Do You Need to Screed Before LVT, Tiles, Laminate or Carpet?

Not always. You need a new screed if there is no floor, the old screed is weak or the floor is far out of level; a thin smoothing compound if it is sound but slightly uneven, the usual answer before LVT and vinyl; and nothing if it already meets the flooring maker's flatness and moisture limits.

New flooring is only as good as what it sits on. LVT shows every ridge, laminate clicks and bounces over hollows, tiles lip or crack, and even carpet wears unevenly on a poor base. The question is rarely "screed or no screed". It is whether the floor you have is sound, flat enough and dry enough for the finish you have chosen.

The short answer

You need a new screed if there is no floor yet, if the existing screed is weak, hollow or badly cracked, or if the floor is far out of level.

You need a smoothing compound, not a screed, if the floor is sound but rough, patched or slightly uneven. This is the usual answer before LVT and sheet vinyl.

You may need nothing if the floor already meets the flooring manufacturer's flatness and moisture limits, which is more likely with carpet and floating laminate than with glued LVT or vinyl.

Flatness: what SR1, SR2 and SR3 mean

Short answer: flatness is measured as the biggest gap under a 2 metre straightedge, and BS 8204 sets three classes.

ClassMaximum gap under a 2m straightedgeTypical use
SR13mmHigh standard floors, thin sheet finishes
SR25mmNormal standard for most floors
SR310mmUtility standard, thick or tolerant finishes

Swipe the table sideways to see every column.

To check a floor, lay a 2 metre straightedge in several directions across the room, slide a gauge or ruler under it at the lowest point, and note the biggest gap. Also look for small, sharp ridges and trowel marks: a floor can pass a 2 metre test and still show bumps through thin vinyl.

What different floor coverings ask for

Short answer: thin, glued finishes ask the most of the floor; floating and soft finishes are more forgiving.

Flooring manufacturers publish their own subfloor limits, and they override any general rule. These are examples from installation guides we have read:

Floor coveringFlatness the manufacturer statesMoisture limit the manufacturer states
Glue down LVT (Karndean, November 2023)Firm, hard, flat, level and smooth; smoothing compound applied in line with the underlayment makerBelow 75% RH by hygrometer, or no more than 2% CM for cement screeds and 0.5% CM for calcium sulphate screeds
Rigid core click LVT (Karndean, January 2024)Unevenness no more than 5mm below level over 3m in any direction; high spots removedBelow 95% RH by hygrometer, or no more than 3% CM cement and 1.4% CM calcium sulphate
Laminate (Quick-Step, July 2026)Less than 4mm under a 2m straightedge and less than 1mm under 20cmCement below 2.5 CM% or 75% RH; calcium sulphate below 0.5 CM% or 75% RH; lower limits over heated floors
CarpetNo figure in the sources we readBS 5325 recommends a hygrometer test; 75% RH is the usual limit for most floor coverings
Ceramic and porcelain tilesFollow the tile adhesive makerFollow the tile adhesive maker; calcium sulphate screeds need laitance removed and a primer

Swipe the table sideways to see every column.

Three things are clear from this. Glued LVT and vinyl need the smoothest, driest base, which usually means a thin floor levelling compound to SR1 standard over the screed. Click products are more tolerant of flatness but still have limits. And two products from the same brand can have very different requirements, so always read the guide for the exact product you are buying.

Quick-Step also specifies its own underlay with a vapour barrier on mineral subfloors such as screed, and asks for floor heating to be started at least two weeks before laying.

Moisture: limits and how to test

Short answer: most floor coverings need the base at or below 75% relative humidity, measured with a hygrometer; solid timber needs 65%.

F. Ball, which makes subfloor products, summarises the British Standards this way: BS 8203 (resilient floor coverings), BS 5325 (textile floor coverings) and BS 8201 (wood floor coverings) recommend testing with a hygrometer, and a base "can be considered dry enough to install most floorcoverings" if readings do not exceed 75% RH, or 65% RH for solid timber.

How the test works:

  1. A hygrometer hood is sealed to the floor, or a probe is placed in a hole drilled into the screed.
  2. The air trapped under the hood comes into balance with the moisture in the screed.
  3. The relative humidity reading is compared with the flooring and adhesive manufacturers' limits.

Several readings across the floor give a fairer picture than one, and readings near external walls, doors and thick areas are worth taking. Some manufacturers also accept the calcium carbide (CM) test, which measures moisture by weight; the table above shows that calcium sulphate screeds have much lower CM limits than cement screeds.

A new screed takes time to reach these limits. Our working rule is about one day per millimetre for the first 40mm, then slower. Our guide on how long screed takes to dry covers the factors.

If the floor is still too wet

A surface damp proof membrane can let flooring go down over a base that is not dry enough. F. Ball's Stopgap F77, a two part epoxy membrane, is stated for use up to 98% RH, or up to 90% RH over underfloor heating screeds, with hygrometer readings taken in accordance with Appendix A of BS 8203 first. It adds cost and must suit the screed and the flooring, so it is a decision to plan, not a last minute fix.

Screeding over an existing floor

Short answer: often you can level over what is there, if it is sound and well bonded. If it is not, it comes up first.

