Sand and Cement Screed · West Sussex

Sand and Cement Screeding in Bognor Regis

In Bognor Regis we mix sand and cement screed on site and compact it by hand, the traditional way. It suits the town's older homes in particular: 10% of houses were built before 1919 and 19% between the wars, and an inter-war floor may lack a damp proof membrane. Rebuild a floor like that and the last layer, over fresh insulation and a new membrane, is normally a hand-laid screed.

Rebuilding old solid floors in Bognor Regis houses

An old solid floor that has cracked, sunk or let damp through cannot simply be screeded over. It has to come out. The sequence is to break up the existing floor, dig down far enough for the new build-up, consolidate the ground, lay a slab, then a damp proof membrane lapped up to meet the wall's damp course, then insulation, and finally the screed.

The screed fixes the finished height, and in an older house that height is tied to doorways, stairs, the hearth and the floors next door. Sand and cement is mixed in small batches on site and placed by hand, so its depth can be adjusted across a room to meet each of those points. It is then compacted and finished with a float or power float to a dense, level surface.

Floated over insulation, a house floor is laid 65mm deep and a commercial one 75mm. Expect it to take longer to dry than liquid screed, at about a day per mm over the first 40mm and more for each mm after. Plan the flooring date with that in mind, and read our guide on screed drying times before you book the fitter.

Where the slab is sound and only a thin new surface is needed, the bonded option described below may suit instead. For a cracked but otherwise sound base, our screed repairs service can be the cheaper first step.

Wet rooms and garages in Bognor Regis homes

Sand and cement is the default wherever water is involved. It is not weakened by moisture the way a calcium sulphate screed is, and it can be hand-shaped to falls, so it is the usual base for a level-access shower or a wet room. The drain position and finished levels are agreed first, the screed is laid to fall towards the outlet, and the tanking goes on top once it has dried.

Converting a garage is another. Insulation and a membrane go in to lift the floor to match the rest of the house, and a hand-laid screed finishes it in a single visit. Each layer is shown in our guide to garage conversion floors.

If there is little height to play with and the slab below is sound, we can bond a 25 to 40mm screed straight onto it using a bonding agent. Published 2026 figures put that at £12 to £18 per m² (trade2base, June 2026), while a standard sand and cement floor is £18 to £25 per m². The mix can also be made with rapid drying additives where time matters. For homes a short way west, see sand and cement screed in Chichester.

Sand and Cement Screed prices in Bognor Regis

Sand and cement screed: £18 to £25 per m² supplied and laid (MyJobQuote, August 2026), so £450 to £630 for 25 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your sand and cement screed in Bognor Regis

Bright finished floor screed in a domestic room ready for flooring
Bright finished floor screed in a domestic room ready for flooring.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Sand and Cement Screed from Slough to Bognor Regis

On the map, Bognor Regis sits south of Slough, about 51.7 miles from our base in a straight line (postcodes including PO21 and PO22), next to Littlehampton (6 miles), Chichester (6 miles), Selsey (6.4 miles) and Emsworth (12.5 miles).

More on sand & cement screed, part of our screeding services.

FAQs

Sand and Cement Screed in Bognor Regis: your questions

How thick should a sand and cement screed be?

A floating screed on insulation is 65mm in a house, rising to 75mm in commercial work. A bonded screed, stuck to a sound slab, can come down to 25 to 40mm. With heating pipes in the floor, allow about 45mm of screed over them. In a Bognor Regis renovation the existing door and floor levels usually decide which build-up fits.

Can I lay sand and cement screed myself?

A capable DIYer can manage a small patch, but a whole floor is much harder. You have to get the mix consistency right, compact every part of it and float the full room flat in one session. Miss the compaction and the screed can break up or crack under the new floor. Getting a fixed price costs nothing and arrives within 24 hours.

Does a screed go over or under the damp proof membrane?

Over it. The membrane goes on the slab or below the insulation, depending on the design, and the screed is laid on top. In an old house the membrane must be lapped up the walls and joined to the damp course so moisture cannot bypass it at the edges.