In Chippenham's older houses we mix sand and cement on site, then barrow, compact and float it by hand to a level floor. Terraces close to the town centre often have tired concrete floors and no damp proof membrane. Those floors are usually dug out and rebuilt, and a hand-laid screed suits the small rooms and tight access that come with them.

Relaying failed floors in older Chippenham terraces

Homes built before 1919 account for 10% of Chippenham's stock, with another 11% from between the wars. Older terraces near the town centre often have tired concrete floors and no damp proof membrane underneath them. Patching rarely lasts on floors like that, so the usual fix is a rebuild from the ground up.

That means breaking out the old slab, laying a new base, then a damp proof membrane and insulation, and finally the screed. A floating sand and cement screed in a house is laid at 65mm over insulation, which gives it enough body to resist cracking. Commercial floors go to 75mm. Where the screed sits directly on a sound concrete base instead, it can be bonded at 25 to 40mm, which saves height in a room with fixed door and skirting levels.

Hand-laid screed copes well with the conditions in these houses. Rooms are small, hallways narrow and the work often has to come through the front door from the street. We mix in batches outside, barrow it in and compact and float it room by room.

Get the damp proof layer wrong and a new screed will not save the floor. If you are unsure what is under the floor, our insulation and membranes service covers the layers below. If the damage is confined to one patch, repairing just the failed area can be enough.

Wet rooms, garages and drying times in Chippenham

Rooms that will see water need a cement screed. Calcium sulphate loses strength if it stays wet for long, which rules it out under a walk-in shower, in a wet room or on a utility floor. Laying by hand also lets us build in a gentle fall to the drain, something a self-levelling pour cannot give you.

Garage conversions are another common fit. Garages usually sit a step down from the house, and that drop is filled with insulation plus screed until the converted room meets the hallway. Our garage conversion floor guide shows each layer, from the old slab up to finished level.

The trade-off is drying. A 65mm sand and cement floor takes considerably longer to dry than a thinner liquid screed, and longer again in cold or damp weather. If the kitchen fitter is already booked and time is short, a faster drying screed mix brings that wait down.

If the house is being extended at the back at the same time, the larger, open floor in the new part may suit liquid screed for the extension, with sand and cement kept for the older rooms.

Sand and Cement Screed prices in Chippenham

Sand and cement screed: £18 to £25 per m² supplied and laid (MyJobQuote, August 2026), so £450 to £630 for 25 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your sand and cement screed in Chippenham

Wide bright room with a newly finished floor screed
Wide bright room with a newly finished floor screed.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Sand and Cement Screed from Slough to Chippenham

On the map, Chippenham sits west of Slough, about 63.6 miles from our base in a straight line (postcodes including SN15), next to Corsham (3.5 miles), Calne (4.9 miles), Melksham (6 miles) and Devizes (9 miles).

More on sand & cement screed, part of our screeding services.

FAQs

Sand and Cement Screed in Chippenham: your questions

Is sand and cement screed as strong as concrete for a Chippenham garage?

Screed does a different job from concrete: it gives a flat top rather than holding up the structure. It sits on a concrete base or over insulation and gives a flat, durable surface for the finish. For a garage that will be used as a room, a standard screed is enough. If it will take vehicles or heavy loads, a higher strength or fibre reinforced mix is used instead.

How long before flooring can go on a sand and cement screed?

Longer than most people expect. Thickness drives the wait, and a 65mm floor in an old Chippenham terrace will take weeks to dry, more in winter. Do not trust how it looks or how many weeks have passed; a hygrometer reading should confirm it is dry before you tile, lay wood or fit vinyl. Adding a quick drying additive to the mix brings that time down.

Can I lay sand and cement screed myself in a small Chippenham room?

On a tiny floor you can, but the mix ratio, the compaction and the final level all take practice, and screed that is not packed hard enough tends to break up or crack once tiles are on it. We price small rooms as readily as large floors, and the figure is written and fixed before any work starts, so you can compare it properly.