info@kandbscreeding.co.uk

Floor Levelling · Suffolk

Self Levelling Screed and Floor Levelling in Haverhill

We level floors in Haverhill with self levelling compound, giving LVT, vinyl, large tiles and engineered wood the smooth, flat base they need. Many floors in the town have settled or been patched over the years, and a thin, well primed layer of compound, usually about 2mm to 10mm, is often all they need. When a floor has moved further than that, or is breaking up, we say so and price a new screed instead.

Levelling settled and patched floors in Haverhill homes

Haverhill grew mostly after the war. Homes from 1945 to 1972 make up 30% of the stock, and estates from the 1950s onwards surround the centre. Floors of that age have often settled slightly, been cut for pipes or cables, or been patched after an old kitchen came out. The result is a surface that looks fine under carpet but shows every hollow under LVT or large tiles.

Preparation comes first. Loose material, old adhesive and weak patches are removed, and cracks and holes are filled. The right primer then goes on for what the floor is made of: cement screed, calcium sulphate, concrete or an existing sound floor. After that, compound is poured and worked out to the depth each part of the floor needs.

We work to a BS 8204 flatness class. Lay a 2m straightedge on the floor and SR1 allows a 3mm gap beneath it, SR2 5mm and SR3 10mm. Thin sheet flooring often insists on SR1.

The join between a house and its new kitchen extension is another common place for compound. The new screed and the old floor may differ by a few millimetres at the doorway, and a skim across both gives one continuous level.

If most of a floor would need over about 10mm, we would not pour compound, because thick layers tend to crack and lose their bond; a new hand-laid screed is what lasts in that case.

Refit floors in Haverhill's industrial area and research park

Industry dominates Haverhill's economy, and the town has a large industrial area on the south side. Offices, stores and welfare areas in those buildings get refitted when tenants change, and the floor usually needs attention before new vinyl or carpet tiles go down. The research park, where The EpiCentre stands beside the bypass, adds office and conference space of the same kind.

Levelling here is about a predictable result on a tight programme. Fast drying compounds keep the refit moving, and the product sheet sets when the new finish can go down.

Process and laboratory floors are a different matter. They need flatness, strength and chemical resistance planned in from the start, and the chemical resistant finish itself is specialist work that sits on top. We do not lay resin, but we can provide a sound, flat screed or levelled base for it. For removing old coatings first, see concrete floor grinding.

If you are working across the area, the same service is covered for floor levelling in Saffron Walden.

How we price floor levelling in Haverhill

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Haverhill

Fresh floor screed laid against a blue perimeter edge strip in a new build
Fresh floor screed laid against a blue perimeter edge strip in a new build.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Haverhill

On the map, Haverhill sits north-east of Slough, about 60 miles from our base in a straight line (postcodes including CB9), next to Saffron Walden (9.3 miles), Newmarket (11.2 miles), Halstead (12.7 miles) and Sudbury (12.9 miles).

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Haverhill: your questions

How much levelling compound does an uneven floor need?

A typical layer runs from roughly 2mm to 10mm, though some compounds are rated for more. The depth is set by the worst dip in the floor and the flatness the new finish requires. A Haverhill floor that has settled only slightly may need a thin skim; one that needs far more is usually better with a new screed.

Can you level over old floor tiles?

Sometimes. Tiles that are clean, sound and stuck fast can take certain compounds, provided the correct primer goes on first. Loose, hollow or cracked tiles must come up first, because the compound will only be as stable as what is under it. We check the floor before pricing and say whether it needs stripping.

What flatness does engineered wood need?

Engineered wood is more forgiving than LVT or vinyl, but most makers still want the floor within SR2, about 5mm under a 2m straightedge, and many prefer better. Humps matter as much as dips, since the boards rock over them. In older Haverhill rooms, a thin coat of compound often brings the floor within tolerance.

Free, no-obligation quote

A fixed price for your Haverhill floor