info@kandbscreeding.co.uk

Floor Levelling · West Sussex

Floor Levelling and Self Levelling Screed in Bognor Regis

Before LVT, vinyl, large tiles or engineered wood go down in Bognor Regis, we pour self levelling compound to give them a flat base. Refurbishment drives much of it: the Butlin's resort, with its hotel accommodation on a 39 acre site, and the University of Chichester campus are two of the town's larger non-residential sites, and refits on sites like these depend on flat floors. At home, the same work fixes uneven old floors and joins between extensions and original rooms.

Refit floors at Butlin's and the University of Chichester

When a hotel room, corridor or teaching space is refitted, the floor underneath is often the surprise. Old carpet, vinyl or tiles come up to reveal patches, ridges, old adhesive and areas of different material. Thin flooring will show all of it, so the base has to be brought flat first.

Self levelling compound is poured and spread across the prepared floor, flowing into low spots and drying to a smooth, flat surface. A typical layer is somewhere between about 2mm and 10mm, with some products able to go thicker. Fast drying products keep the programme moving, which helps when rooms have to go back into use quickly.

Flatness is measured against BS 8204. Its SR1 class, the one many thin sheet floors require, permits a gap of 3mm at most under a 2m straightedge. SR2 allows 5mm. Hotel bedrooms and teaching rooms with LVT or sheet vinyl normally need SR1.

Preparation decides whether the compound stays put. Loose material, old adhesive and contamination have to come off, often by grinding, and the right primer has to go on for the base, whether that is concrete, sand and cement or calcium sulphate. That stripping and priming is handled by our floor preparation team. Large refurbishment projects with new screeds as well as levelling come under commercial screeding work. Work on occupied sites can be phased room by room.

Old floors and extension joins in Bognor Regis homes

At home, there are two problems compound usually fixes. The first is an old solid floor that is sound but uneven, with dips, patched areas or a slope from one side of the room to the other. The second is the line where an extension meets the original house, where a small step or slope shows up as soon as a single run of flooring crosses it.

Compound handles both, within limits. Beyond about 10mm of difference, or on a floor that is loose, damp or cracked, compound will not do the job. Poured thick over a floor that really wants a screed, it can crack and come away. In that case a new sand and cement screed over the problem area is the honest recommendation, and we will say so.

Where an inter-war floor has no damp proof membrane, levelling compound will not solve damp coming up from below. That floor needs rebuilding. For the same service in the next town east, see floor levelling in Littlehampton. Timber floor sanding and DIY product sales are outside what we offer.

How we price floor levelling in Bognor Regis

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Bognor Regis

Room prepared with blue edge strip and membrane ready for screed
Room prepared with blue edge strip and membrane ready for screed.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Bognor Regis

On the map, Bognor Regis sits south of Slough, about 51.7 miles from our base in a straight line (postcodes including PO21 and PO22), next to Littlehampton (6 miles), Chichester (6 miles), Selsey (6.4 miles) and Emsworth (12.5 miles).

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Bognor Regis: your questions

Does a new floor need levelling before LVT goes down?

Often, yes. LVT and thin vinyl follow every bump in the base, so most manufacturers ask for SR1, no more than 3mm under a 2m straightedge. A new screed may meet that already. An older floor or a join with an extension usually needs a skim of compound. A straightedge check on the floor comes before any quote.

Can levelling compound go over an old quarry tiled floor?

Sometimes. Tiles that are stuck down firmly, clean and free of sealer or polish can take a primer and compound on top. Loose or hollow tiles have to come up first, and a damp floor needs its moisture problem solved. We assess the surface on site and choose the primer to suit it.

How quickly can a levelled floor be walked on?

That varies with the product, the thickness and the room conditions, and a deeper layer needs longer. Fast drying compounds exist so a refit is not held up. On a refit, we pick a product that fits your dates, follow its data sheet and tell you the earliest time foot traffic and flooring can follow.

Free, no-obligation quote

A fixed price for your Bognor Regis floor