info@kandbscreeding.co.uk

Underfloor Heating Screed · West Sussex

Underfloor Heating Screed in Bognor Regis

We screed over wet underfloor heating in Bognor Regis homes, with liquid or sand and cement chosen to suit the floor. Most Bognor Regis homes are post-war: 31% went up between 1945 and 1972 and another 26% between 1973 and 1999. A heated extension or garden room added to a house of those ages usually has to meet an existing floor level. We don't fit pipes; once your heating engineer has, we screed over them at the correct depth.

Screed depth over heating pipes in Bognor Regis

How well a heated floor works comes down to the screed over the pipes. The screed spreads heat evenly across the room, protects the pipes from load and gives the flooring a flat base. Get the cover wrong and the floor either cracks over the pipes or takes too long to warm up.

Each screed type needs a different cover. With liquid it is 25mm minimum above the pipes, which usually adds up to a 45 to 50mm floor. Sand and cement takes about 45mm above them, making the whole floor thicker. Liquid also flows around each loop with no air gaps, which helps heat transfer and makes the room quicker to warm.

That difference matters when an extension on a post-war or 1980s house has to finish level with the existing floor. Where depth is limited, a liquid screed over the pipes is often the only way to fit insulation, pipes and screed under the existing floor level. Where there is room, and particularly in a smaller room with lots of corners, sand and cement can still be the sensible choice.

We inspect the insulation, membrane and perimeter edge strip before we price, and can provide any that are missing. Fixing the pipes down and pressure testing them is your heating engineer's job and has to be finished before our visit, since we do not install underfloor heating. Our screed thickness guide sets out all of the build-ups.

Heating up a new screed in a Bognor Regis home

The first heat-up should never be rushed, because heating a new screed too quickly can crack it. Bring it up to temperature slowly.

On calcium sulphate the system can normally go on from about 7 days after the pour. Sand and cement needs a minimum of 21 days. Either way, the water starts cool and climbs a few degrees at a time across several days, then stays steady until the flooring is laid. Your heating engineer gets the schedule from us in writing.

Garden rooms are a common case for underfloor heating, because a heated floor leaves the walls free. The same rules apply: insulation below, the right pipe cover, and a gradual first heat.

If the floor is going to be tiled, the screed must also be dry enough for the adhesive, and heating can help with that once commissioning is complete. For insulation boards, membranes and edge strip supplied as part of the job, see our insulation and membranes service. Projects in Worthing are covered on our Worthing heated floor screed page.

Underfloor Heating Screed prices in Bognor Regis

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our floor screeding cost guide or screed calculator.

Who lays your underfloor heating screed in Bognor Regis

Underfloor heating pipework across a large room before screeding
Underfloor heating pipework across a large room before screeding.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor Heating Screed from Slough to Bognor Regis

On the map, Bognor Regis sits south of Slough, about 51.7 miles from our base in a straight line (postcodes including PO21 and PO22), next to Littlehampton (6 miles), Chichester (6 miles), Selsey (6.4 miles) and Emsworth (12.5 miles).

More on underfloor heating screed, part of our screeding services.

FAQs

Underfloor Heating Screed in Bognor Regis: your questions

Which screed is better over underfloor heating in a Bognor Regis extension?

Liquid screed is usually preferred over heating pipes because it encapsulates them fully and needs less depth, so the room warms faster. Sand and cement still works well where there is depth to spare or the room is small. The finished level of your existing floor normally decides it, and we check that before quoting.

Can underfloor heating go into a garden room floor?

It can, as long as the floor beneath is built for it. The floor needs insulation beneath the pipes so heat goes up rather than into the ground, then the correct screed cover over the pipes. We lay the screed once your heating engineer has fitted and tested the pipework, and we give you the heat-up schedule to follow.

How long after screeding before the floor can be tiled?

It depends on depth and screed type, and the heating helps. After the system has been commissioned, running it helps drive more moisture out. The screed should then be tested before tiling. With calcium sulphate the laitance must also be removed first, so the adhesive bonds to the screed itself.

Nearby

Underfloor Heating Screed near Bognor Regis

Free, no-obligation quote

A fixed price for your Bognor Regis floor