info@kandbscreeding.co.uk

Floor Levelling · Hertfordshire

Floor Levelling and Self Levelling Screed in Ware

In Ware, our self levelling compound turns uneven floors into a flat base ready for engineered wood, large tiles, vinyl or LVT. Flats built from the 1970s onwards often need levelling before new coverings go down, and 27% of Ware's homes were built between 1973 and 1999. A thin, correctly primed coat of compound is usually what stands between those floors and a new covering.

Flatter floors for Ware flats, extensions and laboratories

Levelling is about flatness, not strength. BS 8204 checks it with a 2m straightedge: the gap underneath may reach 3mm in class SR1, 5mm in SR2 and 10mm in SR3. SR1 is the class many thin sheet finishes demand, and LVT will telegraph any dip greater than that through its surface over time.

In an older flat, the starting point is often a concrete or screed base that has been under carpet for years. Once the old covering and adhesive are stripped, it shows ridges, patches and gentle hollows. A coat of compound, typically about 2mm to 10mm, brings it back to SR1.

In houses, a common task is the join between an extension and the original floor, where a small step or slope needs feathering out before one continuous floor covering runs through from the old kitchen into the new room.

Commercial buildings need the same thing on a larger scale. GSK, formerly Allen and Hanburys, runs large manufacturing and research plants in Ware, and pharmaceutical and laboratory buildings like these depend on flat, durable floors, usually with resin or sheet finishes over a carefully prepared base. We do not lay resin, but we can prepare and level the screed beneath specialist finishes, and our floor preparation service covers grinding and shot blasting.

Priming comes first on every job, with a product chosen for concrete, sand and cement or calcium sulphate.

Thin layers for Crib Street and when to rescreed

In Ware's listed and timber-framed buildings, including those on Crib Street, the conservation officer usually expects breathable build-ups and thin levelling layers, agreed before work starts. That makes product choice important, so talk to the council first and we will price what they approve. The aim in these buildings is usually a flat enough surface for the new covering with as little added depth and weight as possible.

Elsewhere, the question is whether compound is enough. The usual working range starts at about 2mm and tops out around 10mm, and certain compounds can be built up further. Where a floor is hollow, breaking up or further out than that, pouring compound thick only invites cracking and loss of bond. The honest answer then is to replace the screed, often with a new sand and cement screed, and level only if needed afterwards.

For very thin smoothing on a sound base, a latex compound of a few millimetres may be enough. Fast drying products keep a refit moving, which helps when a kitchen or bathroom refit has a fixed start date. For levelling nearby, see our floor levelling in Welwyn Garden City page.

How we price floor levelling in Ware

A fixed written price within 24 hours, once we know the area and the base. See our floor screeding cost guide.

Who levels your floor in Ware

Finished floor screed seen from the stairs
Finished floor screed seen from the stairs.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Floor Levelling from Slough to Ware

Ware is about 32.7 miles north-east of our Slough base as the crow flies, with postcodes including SG12. The nearest towns to it are Hertford (2.2 miles), Hoddesdon (3.9 miles), Harlow (6.4 miles) and Welwyn Garden City (7.4 miles).

More on floor levelling, part of our screeding services. Not sure whether you need a thin compound or a full flowing screed? See self levelling screed explained.

FAQs

Floor Levelling in Ware: your questions

Do I need to level my floor before fitting LVT?

Usually, yes. For LVT or sheet vinyl, the maker will often want SR1: 3mm at most under a 2m straightedge. Older floors often fall short once the old covering comes up. A thin coat of compound, correctly primed, gives the flat surface that thin flooring needs.

Can levelling compound go over an old quarry tile floor?

Provided the tiles are clean and still stuck fast, it often can. They are degreased, any loose tiles fixed, and a primer made for non-porous surfaces applied before the compound goes down. If tiles are loose or hollow across the room, lifting them and screeding may be the better option. We check before recommending either.

How long before I can fit flooring on levelling compound?

That comes down to which product is used and how thick it goes. Fast drying compounds are quicker, while standard products need longer. Thicker layers take more time. We tell you the expected date for your Ware floor when we price the job, and confirm it before the fitter is booked.

Free, no-obligation quote

A fixed price for your Ware floor