info@kandbscreeding.co.uk

Liquid Screed · Suffolk

Liquid Screed Contractors in Bury St Edmunds

We pump liquid screed into extensions, garage conversions, open-plan kitchens and new build floors in Bury St Edmunds. Out of the hose it spreads and finds its own level, the whole floor goes in on one visit, and after 24 to 48 hours it will usually take your weight. For a house, the practical question is often where the pump can stand, because the hose has to reach the room from the street or a driveway.

Where pumped liquid screed suits Bury St Edmunds floors

A pump pays its way when the floor is broad and open, with few walls breaking it up. In Bury St Edmunds that usually means a rear extension or a garage conversion on a post-war or late 20th century house, such as the semis and terraces on the Moreton Hall estate, where a kitchen is being opened into a new room at the back.

Newer houses are the other obvious fit. A quarter of the town's homes were built since 2000 (25%), and many recent designs expect a flowing screed over insulation. Because the material finds its own level, it gives a flatter surface than hand-laid screed, and a surface regularity of SR1 or SR2 is readily achievable. That matters under large format tiles and click flooring, which show every dip.

Depth is lower than traditional screed. In a Bury St Edmunds house, a floating liquid floor over insulation starts at around 35mm where sand and cement needs 65mm, and that is what lets a new back room on Moreton Hall meet the kitchen without a step. Heating pipes push the figure up, as each needs a minimum 25mm of screed over it, so the floor finishes about 45 to 50mm thick.

Some liquid screeds use calcium sulphate as the binder, others cement. Both pump and level the same way, and we choose between them by the room: cement based products suit areas that may get wet. For a side by side comparison with hand-laid screed, see liquid versus sand and cement compared.

Getting the pump to a Bury St Edmunds room

The mixer lorry and the pump need a parking spot near enough that the hose reaches the room. If the house has a drive, that is the easy answer. Where the only space is the street, we need to know about parking bays, restrictions or a narrow shared passage when you ask for a price, and a parking suspension may be needed on the day. Our screed pumping service has more on pump set-up and hose runs.

Flats are a common case: one Bury St Edmunds home in five is a flat, and the hose can be run up a stairwell to an upper floor as long as the route is clear.

Have the room ready before the lorry turns up. That means walls plastered, windows and doors fitted, edge strip and membrane in place and the floor free of debris. For a day or two after the pour the room stays shut up; after that, open the windows. Thickness drives the wait: up to 40mm, allow roughly one day per millimetre, and past that each millimetre takes longer, which is why a deep floor in a new extension keeps the flooring fitter waiting. How screed drying is tested sets out the checks.

Liquid Screed prices in Bury St Edmunds

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your liquid screed in Bury St Edmunds

Finished screed with the edge membrane trimmed ready for flooring
Finished screed with the edge membrane trimmed ready for flooring.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid Screed from Slough to Bury St Edmunds

On the map, Bury St Edmunds sits north-east of Slough, about 76.3 miles from our base in a straight line (postcodes including IP33), next to Newmarket (13.1 miles), Sudbury (14.3 miles), Haverhill (16.3 miles) and Soham (17 miles).

More on liquid screed, part of our screeding services.

FAQs

Liquid Screed in Bury St Edmunds: your questions

How thick should liquid screed be in a Bury St Edmunds extension?

Floated over insulation in a Bury St Edmunds extension, our liquid screed goes down from about 35mm. Wet heating changes that, since 25mm is the least cover allowed over the pipes, so expect 45 to 50mm overall. The final depth also depends on the level of the existing house floor, which the new one normally has to meet.

Can I walk on liquid screed the next day?

Usually yes, with care. Liquid screed is normally walkable within 24 to 48 hours, which lets other trades move through the room. It is not dry at that point, and floor finishes must wait until moisture tests pass. On a Bury St Edmunds extension, keep heavy loads, ladders and tool storage off the new floor for the first week.

Is liquid screed a good choice for a garage conversion?

Often, yes. A converted garage usually needs insulation added over the old slab, and liquid screed at about 35mm keeps the build-up thin so the new floor can meet the house. It also levels well for new flooring. Where the garage floor is damp or cracked, that needs sorting first, and our garage conversion screed guide explains the build-up.

Nearby

Liquid Screed near Bury St Edmunds

Free, no-obligation quote

A fixed price for your Bury St Edmunds floor