info@kandbscreeding.co.uk

Sand and Cement Screed · Somerset

Sand and Cement Screeding in Bath

In Bath, we mix sand and cement where the work is, batch it for each room and lay it by hand. It is the practical choice for small rooms in terraced houses, for wet rooms and showers laid to falls, and for replacing a failed solid ground floor where consent allows. In Bath's older houses, original floors were often laid without a damp proof membrane, so rebuilding one properly means excavation, insulation, a membrane and a new screed.

Replacing failed solid floors in Bath's terraces

Terraced houses make up 33% of Bath's homes, more than any other single type. Much of the city's older housing is Georgian or Victorian, and those ground floors were often laid directly on the ground or on a thin base with nothing to stop damp. After a century or more, those floors can crack, sink or turn powdery, and coverings laid on them fail.

When the building is not listed, or consent has been given, the old floor is broken out and removed, the ground made good, and a membrane and insulation laid before a new screed. A floating sand and cement screed in a home is laid at about 65mm, and the whole build-up must fit under thresholds and against old skirtings, which takes careful measuring. We put that layer in as well, under insulation and membranes.

Homes from 1919 to 1944, 10% of the stock, can also have older solid floors, and the same rebuild applies when one is beyond repair.

For these houses, a hand-mixed screed works because small batches can be carried through the hall and placed one room at a time. No pump has to park on a narrow street. Drying is slower than with liquid: allow about 40 days to get through 40mm, longer if it is thicker, and book the floor fitter with that in mind. If dates are tight, a fast drying screed mix cuts that wait down.

Wet rooms and bonded toppings in Bath homes

A wet room or level-access shower needs a floor that falls gently to the drain. Those falls are trowelled in sand and cement, a material that puts up with water where calcium sulphate cannot. That makes it the usual base under tanking and tiles in a Bath bathroom or shower room.

Garages and outbuildings are another use. A garage conversion normally means lifting the old, lower slab until it is level with the hallway, with insulation and a membrane under the new screed. Read garage screed depths explained for the numbers.

If the concrete is sound and simply needs a fresh surface, a bonded screed between 25 and 40mm thick is stuck straight to it once the slab is prepared. It is thinner than a floating screed, which can help where height is limited, but it depends completely on the bond, so preparation matters.

Cement screed also takes load sooner than some alternatives, which helps when a kitchen or workshop needs to be back in use quickly. Fibres can be added to the mix to reduce cracking in larger rooms or garages, at a small extra cost per square metre. A fibre reinforced screed is worth considering for a converted garage that will carry heavy furniture or gym equipment.

Sand and Cement Screed prices in Bath

Sand and cement screed: £18 to £25 per m² supplied and laid (MyJobQuote, August 2026), so £450 to £630 for 25 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your sand and cement screed in Bath

Power float working a sand and cement screed in a residential room
Power float working a sand and cement screed in a residential room.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Sand and Cement Screed from Slough to Bath

As the crow flies, our yard in Slough is about 74.7 miles from Bath, which lies to the west. Postcodes here include BA2 and BA1, and Trowbridge (7.9 miles), Corsham (8.3 miles), Melksham (9.6 miles) and Frome (10.6 miles) are close by.

More on sand & cement screed, part of our screeding services.

FAQs

Sand and Cement Screed in Bath: your questions

How long does sand and cement screed take to dry?

A 40mm thickness needs something like 40 days, and the drying slows down after that. So at 65mm, a floating screed in a Bath house keeps moisture-sensitive coverings waiting for many weeks. Warmth and ventilation help. We test with a hygrometer before finishes go down, and a fast drying mix is available where time matters.

Is traditional screed suitable for a Bath basement or cellar room?

Below ground, cement screed is normally picked because damp troubles it far less than calcium sulphate. The key is what goes underneath: the damp protection or tanking must be designed first, and the screed laid over it. We can lay the screed once that system is agreed, and advise on depth and falls.

What does sand and cement screeding cost in Bath?

In 2026, published UK prices give £18 to £25 a square metre for sand and cement screed and £12 to £18 (trade2base, June 2026) a square metre for a bonded one. Digging out an old floor, access on steep streets and insulation all add to that. We give one fixed written price covering the whole job.

Nearby

Sand and Cement Screed near Bath

Free, no-obligation quote

A fixed price for your Bath floor