Sand and Cement Screed · Essex

Sand and Cement Screed in Braintree

In Braintree we batch sand and cement on site, adjusting it room by room, then lay and compact it by hand to a dense, level floor. It fits older Braintree houses well. 9% of Braintree's homes were built before 1919 and a further 11% between the wars, and older terraced houses near the centre and in Bocking may have floors laid straight on earth, which need digging out and rebuilding properly.

Rebuilding earth floors in Bocking and central Braintree

A ground floor laid straight on earth has no damp proof membrane and no insulation. It can feel cold and damp underfoot, and new coverings laid over it may not last. The fix is to dig it out to a depth that allows for a membrane, a layer of insulation and a new screed, then build it back up so the finished floor meets the existing doors and thresholds.

In a Bocking terrace, laying by hand is normally the sensible way to do that last layer. Floated over the insulation in a home, it is typically 65mm deep. It is mixed on site, so the mix and depth can change from room to room, and it can be brought right up to old, out-of-square walls and awkward doorways. Where the rooms are small and separate, hand laying handles them well.

It is also cement based, which matters where a bathroom or kitchen floor may get wet. Calcium sulphate screeds do not suit those areas, so sand and cement is the safer option for wet rooms, utility rooms and any floor laid to falls. For a shower floor, the screed is formed by hand to fall towards the drain.

Many of these jobs involve more than the screed. The floor preparation service covers getting the base ready, and our insulation and membranes service supplies and lays the layers beneath the new floor.

Braintree's post war semis and bonded screeds

Plenty of hand-laid work stops well short of a rebuild. Some floors in semis from the post war decades are sound and only need building up for a new finish, while others are being replaced as part of a kitchen extension. If the old concrete is solid and clean, we prepare it and bond 25 to 40mm of screed directly to it, raising the floor with no digging. How that bond is formed is covered under bonded screeding.

Where the concrete has failed, the old floor comes out and a floating 65mm screed goes in over new insulation.

A garage being converted is a similar case. Its floor has to come up to the level of the house, normally with insulation and a membrane under the new screed, and our guide to garage floor screeding gives the depths.

What you give up is drying time. A 65mm floor will be several weeks off most coverings, losing around a millimetre a day to 40mm and slowing after that, though faster drying mixes can trim the wait. If a heated floor is part of the plan, the underfloor heating screed page covers pipe cover and the 21 day wait before the heating can go on.

Sand and Cement Screed prices in Braintree

Sand and cement screed: £18 to £25 per m² supplied and laid (MyJobQuote, August 2026), so £450 to £630 for 25 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your sand and cement screed in Braintree

Screeder power floating a sand and cement floor screed
Screeder power floating a sand and cement floor screed.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Sand and Cement Screed from Slough to Braintree

Braintree is about 56.7 miles east-north-east of our Slough base as the crow flies, with postcodes including CM7 and CM77. The nearest towns to it are Halstead (5.7 miles), Witham (6.6 miles), Great Dunmow (8.1 miles) and Chelmsford (10.3 miles).

More on sand & cement screed, part of our screeding services.

FAQs

Sand and Cement Screed in Braintree: your questions

How deep do I need to dig out an old Braintree floor for a new screed?

Add together the screed, the insulation and the membrane. Floating sand and cement normally runs to 65mm, and the insulation thickness depends on the product chosen. We check the existing floor, door and threshold levels first, so the dig depth works for the finished floor height and nothing has to be trimmed or raised afterwards.

Does sand and cement screed crack?

It can if it dries too fast, is laid too thin or has no joints over a large area. Good compaction, enough depth and careful curing all reduce the risk, and adding fibres, at £1 to £3 per m², cuts down shrinkage cracks. Loose or hollow areas are a fault and should be put right before any flooring goes down.

Can I walk on sand and cement screed the next day?

After 24 to 48 hours you can normally step on it with care, but it is still a young floor. Barrows, heavy loads and piles of materials should stay off it for longer than that. In an older Braintree house under renovation, plan the other trades so they are not working across the new floor in its first days.

Free, no-obligation quote

A fixed price for your Braintree floor