Underfloor Heating Screed · Hampshire

Screed for Underfloor Heating in Tadley

In Tadley we put liquid or sand and cement screed over wet underfloor heating, at the right depth over the pipes, and bring it up to temperature in a controlled way. Fitting the pipes is your heating engineer's side of the job, not ours. What matters in this town is where the houses are in their renovation cycle. With so many post-war houses being updated, adding insulation and underfloor heating once a ground floor has been opened up is a common step here, and semi-detached houses make up 35% of Tadley's homes.

Adding heating when a Tadley ground floor is opened up

When an original floor comes out, or a rear extension goes on, the ground floor is open and the build-up can be designed from scratch. That is the most economical time to add wet underfloor heating, because the insulation, pipes and screed all go into the new floor rather than being built on top of the old one.

Pipe cover is the figure that drives everything else. With liquid, we leave 25mm or more over the pipes, making the floor about 45 to 50mm in all. Sand and cement needs closer to 45mm of cover, giving a thicker floor. In a post-war Tadley house, the new floor must still meet the existing doors and the bottom stair, and that gap can settle which screed is used. Floor height is often the tightest limit in a retrofit, and we measure it before recommending anything.

With no air trapped around the pipes, a liquid floor passes heat to the surface quickly and evenly. Sand and cement is worked around the pipes by hand, and it is the right choice for a heated shower room or where a cement base is needed. The two are compared side by side in our guide to liquid against sand and cement.

Pour day starts with our check of what lies under the pipes (insulation, membrane and the edge strip round the walls), and the pipes should have passed your installer's pressure test by then. If the insulation and membrane are not down yet, we can supply them.

Bringing a Tadley heated floor up to temperature

A new heated floor needs a patient start. Calcium sulphate can usually have heat put through it about 7 days after pouring. With sand and cement, keep the heating off for 21 days or more. From there, run it low and step it up over several days, as set out in the heating manufacturer's commissioning schedule. Going to full heat on the first day can crack the floor.

Used properly, the heating helps dry the floor, which shortens the wait for the flooring fitter. We hand over written guidance on the warm-up so the heating engineer, the builder and the homeowner are working to the same plan.

A heated rear extension often opens into the existing kitchen, so the join between old and new floors needs thought before the pour, not after it. Where the older floor stays and is simply uneven, levelling compound can bring it into line with the new one; see floor levelling in Tadley. For a pumped heated floor, read about liquid screed in Tadley. The same heated floor service is available in Thatcham.

Underfloor Heating Screed prices in Tadley

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our floor screeding cost guide or screed calculator.

Who lays your underfloor heating screed in Tadley

Underfloor heating loops marked out in red before floor screeding
Underfloor heating loops marked out in red before floor screeding.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor Heating Screed from Slough to Tadley

On the map, Tadley sits west-south-west of Slough, about 24.9 miles from our base in a straight line (postcodes including RG26), next to Thatcham (5.7 miles), Basingstoke (6.7 miles), Newbury (8.1 miles) and Reading (10.1 miles).

More on underfloor heating screed, part of our screeding services.

FAQs

Underfloor Heating Screed in Tadley: your questions

Can underfloor heating be added to a 1970s Tadley house?

Often, yes, once the old ground floor is coming out or an extension is going on anyway. Taking out the old floor leaves space for insulation, pipes and screed without changing the finished height. Where the old floor stays, the build-up raises it, so doors and thresholds need adjusting. We measure the height available before advising.

How long after screeding can the underfloor heating go on?

For calcium sulphate, roughly a week (7 days); for sand and cement, 21 days at the very least. Then bring the temperature up slowly across several days, as the heating system maker's commissioning schedule says. We leave written guidance so nobody turns it straight up to full heat, which can crack a new screed.

Who lays the underfloor heating pipes before you screed?

Your heating engineer. K & B screeds over the pipes; we do not lay them. Once your installer has laid them and pressure tested them, we go over the insulation, membrane and edge strip and screed on top. We are glad to talk to the installer about the pour date and pipe cover so the two jobs line up.