Existing floorUsual approach
Sound concrete or screed, slightly unevenPrepare, prime and apply a smoothing compound
Concrete with paint, adhesive or laitanceGrind or shot blast, then prime and smooth. See concrete floor grinding
Calcium sulphate (anhydrite) screedRemove laitance, check moisture, prime, then smooth
Firmly bonded quarry or ceramic tilesClean, replace loose tiles, then a suitable two part or latex screed
Timber floorboardsFix down, overboard with flooring grade plywood, then a compound made for flexible bases
Weak, hollow or cracked screedRepair or replace. See screed repairs
No floor, or a big change in levelA new screed. See floor screeding

Swipe the table sideways to see every column.

Karndean's glue down guide makes the same points: concrete and sand and cement screeds should be mechanically abraded to remove laitance, paint, plaster or adhesive; calcium sulphate screeds need the screed maker's advice on primers and compounds, with all laitance removed; and plywood should be fixed and its joints smoothed with a suitable compound.

If you are not sure whether to use a compound or a screed, our guide to latex, self levelling compound or a new screed walks through the decision. All of this starts with floor preparation.

Why screeds crack, and whether it matters for flooring

Short answer: most cracks come from shrinkage, thin sections, poor compaction or drying too fast. Fine, stable cracks can be filled; cracks that move need repair before flooring.

Common causes:

  • Drying shrinkage. Cement screeds shrink as they dry. Without curing and movement joints, fine cracks form.
  • Too thin. A screed below its minimum depth for its construction has too little strength. The Mineral Products Association's data sheet gives a minimum of 25mm bonded, 50mm unbonded and 75mm floating, with 65mm normally satisfactory in housing.
  • Poor compaction in sand and cement screeds, leaving voids that crack under load.
  • Curling. The MPA notes that curling and hollowness are likely at joints, cracks and perimeters of unbonded screeds; fully bonded screeds carry the least risk.
  • Drying too fast or heating too early. Direct heat, or underfloor heating turned up before the screed is ready, can crack and curl it.
  • No curing. The MPA advises covering cement screeds to retain moisture for at least five days.
  • Movement from below, such as joints in the slab or building that were not carried through the screed.

Thin, glued finishes such as vinyl and LVT will show cracks and ridges, and tiles can crack over a moving crack. Before any flooring goes down, cracks should be assessed: stable shrinkage cracks can usually be filled, while moving or widespread cracking points to a screed that needs repair or replacing.

A simple pre flooring checklist

  1. Sound? No hollow sounds, no powdery surface, no loose areas.
  2. Flat? Checked with a 2 metre straightedge against the flooring maker's limit.
  3. Smooth? No sharp ridges, trowel marks or debris.
  4. Dry? Hygrometer readings within the flooring and adhesive limits.
  5. Clean and primed? Dust, laitance and contamination removed, with the right primer for the base.
  6. Cracks dealt with? Stable cracks filled, moving cracks repaired.

Get your floor ready for its finish

Tell us which flooring is going down and we will advise whether the floor needs a screed, a compound or nothing at all. Send us the floor area in m², the depth you have to work with, what is going on top and the site postcode. We call back the same day and give you a fixed written price within 24 hours. Ask for a quotation or call 07466 650936.

Sources

FAQs

Frequently asked questions

Do I need to screed before laying LVT?

Not always. If the existing floor is sound and dry, a thin smoothing compound is usually enough. Glue down LVT needs a smooth, flat base, and Karndean's guide sets a limit below 75% RH. A new screed is only needed if the floor is weak, missing or far out of level.

Can I lay laminate on an uneven floor?

Only within the manufacturer's limit. Quick-Step's July 2026 guide asks for less than 4mm under a 2 metre straightedge and less than 1mm under 20cm, with sanding or a smoothing compound if the floor is outside that.

Do tiles need a perfectly flat screed?

Tiles need a flat, sound base that meets the tile adhesive maker's requirements. Large format tiles are less forgiving than small ones. Calcium sulphate screeds also need their laitance removed and a compatible primer before tiling.

Can you put carpet straight onto screed?

Usually, once the screed is dry and sound, with a suitable underlay. BS 5325 recommends a hygrometer test, and 75% RH is the usual limit for most floor coverings.

What does SR1 mean?

SR1 is the highest surface regularity class in BS 8204: no gap greater than 3mm under a 2 metre straightedge. It is the class many thin sheet finishes need.

Can I lay flooring on a screed with hairline cracks?

Fine, stable shrinkage cracks can often be filled and smoothed over. Cracks that open and close, or widespread cracking, need investigating and repairing first, or they will show through or break the finish.

Our services

Services mentioned in this article

Finished screed floor in a new build room

Floor Levelling

Self levelling compounds and subfloor levelling that turn an uneven screed or slab into a smooth, flat base for LVT, vinyl, tiles and engineered wood.

Smooth liquid screed finish in a narrow room

Self Levelling Screed

Self levelling screed covers two different jobs: a thin levelling compound that smooths a sound floor, and a full depth flowing screed that forms the floor itself. We lay both and tell you which yours needs.

Large open plan room with a finished floor screed

Latex Screed

Two part latex levelling compound laid a few millimetres thick over overboarded timber, old tiles and uneven concrete, giving vinyl, LVT and carpet a smooth, flat base.