info@kandbscreeding.co.uk

Sand and Cement Screed · Worcestershire

Sand and Cement Screeding in Evesham

Our Evesham crew batches sand and cement on site and tamps it down by hand into a dense, level floor, one that tolerates damp far better than calcium sulphate ever could. That matters here. Close to the Avon, floors in older homes in Bengeworth and the town centre may need a proper membrane and a screed suited to damp conditions, and 15% of Evesham's homes were built before 1919.

Relaying ground floors in Bengeworth and central Evesham

Refurbishing an older house near the river often means taking the ground floor right back. The original floor may be damp, cracked or sunk, and after a flood it is often stripped out entirely before the house can be put back together. Relaying it properly is the chance to add the membrane and insulation it never had.

The rebuild goes in layers. A damp proof membrane comes first, lapped to link with the wall damp proofing. If the depth allows, insulation goes on next. Then a sand and cement screed is laid on top, either floating over the insulation at about 65mm, or bonded straight to a sound slab at 25 to 40mm where height is tight. Choosing between the two is covered in our guide to screed depths.

Sand and cement makes sense for these jobs for three reasons. It is cement based, so it is far less vulnerable to water than calcium sulphate. It is mixed in the quantity and consistency each room needs, which suits older houses with uneven walls and changes of level. It also bears weight sooner, letting the other trades back in earlier.

Preparation is a large part of this kind of job. Breaking out the old floor, clearing the debris and getting the base sound is covered by our floor preparation service, so the screed is laid on something that will last.

Wet rooms, falls and garages in Evesham houses

Terraced houses make up 23% of Evesham's homes, and in houses like these the work is often one room at a time: a bathroom, a utility, a back kitchen. A hand-laid screed is cost effective at that scale, because there is no pump to bring in.

Wet rooms rely on it. A level-access shower floor must fall gently to the drain, and that shape is formed by hand in a cement based screed, which is what a wet room needs beneath its tanking.

Garages are the other natural fit. A floor that may take a car or become a habitable room needs a cement substrate and early strength. Our garage conversion screed guide covers what goes underneath.

The trade-off is drying. At about one day per millimetre through the first 40mm, and slower after, a 65mm floor needs time, so set the flooring date accordingly. Fibres mixed in as a fibre reinforced screed help against cracking for an extra £1 to £3 a square metre, and faster drying mixes are available at £20 to £28 a square metre for tight programmes.

Sand and Cement Screed prices in Evesham

Sand and cement screed: £18 to £25 per m² supplied and laid (MyJobQuote, August 2026), so £450 to £630 for 25 m². MyJobQuote does not say whether these figures include VAT. See our floor screeding cost guide or screed calculator.

Who lays your sand and cement screed in Evesham

Finished floor screed in a large loft space
Finished floor screed in a large loft space.

K & B Screeding’s own team, led by director Donatas Bardisevicius. Founded 2019, company 12298780.

See what customers say in our Google reviews and on our testimonials page.

Sand and Cement Screed from Slough to Evesham

As the crow flies, our yard in Slough is about 67.9 miles from Evesham, which lies to the north-west. Postcodes here include WR11, and Tewkesbury (11.3 miles), Stratford-upon-Avon (12.4 miles), Cheltenham (14.4 miles) and Redditch (14.8 miles) are close by.

More on sand & cement screed, part of our screeding services.

FAQs

Sand and Cement Screed in Evesham: your questions

What screed should go back after a flood strip-out in Evesham?

Put back a cement screed, normally laid by hand, on top of a fresh damp proof membrane. It copes with water far better than calcium sulphate. The base and walls must be dry enough first, and any insulation chosen should suit a floor that could get wet again. We plan the build-up before quoting.

Can sand and cement screed be laid over underfloor heating?

Yes. It needs about 45mm of cover above the pipes and careful compaction around them so there are no voids. The heating should not be switched on for at least 21 days after laying, and then only gradually. That makes it the one to use for a heated wet room, where a cement base is needed.

Is sand and cement screed cheaper than liquid screed?

On 2026 published UK prices it runs between £18 and £25 a square metre, while liquid screed is £24 to £31. For a small room or an awkward layout, hand-laying often comes out cheaper. On large open floors, liquid screed can close the gap because it goes down faster and thinner.

Free, no-obligation quote

A fixed price for your Evesham floor