.5 miles).

More on underfloor heating screed, part of our screeding services.

FAQs

Underfloor Heating Screed in Hounslow: your questions

Can underfloor heating go into an old Hounslow house floor?

It can, provided there is room once the old concrete is out. Everything, from the insulation up through the pipes to the screed, must finish below the door thresholds you already have. Liquid screed needs a layer of about 45 to 50mm over the insulation, which suits tight retrofits. Measure the finished level before digging and share it with us.

How soon can the heating go on after screeding?

For calcium sulphate screed, gentle heat can usually start from about 7 days. A sand and cement floor needs a minimum of three weeks, 21 days, first. The temperature is then raised slowly in stages and held before flooring. A rushed start is a common cause of cracking, so follow the written schedule.

How much is underfloor heating screed per m² in Hounslow?

Whether it goes into a Brentford flat or a Feltham house, pumped screed over heating pipes costs £20 to £35 a square metre on 2026 UK pricing. The range reflects floor size, depth and access. On a flat, hose length and stairs come into it too. Within 24 hours your figure arrives on paper, and once you agree it, it stays put.

Nearby

Underfloor Heating Screed near Hounslow

Free, no-obligation quote

A fixed price for your Hounslow floor