info@kandbscreeding.co.uk

Liquid Screed · London

Liquid Screed in Richmond upon Thames

We pump liquid screed into homes across Richmond upon Thames, for large extensions, open plan kitchens and heated ground floors. Here the deciding factor is the inter-war semi: these houses take big rear extensions, and the new floor has to line up precisely with the old. Semi-detached houses make up 25% of the borough's homes, and a self-levelling screed suits the wide floors they create, walkable within 24 to 48 hours.

Pumped screed for big Richmond upon Thames extensions

A large rear extension on a semi turns the back of the house into one broad room, often kitchen, dining and living space in one. That is the floor liquid screed is made for. A hose carries it from the mixer into the room, it fills the whole extension in one go, and because it barely shrinks it settles flat with hardly any joints.

Wherever the house is in the borough, the screed must finish exactly at the level of the existing floor, or a step or ramp appears at the old back wall. Depth is set before the pour with levelling tripods across the room, and the screed is worked with a dipping bar so it reaches SR1 or SR2 readily. Laid against a 2m straightedge, SR1 shows a gap of 3mm at most and SR2 a gap of up to 5mm.

In a house the floating layer begins at roughly 35mm, rising to around 40mm for a commercial floor. Heated extensions need a minimum of 25mm over the pipework, so the total comes to something like 45 to 50mm. Some pumped screeds use a calcium sulphate binder and some use cement; how the calcium sulphate type is specified is covered under anhydrite grades and finishing.

Normally the new kitchen can be walked on a day or two later, 24 to 48 hours from the pour. Stone or timber has to wait much longer: each of the first 40 millimetres takes about a day to dry, and deeper layers slow down further. Ways to help it along are in our article on screed drying times.

Getting the pump to the room in Kew and Teddington

Only 8% of homes in Richmond upon Thames were built after 2000, so most liquid screed goes into an existing house, not an open site. We set the pump up on the street or on your drive, then lead the hose through the hall or down the side of the house to the new room. The hose can cover a long distance, so the lorry does not need to reach the garden.

Whether you are in Kew, Teddington or elsewhere, if your street has resident parking, tell us when you ask for a price, so a bay suspension or an early start can be planned. Protection goes down along the hose route through the house.

Inside, the base must be sealed: a taped membrane over the insulation, edge strip round every wall and dams across doorways, or the fluid escapes. Where the job is a small room, a wet room or a floor broken up by steps, hand laid sand and cement screed may suit better. For a side by side view of cost, speed and depth, read liquid screed or sand and cement.

Staying at home during a Richmond liquid screed pour

With so few new homes in the borough, a liquid screed in Richmond upon Thames usually goes into a house that someone is living in, whether in Whitton, Hampton, Ham or East Sheen. A little planning keeps the rest of the house usable while the new floor goes down.

The pour itself is quick. On the day the hose route is protected, the pump runs from the street or the drive, and a large extension floor is placed in a matter of hours. The mixing all happens outside, so there is no sand pile or mixer in the house. After the pour, the room has to be left alone until it can be walked on, with doors shut and children and pets kept out.

Once it can take light foot traffic, the room can be used carefully long before it is ready for flooring. Stacked boxes, dust sheets or boards left on the new screed hold moisture in and slow drying unevenly, so keep the surface clear, and open windows when the weather allows.

If the extension holds the only kitchen, plan where you will cook for the first few days. A temporary set-up in the dining room or utility usually does the job. If a builder and other trades are still working in the house, agree with them that the new floor stays off limits until it can take foot traffic, and that nothing is stored on it afterwards.

Liquid screed prices in Richmond upon Thames

Liquid screed: £24 to £31 per m² supplied and laid (MyJobQuote, August 2026), so £960 to £1,240 for 40 m². MyJobQuote does not say whether these figures include VAT. See our liquid screed cost per m² guide or screed calculator.

Who lays your liquid screed in Richmond upon Thames

Finished floor screed in a residential extension
Finished floor screed in a residential extension.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Liquid screed from Slough to Richmond upon Thames

Richmond upon Thames is about 15.6 miles east-south-east of our Slough base as the crow flies, with postcodes including SW13, SW14, TW10 and TW12. The nearest towns to it are Hounslow (2.5 miles), Kingston upon Thames (4 miles), Ealing (4.9 miles) and Sunbury-on-Thames (5 miles).

If the truck mixer has to stand on the road in Richmond upon Thames, a bay suspension can be requested from Richmond Council (parking suspension); we will say on the quote if it is needed. The council building control service for Richmond upon Thames is Richmond Council Building Control. A new extension floor usually needs building regulations approval, and Part L covers its insulation in England.

More on liquid screed, part of our screeding services. For every screed we lay locally, see floor screeding in Richmond upon Thames.

FAQs

Liquid screed in Richmond upon Thames: your questions

Is liquid screed better than sand and cement for a Richmond extension?

For a large, open extension floor, often yes: it is pumped in a day, comes out flat and covers heating pipes with less depth. A compact room, a shower floor that has to slope to a drain, or a floor that must carry weight early on is often better done in sand and cement. The choice depends on the room, not a rule.

How much does liquid screed cost per square metre?

The 2026 national rate for a pumped floor is £24 to £31 a square metre, and laid over underfloor heating the band is £20 to £35 a square metre. A small area costs more per m² because the pump and mixer cost the same to bring. Send the details for your Richmond upon Thames floor and the fixed price comes back in writing inside 24 hours.

Can liquid screed be laid in winter?

Yes, provided the windows and doors are in and the room stays above freezing while we pour and for some days afterwards. Cold, damp air slows drying, so a winter pour needs longer before flooring. Heating can speed calcium sulphate screed from about 7 days once it is commissioned gently.

Can liquid screed be poured in a flat in a converted Richmond house?

Often, yes. The pump stays at the kerb and the hose runs up the stairs and through the hall, with the route protected first. Floors in converted houses vary, so the base is checked before pricing. Where the floor is timber, a structural check comes first, because a full-depth screed adds a lot of weight to the joists. A sealed membrane, edge strip and doorway dams then stop any leak into the flat below.

Free, no-obligation quote

A fixed price for your Richmond upon Thames floor