Over wet heating pipes in a Braintree home, we pour liquid screed or hand-lay sand and cement to the correct depth above them, and hand you a written warm-up plan. Fitting the pipes is your heating engineer's part of the job. The job that stands out locally is matching: newer houses in Great Notley and Mark's Farm may already have heated screed floors, so a garden room or extension has to be built up to join them at the same level.

Matching an existing heated floor in Great Notley

Building a garden room or extension onto a newer house with underfloor heating raises a practical question: how does the new floor meet the old one? It has to finish at exactly the same level, carry its own heating circuit and warm up at a similar rate, or the join will show as a step, a crack or a cold strip.

We start from the level of the floor already there. We check the finished level in the house and plan the new insulation, pipes and screed depth backwards from it. Pumped screed must sit 25mm or more above the pipes, which normally comes to 45 to 50mm overall. Hand-laid needs roughly 45mm above them and makes the build thicker. If the existing floor is itself a flowing screed, pumped liquid screed for the extension tends to give the closest match in depth and heat response.

Where the new and old floors meet, a movement joint is planned so the two screeds can expand and contract independently. Tiles or stone laid across that line need a joint above it too.

The pipes are not ours to fit. Laying and pressure testing them falls to your heating engineer, and before we pour we look over the insulation, membrane, edge strip and pipe clips. If your installer is not providing the insulation and membrane, we can. For whole-floor projects in older homes, the sand and cement screed in Braintree page covers retrofitting after a floor is dug out.

Heat-up schedules for new Braintree heated floors

Old house or new, a heated floor has to be warmed slowly the first time. Over calcium sulphate, the system can normally come on about a week after the pour; over sand and cement, give it 21 days at least. After that, nudge the flow temperature up in small steps of a few degrees over several days, and hold it before running at full heat. Going too fast risks cracking the screed or opening the joint with the existing floor.

Those steps come from us on paper, so the heating engineer and your flooring fitter are working to one plan. For a calcium sulphate floor, the heating can also force dry the screed once it is ready, which is covered in our guide on how long screed takes to dry.

On a retrofit in an older terrace near the centre or in Bocking, floor height is usually the limit. Adding insulation, pipes and a screed to a floor laid on earth means digging deep enough to fit everything under the existing thresholds.

For a heated floor in liquid screed, the published 2026 UK price is £20 to £35 per m². Neighbouring towns are priced on the same basis, including underfloor heating screed in Witham.

Heating the old kitchen in a Braintree post war semi

Semis from the post war decades in Braintree tend to generate kitchen extensions and replacements of old concrete floors. When the old kitchen floor is coming out anyway, it is the moment to decide whether the heating in the new extension should carry on into the original room.

The old concrete is broken out to a depth that leaves room for the new layers, and that depth is measured from the finished level of the hallway, not from the old floor, so the heated kitchen meets the rest of the house without a step. A damp proof membrane goes down first and is joined to the extension's membrane so there is no gap for moisture between the two, then the insulation, then the pipes, fitted and tested by your heating engineer.

With both areas at the same base level, one screed can run across the old kitchen and the extension together. The line of the old back wall is still a change of base underneath, so whether it needs a joint is decided before the pour, along with any heating zones.

If the kitchen has a small utility off it where a leak is possible, that room is laid in a cement based screed. Homes built between 1945 and 1972 make up 24% of Braintree, so this choice comes up on a lot of kitchen projects. The insulation and membranes work page covers the layers below.

Underfloor heating screed prices in Braintree

Liquid screed over underfloor heating: £20 to £35 per m² supplied and laid (trade2base, June 2026), so £700 to £1,230 for 35 m². trade2base gives these figures excluding VAT. See our liquid screed cost per m² guide, the floor screeding cost guide or the screed calculator.

Who lays your underfloor heating screed in Braintree

Underfloor heating pipes covering a large room before screeding
Underfloor heating pipes covering a large room before screeding.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Underfloor heating screed from Slough to Braintree

Braintree is about 56.7 miles east-north-east of our Slough base as the crow flies, with postcodes including CM7 and CM77. The nearest towns to it are Halstead (5.7 miles), Witham (6.6 miles), Great Dunmow (8.1 miles) and Chelmsford (10.3 miles).

Your quote will say whether the screed lorry needs road space in Braintree. If it does, a bay suspension can be requested from the North Essex Parking Partnership (bay suspension). The council building control service for Braintree is Braintree District Council Building Control. A new extension floor usually needs building regulations approval, and Part L covers its insulation in England.

More on underfloor heating screed, part of our screeding services. For every screed we lay locally, see floor screeding in Braintree.

FAQs

Underfloor heating screed in Braintree: your questions

How thick is the screed over underfloor heating pipes?

Pumped screed needs 25mm or more over the pipes, so it typically ends up 45 to 50mm thick. Hand-laid sand and cement needs around 45mm over them, giving a thicker floor. For a Braintree garden room joining a heated house, the depth is also set by where the existing floor finishes.

When can I turn the underfloor heating on after screeding?

Calcium sulphate can take heat from around day 7; sand and cement needs 21 days or more. Even then, step the temperature up over several days instead of going straight to full. You get the plan from us in writing; the heating engineer then commissions the system to follow it.

Does the extension floor need insulation under the heating pipes?

Yes. Insulation below the pipes sends the heat up into the room rather than down into the ground, which is what makes a heated floor efficient. It sits under a membrane, with the pipes clipped above it and the screed on top. If it helps, our team can provide and put down both layers ahead of your installer.

What if digging out the old kitchen floor in a Braintree semi is too disruptive?

Then the extension can be heated on its own. Its floor is built up to meet the old kitchen at the same level, and the existing floor is checked and, if it is sound but uneven, levelled so the finished surfaces line up. The kitchen can still be dug out and heated later, though that means lifting whatever flooring has gone down by then.